Robust Coordinated Transmission and Generation Expansion Planning Considering Ramping Requirements and Construction Periods

IEEE Transactions on Power Systems - Tập 33 Số 1 - Trang 268-280 - 2018
Zuyi Li1, Feng Liu1, Shubo Zhang2, Xuemin Zhang1, Shengwei Mei1, Naichao Chang3
1Department of Electrical Engineering, Tsinghua University, Beijing, China
2Cleveland State University, Cleveland, OH USA
3National Control Center, State Grids Corporation of China, Beijing, China

Tóm tắt

Từ khóa


Tài liệu tham khảo

10.1109/TPWRS.2011.2169817

0

10.1109/TPWRS.2003.814891

10.1109/TPAS.1970.292825

0

0

2013, Estimating the value of lost load, 3

10.1109/TSTE.2015.2413778

10.1109/TPWRS.2008.919248

roh, 2009, Market-based generation and transmission planning with uncertainties, IEEE Trans Power Syst, 24, 1587, 10.1109/TPWRS.2009.2022982

10.1109/TPWRS.2012.2204073

10.1109/APPEEC.2011.5749120

10.1049/iet-gtd.2014.0278

10.1109/TPWRS.2015.2464274

10.1109/TPWRS.2012.2192507

10.1109/TPWRS.2009.2021230

10.1109/TPWRS.2011.2177280

10.1155/2012/527258

10.1007/s10107-003-0454-y

10.1109/TPWRS.2013.2267058

10.1109/TPWRS.2011.2126291

10.1109/TPWRS.2010.2048930

10.1049/iet-gtd.2013.0427

10.1007/BF01580892

10.1049/iet-gtd.2012.0137

10.17775/CSEEJPES.2015.00010

10.1109/TPWRS.2014.2313841

10.1109/TPWRS.2007.907139

10.1109/TPWRS.2007.901741

10.2202/1446-9022.1284

10.1109/TPWRS.2010.2094211

10.1109/TPWRS.2014.2326557

10.1109/TPWRS.2014.2363364

10.1109/TPWRS.2015.2493162

10.1016/j.orl.2013.05.003

10.1049/ip-gtd:20020075

10.1109/TPWRS.2012.2205021