Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects
Tóm tắt
Từ khóa
Tài liệu tham khảo
Badri, 2012, Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation, Accident Analysis and Prevention, 48, 223, 10.1016/j.aap.2011.05.009
Chalos, 1992
Everett, 1996, Costs of accidents and injuries due to the construction industry, Journal of Construction Engineering and Management — ASCE, 122, 158, 10.1061/(ASCE)0733-9364(1996)122:2(158)
Freivalds, 1987, Comparison of United-States (NIOSH Lifting Guidelines) and European (ECSC Force Limits) recommendations for manual work limits, American Industrial Hygiene Association Journal, 48, 698, 10.1080/15298668791385444
Fung, 2010, Developing a risk assessment model for construction safety, International Journal of Project Management, 28, 593, 10.1016/j.ijproman.2009.09.006
Gürcanli, 2009, An occupational safety risk analysis method at construction sites using fuzzy sets, International Journal of Industrial Ergonomics, 39, 371, 10.1016/j.ergon.2008.10.006
Hallowell, 2008
Hallowell, 2009, Construction safety risk mitigation, Journal of Construction Engineering and Management — ASCE, 135, 1316, 10.1061/(ASCE)CO.1943-7862.0000107
Henderson, 1992, Use of the analytic hierarchy process in ergonomic analysis, International Journal of Industrial Ergonomics, 9, 275, 10.1016/0169-8141(92)90061-4
Howard, 1981, Influence diagrams, 719
Kim, 2010, Influence factor-based safety risk assessment methodology for construction site, 1356
Krallis
Manuele, 2002, On acceptable risk, Occupational Hazards, 1, 57
Mitropoulos, 2011, New method for measuring the safety risk of construction activities: Task demand assessment, Journal of Construction Engineering and Management — ASCE, 137, 30, 10.1061/(ASCE)CO.1943-7862.0000246
Norris, 1992
OHSAS Project Group, 2007, OHSAS 18001: 2007
Padma, 2009, Knowledge based decision support system to assist work-related risk analysis in musculoskeletal disorder, Knowledge-Based Systems, 22, 72, 10.1016/j.knosys.2008.07.001
Pinto, 2010, Qualitative model for risk assessment in construction industry: A fuzzy logic approach, Emerging Trends in Technological Innovation, 314, 105, 10.1007/978-3-642-11628-5_11
Pinto, 2011, Occupational risk assessment in construction industry — Overview and reflection, Safety Science, 49, 616, 10.1016/j.ssci.2011.01.003
PMBoK, 2004, A guide to the project management body of knowledge
Saaty, 1990, How to make a decision — The analytic hierarchy process, European Journal of Operational Research, 48, 9, 10.1016/0377-2217(90)90057-I
Von Winterfeldt, 1986, 1
Woodruff, 2005, Consequence and likelihood in risk estimation: A matter of balance in UK health and safety risk assessment practice, Safety Science, 43, 345, 10.1016/j.ssci.2005.07.003
Zhang, 2009, Vol. 1, 134