Scheduling in an assembly-type production chain with batch transfer
Tóm tắt
Từ khóa
Tài liệu tham khảo
Johnson, 1954, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, 1, 61, 10.1002/nav.3800010110
Pinedo, 2001
Reisman, 1997, Flowshop scheduling/sequencing research: a statistical review of the literature, 1952–1994, IEEE Transactions on Engineering Management, 44, 316, 10.1109/17.618173
Lee, 1993, Minimizing makespan in the 3-machine assembly-type flowshop scheduling problem, Management Science, 39, 616, 10.1287/mnsc.39.5.616
Garey, 1976, The complexity of flowshop and job shop scheduling, Mathematics of Operations Research, 1, 117, 10.1287/moor.1.2.117
Bhatnagar, 1993, Models for multi-plant coordination, European Journal of Operational Research, 67, 141, 10.1016/0377-2217(93)90058-U
Sun, 2003, Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling, European Journal of Operational Research, 146, 498, 10.1016/S0377-2217(02)00245-X
Potts, 1992, Integrating scheduling with batching and lot-sizing a review of algorithms and complexity, Journal of the Operational Research Society, 43, 95, 10.1057/jors.1992.66
Webster, 1995, Scheduling groups of jobs on a single machine, Operations Research, 43, 692, 10.1287/opre.43.4.692
Allahverdi, 1999, A review of scheduling research involving setup considerations, Omega, 27, 219, 10.1016/S0305-0483(98)00042-5
Cheng, 2000, A review of flowshop scheduling research with setup times, Production and Operations Management, 9, 262, 10.1111/j.1937-5956.2000.tb00137.x
Potts, 2000, Scheduling with batching: a review, European Journal of Operational Research, 102, 228, 10.1016/S0377-2217(99)00153-8
Lee, 1992, Efficient algorithms for scheduling semiconductor burn-in operations, Operations Research, 40, 764, 10.1287/opre.40.4.764
Ahmadi, 1992, Batching and scheduling jobs on batch and discrete processors, Operations Research, 39, 750, 10.1287/opre.40.4.750
Albers, 1993, The complexity of one-machine batching problems, Discrete Applied Mathematics, 47, 87, 10.1016/0166-218X(93)90085-3
Coffman, 1990, Batch sizing and job sequencing on a single machine, Annals of Operations Research, 26, 135, 10.1007/BF02248589
Santos, 1985, Batching in single operation manufacturing systems, Operations Research Letters, 4, 99, 10.1016/0167-6377(85)90011-2
Cheng, 1998, Batching and scheduling to minimize the makespan in the two-machine flowshop, IIE Transactions, 30, 447, 10.1080/07408179808966485
Cheng, 2001, Makespan minimization in the two-machine flowshop batch scheduling problem, Naval Research Logistics, 47, 128, 10.1002/(SICI)1520-6750(200003)47:2<128::AID-NAV4>3.0.CO;2-#
Glass, 2001, Scheduling batches with sequential job processing for two-machine flow and open shops, INFORMS Journal on Computing, 13, 120, 10.1287/ijoc.13.2.120.10521
Kovalyov, 2004, Batching decisions for assembly production systems, European Journal of Operational Research, 157, 620, 10.1016/S0377-2217(03)00250-9
Lawler, 1993, Sequencing and scheduling: algorithms and complexity, 445, 10.1016/S0927-0507(05)80189-6
Garey, 1979