Should we build more large dams? The actual costs of hydropower megaproject development
Tài liệu tham khảo
Ansar, A., Flyvbjerg, B., Budzier, A., 2013. Do “Hard States” Make Better Decisions? Incentives versus Biases. Unpublished manuscript. Saïd Business School, University of Oxford, 42 pp.
Ansar, A., Flyvbjerg, B., Budzier, A., 2012. Big is Fragile: The Effects of Temporal Uncertainty and Sunk Costs on the Outcomes of Big Ventures. Unpublished manuscript. Saïd Business School, University of Oxford, 58 pp.
Bacon, 1998, Estimating construction costs and schedules: experience with power generation projects in developing countries, Energy Policy, 26, 317, 10.1016/S0301-4215(97)00164-X
Bakker, 1999, The politics of hydropower: developing the Mekong, Political Geogr., 18, 209, 10.1016/S0962-6298(98)00085-7
Bertisen, 2008, Bias and Error in Mine Project Capital Cost Estimation., The Eng. Economist, 53, 118, 10.1080/00137910802058533
Billington, D.P., Jackson, D.C., 2006. Big Dams of the New Deal Era: A Confluence of Engineering and Politics. University of Oklahoma Press.
Buehler, 1994, Exploring the“ planning fallacy”: Why people underestimate their task completion times, J. Pers. Soc. Psychol., 67, 366, 10.1037/0022-3514.67.3.366
Bulow, 1990, Cleaning up third world debt without getting taken to the cleaners, J. Econ. Perspect., 4, 31, 10.1257/jep.4.1.31
Copeland, 2004, A real-world way to manage real options, Harv. Bus. Rev., 82, 90
Dawes, 1989, Clinical versus actuarial judgment, Science, 243, 1668, 10.1126/science.2648573
Duflo, 2007, Dams, Q. J. Econ., 122, 601, 10.1162/qjec.122.2.601
Federal Transit Administration (FTA), 2003. Predicted and Actual Impacts of New Starts Projects: Capital Cost, Operating Cost and Ridership Data. U.S. Department of Transportation, Washington, DC.
Flyvbjerg, 2003, Delusions of success: comment on Dan Lovallo and Daniel Kahneman, Harv. Bus. Rev., 81, 121
Flyvbjerg, 2006, From Nobel Prize to project management: getting risks right, Project Manage. J., 37, 5, 10.1177/875697280603700302
Flyvbjerg, 2008, Curbing optimism bias and strategic misrepresentation in planning: reference class forecasting in practice, Eur. Plann. Stud., 16, 3, 10.1080/09654310701747936
Flyvbjerg, 2009, Survival of the unfittest: why the worst infrastructure gets built—and what we can do about it, Oxford Rev. Econ. Policy, 25, 344, 10.1093/oxrep/grp024
Flyvbjerg, 2003
Flyvbjerg, 2011, Why your IT project may be riskier than you think, Harv. Bus. Rev., 89, 23
Flyvbjerg, B., COWI, 2004. Procedures for dealing with optimism bias in transport planning: Guidance document 2006–09 [WWW Document]. URL goo.gl/lLiNj
Flyvbjerg, 2005, How (in) accurate are demand forecasts in public works projects, J. Am. Plann. Assoc., 71, 131, 10.1080/01944360508976688
Flyvbjerg, 2002, Underestimating costs in public works projects: error or lie?, J. Am. Plann. Assoc., 68, 279, 10.1080/01944360208976273
Flyvbjerg, 2009, Delusion and deception in large infrastructure projects, Calif. Manage. Rev., 51
Gelman, 2007
Gilovich, 2002
Goel, 2012
Goldstein, 2010
Hoek, E., Palmieri, A., 1998. Geotechnical risks on large civil engineering projects. In: Proceedings of the 8th Congres IAEG, pp. 79–88.
Hufschmidt, 1970, Systematic errors in cost estimates for public investment projects
ICOLD, 2010. International. Commission on Large Dams [WWW Document]. URL 〈http://www.icold-cigb.org/〉.
IEA, 2011. Policies and Scenarios [WWW Document]. URL 〈http://www.iea.org/publications/scenariosandprojections/〉.
Kahneman, 1994, New challenges to the rationality assumption, J. Inst. Theor. Econ., 150, 18
Kahneman, D., 2011. Thinking, Fast and Slow, 1st ed. Farrar, Straus and Giroux, New York.
Kahneman, 1993, Timid choices and bold forecasts: a cognitive perspective on risk taking, Manage. Sci., 17, 10.1287/mnsc.39.1.17
Kahneman, 1979, Prospect theory: an analysis of decision under risk, Econometrica, 263, 10.2307/1914185
Kahneman, 1979, Intuitive prediction: biases and corrective procedures
Kessides, I.N., 2011. Chaos in Power: Pakistan's Electricity Crisis.
Kreft, 1998
Laird, 1982, Random-effects models for longitudinal data, Biometrics, 963, 10.2307/2529876
Lovallo, 2003, Delusions of success, Harv. Bus. Rev., 81, 56
Luehrman, 1998, Strategy as a portfolio of real options, Harv. Bus. Rev., 76, 89
McCully, 2001
Merewitz, 1973
Merrow, 1988
Mold, 2012, Will it all end in tears? Infrastructure spending and African development in historical perspective, J. Int. Dev., 24, 237, 10.1002/jid.2818
Mott MacDonald, 2002
Nilsson, 2005, Fragmentation and flow regulation of the world's large river systems, Science, 308, 405, 10.1126/science.1107887
Pickrell, D.H., 1989. Urban Rail Transit Projects: Forecast Versus Actual Ridership and Costs (No. PB90148693), Office of Grants Management, Urban Mass Transportation Administration. Transportation System Center, U.S. Department of Transportation, Cambridge, MA.
Pickrell, 1992, A desire named streetcar: fantasy and fact in rail transit planning. American Planning Association, J. Am. Plann. Assoc., 58, 158, 10.1080/01944369208975791
Rasbash, 2009
Recchia, 2010, R-squared measures for two-level hierarchical linear models using SAS, J. Stat. Softw., 32
Richter, 2010, Lost in development's shadow: the downstream human consequences of dams, Water Alternatives, 3, 14
Salazar, 2000, Damming the child of the ocean: the Three Gorges project, J. Environ. Dev., 9, 160, 10.1177/107049650000900204
Scudder, 2005
Schlissel, 2008
Singh, 2002
Sovacool, 2011, Behind an ambitious megaproject in Asia: the history and implications of the Bakun hydroelectric dam in Borneo, Energy Policy, 39, 4842, 10.1016/j.enpol.2011.06.035
Sovacool, 2013
Stone, 2011, Hydropower. The legacy of the Three Gorges Dam, Science, 333, 817, 10.1126/science.333.6044.817
Taleb, N.N., 2010. The Black Swan: The Impact of the Highly Improbable with a new section: “On Robustness and Fragility”, 2nd ed. Random House Trade Paperbacks.
Tversky, 1974, Judgment under uncertainty: heuristics and biases, Science, 185, 1124, 10.1126/science.185.4157.1124
Wachs, 1989, When planners lie with numbers, J. Am. Planning Assoc., 55, 476
WAPDA, 2011. Diamer-Basha Dam Project Status as on 20 June 2011.
World Bank, 1968. Report and Recommendation of the President to the Executive Directors on a Proposed Loan for the Tarbela Project and on Proposed Extension of Closing Dates of Loan 266-PAK (Indus Basin Project), Pakistan (No. P-616). The World Bank, Washington, DC.
World Bank, 1970. Staff Appraisal Report (pu-31a) of the Chivor Hydroelectric Project, Interconexion Electrico S.A., Colombia (No. PU-31a). The World Bank, Washington, DC.
World Bank, 1973. Staff Appraisal Report (150a-BR) of the Itumbiara Hydroelectric Power Project, FURNAS, Brazil (No. 150a-BR). The World Bank, Washington, DC.
World Bank, 1996. Estimating Construction Costs and Schedules: Experience with Power Generation Projects in Developing Countries (No. WTP325). The World Bank, Washington, DC.
World Commission on Dams (WCD), 2000. Cross-Check Survey: Final Report. Cape Town, South Africa.
Ziv, 2012, Trading-off fish biodiversity, food security, and hydropower in the Mekong River Basin, Proc. Natl Acad. Sci., 109, 5609, 10.1073/pnas.1201423109