Scheduling in an assembly-type production chain with batch transfer

Omega - Tập 35 Số 2 - Trang 143-151 - 2007
Bertrand M.T. Lin1, T.C.E. Cheng2, A.S.C. Chou3
1Department of Information and Finance Management, Institute of Information Management, National Chiao Tung University, Hsinchu 300, Taiwan#TAB#
2Department of Logistics, The Hong Kong Polytechnic University, Kowloon, Hong Kong
3Dept. of Information Management, Ming Chuan University, Taoyuan 333, Taiwan

Tóm tắt

Từ khóa


Tài liệu tham khảo

Johnson, 1954, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, 1, 61, 10.1002/nav.3800010110

Pinedo, 2001

Reisman, 1997, Flowshop scheduling/sequencing research: a statistical review of the literature, 1952–1994, IEEE Transactions on Engineering Management, 44, 316, 10.1109/17.618173

Lee, 1993, Minimizing makespan in the 3-machine assembly-type flowshop scheduling problem, Management Science, 39, 616, 10.1287/mnsc.39.5.616

Garey, 1976, The complexity of flowshop and job shop scheduling, Mathematics of Operations Research, 1, 117, 10.1287/moor.1.2.117

Bhatnagar, 1993, Models for multi-plant coordination, European Journal of Operational Research, 67, 141, 10.1016/0377-2217(93)90058-U

Sun, 2003, Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling, European Journal of Operational Research, 146, 498, 10.1016/S0377-2217(02)00245-X

Potts, 1992, Integrating scheduling with batching and lot-sizing a review of algorithms and complexity, Journal of the Operational Research Society, 43, 95, 10.1057/jors.1992.66

Webster, 1995, Scheduling groups of jobs on a single machine, Operations Research, 43, 692, 10.1287/opre.43.4.692

Allahverdi, 1999, A review of scheduling research involving setup considerations, Omega, 27, 219, 10.1016/S0305-0483(98)00042-5

Cheng, 2000, A review of flowshop scheduling research with setup times, Production and Operations Management, 9, 262, 10.1111/j.1937-5956.2000.tb00137.x

Potts, 2000, Scheduling with batching: a review, European Journal of Operational Research, 102, 228, 10.1016/S0377-2217(99)00153-8

Lee, 1992, Efficient algorithms for scheduling semiconductor burn-in operations, Operations Research, 40, 764, 10.1287/opre.40.4.764

Ahmadi, 1992, Batching and scheduling jobs on batch and discrete processors, Operations Research, 39, 750, 10.1287/opre.40.4.750

Albers, 1993, The complexity of one-machine batching problems, Discrete Applied Mathematics, 47, 87, 10.1016/0166-218X(93)90085-3

Coffman, 1990, Batch sizing and job sequencing on a single machine, Annals of Operations Research, 26, 135, 10.1007/BF02248589

Santos, 1985, Batching in single operation manufacturing systems, Operations Research Letters, 4, 99, 10.1016/0167-6377(85)90011-2

Cheng, 1998, Batching and scheduling to minimize the makespan in the two-machine flowshop, IIE Transactions, 30, 447, 10.1080/07408179808966485

Cheng, 2001, Makespan minimization in the two-machine flowshop batch scheduling problem, Naval Research Logistics, 47, 128, 10.1002/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO;2-#

Glass, 2001, Scheduling batches with sequential job processing for two-machine flow and open shops, INFORMS Journal on Computing, 13, 120, 10.1287/ijoc.13.2.120.10521

Kovalyov, 2004, Batching decisions for assembly production systems, European Journal of Operational Research, 157, 620, 10.1016/S0377-2217(03)00250-9

Lawler, 1993, Sequencing and scheduling: algorithms and complexity, 445, 10.1016/S0927-0507(05)80189-6

Garey, 1979

Li, 2004, Lot streaming with supplier-manufacturer coordination, Naval Research Logistics, 51, 467, 10.1002/nav.20013