Scheduling the construction of value and discount weighted trees for maximum net present value

Computers & Operations Research - Tập 115 - Trang 104578 - 2020
P.A. Grossman1, M. Brazil2, J.H. Rubinstein3, D.A. Thomas1
1Department of Mechanical Engineering, The University of Melbourne, VIC 3010, Australia
2Department of Electrical and Electronic Engineering, The University of Melbourne, Vic. 3010, Australia
3Department of Mathematics and Statistics, The University of Melbourne, VIC 3010, Australia

Tài liệu tham khảo

Alford, 2007, Optimisation in underground mining, 561 Blattman, 2003, Creation of an underground mine development sequencing optimizer Brazil, 2008, Decline design in underground mines using constrained path optimisation, Min. Technol. Trans. Inst. Min. Metall., 117, 93 Brazil, 2013, Improving underground mine access layouts using software tools, Interfaces (Providence), 44, 195, 10.1287/inte.2013.0691 Elkington, 2009, Optimising value for an underground project configuration, 249 Elmaghraby, 1990, The scheduling of activities to maximize the net present value of projects, Eur. J. Oper. Res., 49, 35, 10.1016/0377-2217(90)90118-U Kuchta, 2003, Production scheduling at LKAB’s Kiruna mine using mixed integer programming, Min Eng, 35 Lawrence, 1991, Scheduling a single machine to maximize net present value, Int. J. Prod. Res., 29, 1141, 10.1080/00207549108930124 Lerchs, 1965, Optimum design of open-pit mines, Trans. CIM, 68, 17 Newman, 2010, A review of operations research in mine planning, Interfaces (Providence), 40, 222, 10.1287/inte.1090.0492 O’Sullivan, 2014, Extraction and backfill scheduling in a complex underground mine, Interfaces (Providence), 44, 204, 10.1287/inte.2013.0730 Pinedo, 2016 Russell, 1970, Cash flows in networks, Manage. Sci., 16, 357, 10.1287/mnsc.16.5.357 Schutt, 2012, Maximising the net present value for resource-constrained project scheduling, 362 Sepil, 1994, Comment on Elmaghraby and Herroelen’s “The scheduling of activities to maximize the net present value of projects”, Eur. J. Oper. Res., 73, 185, 10.1016/0377-2217(94)90161-9 Sirinanda, 2015, Maximizing the net present value of a Steiner tree, J. Global Optim., 62, 391, 10.1007/s10898-014-0246-3 Tantisuvanichkul, 2011, Maximizing net present value a review through literature, IPEDR, 15, 93 Topal, 2008, Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling, J. South Afr. Inst. Min. Metall., 108, 99 Vanhoucke, 1999, On Maximizing the Net Present Value of a Project under Resource Constraints