Adebayo, 2008, An evaluation of the causes of oil pipeline incidents in oil and gas industries in Niger Delta region of Nigeria, Journal of Engineering Applied Science, 3, 279
Agarwal, 2004, Uncertainty quantification using evidence theory in multidisciplinary design optimization, Reliability Engineering and System Safety, 85, 281, 10.1016/j.ress.2004.03.017
American Institute of Chemical Engineers (AIChE), 2000
Arnaldos, 1998, Design of a computer tool for the evaluation of the consequences of accidental natural gas releases in distribution pipes, Journal of Loss Prevention in the Process Industries, 11, 135, 10.1016/S0950-4230(97)00041-7
Ayyub, 1991, Systems framework for fuzzy sets in civil engineering, International Journal of Fuzzy Sets and Systems, 40, 491, 10.1016/0165-0114(91)90174-O
Ayyub, 2006
Bae, 2004, An approximation approach for uncertainty quantification using evidence theory, Reliability Engineering and System Safety, 86, 215, 10.1016/j.ress.2004.01.011
Bilo, 1997, Thermal radiation criteria used in pipeline risk assessment, Pipes & Pipelines International, 17
Brito, 2009, Multi-attribute risk assessment for risk ranking of natural gas pipelines, Reliability Engineering and System Safety, 94, 187, 10.1016/j.ress.2008.02.014
Brito, 2010, A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating Utility Theory, European Journal of Operational Research, 200, 212, 10.1016/j.ejor.2009.01.016
Cagno, 2000, Using AHP in determining the prior distributions on gas pipeline failures in a robust Bayesian approach, Reliability Engineering and System Safety, 67, 275, 10.1016/S0951-8320(99)00070-8
Cheng, 2000, Uncertainties in fault tree analysis, Tamkang Journal of Science and Engineering, 3, 23
Chevreau, 2006, Organizing learning processes on risks by using the bow-tie representation, Journal of Hazardous Materials, 130, 276, 10.1016/j.jhazmat.2005.07.018
Chowdhury, 2007, Fuzzy risk-based decision-making approach for selection of drinking water disinfectants, Journal of Water Supply: Research and Technology-AQUA, 56, 75, 10.2166/aqua.2007.090
CMPT, 1999
Cockshott, 2005, Probability bow-ties: a transparent risk management tool, Process Safety and Environmental Protection, 83, 307, 10.1205/psep.04380
Contini, 2000
Dawotola, 2009, Risk assessment of petroleum pipelines using a combined analytical hierarchy process - fault tree analysis (AHP-FTA), 491
Dianous, 2006, ARAMIS project: a more explicit demonstration of risk control through the use of bow–tie diagrams and the evaluation of safety barrier performance, Journal of Hazardous Materials, 130, 220, 10.1016/j.jhazmat.2005.07.010
Dziubnski, 2006, Aspects of risk analysis associated with major failures of fuel pipelines, Journal of Loss Prevent in Process Industries, 19, 399, 10.1016/j.jlp.2005.10.007
Duijm, 2009, Safety-barrier diagrams as a safety management tool, Reliability Engineering and System Safety, 94, 332, 10.1016/j.ress.2008.03.031
EPA, 2001, Vol. 3
Ferdous, 2009, Handling data uncertainties in event tree analysis, Process Safety and Environment Protection, 87, 283, 10.1016/j.psep.2009.07.003
Ferdous, 2011, Fault and event tree analyses for process systems risk analysis: uncertainty handling formulations, Journal of Risk Analysis, 31, 86, 10.1111/j.1539-6924.2010.01475.x
Ferson, 2004
Frank, 1979, On the simultaneous associativity of and F(x, y) and x + y- F(x, y), Aequationes Mathematicae, 19, 194, 10.1007/BF02189866
Frey, 2002, Identification and review of sensitivity analysis methods, An International Journal of Risk Analysis, 22, 553, 10.1111/0272-4332.00039
Hopkins, 2002, Vol. 1
Huang, 2001, A fuzzy set approach for event tree analysis, Fuzzy Sets and Systems, 118, 153, 10.1016/S0165-0114(98)00288-7
Jo, 2002, Analysis of hazard areas associated with high-pressure natural-gas pipelines, Journal of Loss Prevention in the Process Industries, 15, 179, 10.1016/S0950-4230(02)00007-4
Kaplan, 1981, On the quantitative definition of risk, Risk Analysis, 1, 11, 10.1111/j.1539-6924.1981.tb01350.x
Khan, 2005, Risk-based prioritization of air pollution monitoring using fuzzy synthetic evaluation technique, Environmental Monitoring and Assessment, 105, 261, 10.1007/s10661-005-3852-1
Khan, 2001, Risk analysis of a typical chemical industry using ORA procedure, Journal of Loss Prevention in the Process Industries, 14, 43, 10.1016/S0950-4230(00)00006-1
Kenarangui, 1991, Event-tree analysis by fuzzy probability, IEEE Transactions on Reliability, 40, 12, 10.1109/24.75348
Klir, 2001
Lee, 1996, Applying fuzzy set theory to evaluate the rate of aggregative risk in software development, Fuzzy Sets and Systems, 79, 323, 10.1016/0165-0114(95)00163-8
McCauley-Bell, 1996, Fuzzy modeling and analytic hierarchy processing to quantify risk levels associated with occupational injuries–Part I: the development of fuzzy linguistic risk levels, IEEE Transactions on Fuzzy Systems, 4, 124, 10.1109/91.493906
Markowski, 2009, Fuzzy logic for process safety analysis, Journal of Loss Prevention in the Process Industries, 22, 695, 10.1016/j.jlp.2008.11.011
Mamdani, 1997, Application of fuzzy logic to approximate reasoning using linguistic synthesis, IEEE Transactions on Computers, C-26, 1182, 10.1109/TC.1977.1674779
Papadakis, 2000, Assessment of requirements on safety management systems in EU regulations for the control of major hazard pipelines, Journal of Hazardous Materials, 78, 63, 10.1016/S0304-3894(00)00217-X
Rivera, 1999, Using fuzzy arithmetic in containment event trees, 22
Saaty, 1980
Sadiq, R. (2001). Drilling waste discharges in the marine environment: A risk based decision methodology. PhD. Thesis, Memorial University of Newfoundland, Canada, 333 pp.
Sadiq, 2004, Risk-based decision-making for drilling waste discharges using a fuzzy synthetic evaluation technique, Ocean Engineering, 31, 1929, 10.1016/j.oceaneng.2004.05.001
Sadiq, 2004, Aggregative risk analysis for water quality failure in distribution network, Journal of Water Supply, 4, 243
Sadiq, 2008, Predicting risk of water quality failures in distribution networks under uncertainties using fault-tree analysis, Urban Water Journal, 5, 287, 10.1080/15730620802213504
Sawyer, 1994, Fault tree analysis of Fuzzy Mechanical system, Microelectronics and Reliability, 34, 653, 10.1016/0026-2714(94)90030-2
Sentz, 2002
Simonoff, 2010, Risk management of cost consequences in natural gas transmission and distribution infrastructures, Journal of Loss Prevention in the Process Industries, 23, 269, 10.1016/j.jlp.2009.10.005
Sklavounos, 2006, Estimation of safety distances in the vicinity of fuel gas pipelines, Journal of Loss Prevention in the Process Industries, 19, 24, 10.1016/j.jlp.2005.05.002
Suresh, 1996, Uncertainty in fault tree analysis: a fuzzy approach, Fuzzy Sets and Systems, 83, 135, 10.1016/0165-0114(95)00386-X
Tesfamariam, 2008, Risk-based seismic evaluation of reinforced concrete buildings, Earthquake Spectra, 24, 795, 10.1193/1.2952767
Wagholiar, 2007
Wilcox, 2003, Uncertainty modeling of data and uncertainty propagation for risk studies, IEEE Proceedings on Uncertainty Modeling and Analysis, 184
Yuhua, 2005, Estimation of failure probability of oil and gas transmission pipelines by fuzzy fault tree analysis, Journal of Loss Prevention in the Process Industries, 18, 83, 10.1016/j.jlp.2004.12.003