Research on project selection system of pre-evaluation of engineering design project bidding

International Journal of Project Management - Tập 27 - Trang 584-599 - 2009
Jin Wang1, Yujie Xu1, Zhun Li1
1The School of Civil Engineering and Architecture, Central South University, Changsha, Hunan 410004, China

Tài liệu tham khảo

Hall, 1990, An interactive approach for selecting IR&D projects, IEEE Trans Eng Manage, 37, 126, 10.1109/17.53715 Martino, 1995 Bard, 1988, An interactive approach to R&D project selection and termination, IEEE Trans Eng Manage, 35, 139, 10.1109/17.7433 Machacha, 2000, A fuzzy-logic-based approach to project selection, IEEE Trans Eng Manage, 47, 65, 10.1109/17.820726 Jiang, 1999, Information system project-selection criteria variations within strategic classes, IEEE Trans Eng Manage, 46, 171, 10.1109/17.759145 Lund, 1989 King, 1987, Note on a conflict of assumptions in bidding models, Eur J Oper Res, 32, 462, 10.1016/S0377-2217(87)80013-9 Slade, 1991, Case-based reasoning, AI Mag, 12, 42 Skitmore, 1994, A multivariate approach to construction contract bidding mark-up strategies, J Oper Res Soc, 45, 1263, 10.1057/jors.1994.199 Rothkopf, 1993, Misapplications reviews getting model right—the case of competitive bidding, Interfaces, 23, 99, 10.1287/inte.23.3.99 Molenaar, 1998, Model for public sector design-build project selection, J Constr Eng Manage, 124, 467, 10.1061/(ASCE)0733-9364(1998)124:6(467) Alvey, 1998, A security-constrained bid-clearing system for the New Zealand wholesale electricity market, IEEE Trans Power Syst, 13, 340, 10.1109/59.667349 Tam, 1999, Build-operate-transfer model for infrastructure developments in Asia: reasons for successes and failures, Int J Project Manage, 17, 377, 10.1016/S0263-7863(98)00061-1 Liu, 1999, Research on project selection of enterprise product development, Ind Technol Econ, 18, 63 Dey, 2006, Integrated project evaluation and selection using multiple-attribute decision-making technique, Int J Prod Econ, 103, 90, 10.1016/j.ijpe.2004.11.018 Cheng, 2005, Analytic network process applied to project selection, J Constr Eng Manage, 131, 459, 10.1061/(ASCE)0733-9364(2005)131:4(459) Shank, 1992, Strategic cost management and the value chain, J Cost Manage, 5, 5 Hamel, 1993, Strategy as stretch and leverage, Harvard Bus Rev, 71, 75 Atkinson, 1997, A stakeholder approach to strategic performance measurement, Sloan Manage Rev, 38, 25 Cooper, 2000, Product innovation and technology strategy, Res Technol Manage, 43, 38, 10.1080/08956308.2000.11671329 Johansen, 1999, Testing exact rational expectations in cointegrated vector autoregressive models, J Econom, 93, 73, 10.1016/S0304-4076(99)00004-4 Jensen, 2002, Value maximization, stakeholder theory, and the corporate objective function, Bus Ethics Quart, 12, 235, 10.2307/3857812 Westerveld, 2003, The project excellence model: linking success criteria and success factors, Int J Project Manage, 21, 411, 10.1016/S0263-7863(02)00112-6 Han, 2001, Approaches for making risk-based go/no-go decision for international projects, J Constr Eng Manage, 127, 300, 10.1061/(ASCE)0733-9364(2001)127:4(300) Badri, 2001, A comprehensive 0–1 goal programming model for project selection, Int J Project Manage, 19, 243, 10.1016/S0263-7863(99)00078-2 Weingartner, 1963 Weingartner, 1966, Capital budgeting of interrelated projects: survey and synthesis, Manage Sci, 12, 485, 10.1287/mnsc.12.7.485 Weingartner, 1966, Criteria for programming investment project selection, J Ind Econ, 11, 65, 10.2307/2097850 Okpala, 1991, Evaluation and selection of construction projects in Nigeria, Constr Manage Econ, 9, 51, 10.1080/01446199100000005 Odusote, 1992, An examination of the importance of resource considerations when contractors make project selection decisions, Constr Manage Econ, 10, 137, 10.1080/01446199200000013 Mohanty, 1992, Project selection by a multiple-criteria decision-making method: An example from a developing country, Int J Project Manage, 10, 31, 10.1016/0263-7863(92)90070-P Alidi, 1996, Use of the analytic hierarchy process to measure the initial viability of industrial projects, Int J Project Manage, 14, 205, 10.1016/0263-7863(95)00076-3 Moselhi, 1993, Project selection considering risk, Constr Manage Econ, 11, 45, 10.1080/01446199300000063 Gori, 1996, Portfolio selection of capital investment projects in the Durban Metropolitan Region, Constr Manage Econ, 14, 451, 10.1080/014461996373313 Dozzi, 1996, Utility-theory model for bid markup decisions, J Constr Eng Manage, 122, 119, 10.1061/(ASCE)0733-9364(1996)122:2(119) Wang, 1997, A fuzzy outranking method for conceptual design evaluation, Int J Prod Res, 35, 995, 10.1080/002075497195506 Fayek, 1998, Competitive bidding strategy model and software system for bid preparation, J Constr Eng Manage, 124, 148 Moon, 1999, Use of fuzzy set theory in the aggregation of expert judgments, Ann Nucl Energy, 26, 461, 10.1016/S0306-4549(98)00073-5 Gungor, 2000, A fuzzy outranking method in energy policy planning, Fuzzy Set Syst, 114, 115, 10.1016/S0165-0114(98)00144-4 Degraeve, 2000, An evaluation of vendor selection models from a total cost of ownership perspective, Eur J Oper Res, 125, 34, 10.1016/S0377-2217(99)00199-X Chua, 2000, Key factors in bid reasoning model, J Constr Eng Manage, 126, 349, 10.1061/(ASCE)0733-9364(2000)126:5(349) Chua, 2000, Case-based reasoning approach in bid decision making, J Constr Eng Manage, 127, 35, 10.1061/(ASCE)0733-9364(2001)127:1(35) Wong, 2000, A fuzzy stochastic technique for project selection, Constr Manage Econ, 18, 407, 10.1080/01446190050024824 Skitmore, 2001, Bid-spread, J Constr Eng Manage, 127, 149, 10.1061/(ASCE)0733-9364(2001)127:2(149) Mohamed, 2001, Modeling project investment decisions under uncertainty using possibility theory, Int J Project Manage, 19, 231, 10.1016/S0263-7863(99)00077-0 Lee, 2001, An integrated approach for interdependent information system project selection, Int J Project Manage, 19, 111, 10.1016/S0263-7863(99)00053-8 Pillai, 2002, Performance measurement of R&D projects in a multi-project, concurrent engineering environment, Int J Project Manage, 20, 165, 10.1016/S0263-7863(00)00056-9 Meade, 2002, R&D project selection using the analytic network process, IEEE Trans Eng Manage, 49, 59, 10.1109/17.985748 Büyüközkan, 2004, A fuzzy-logic-based decision-making approach for new product development, Int J Prod Econ, 90, 27, 10.1016/S0925-5273(02)00330-4 Sun, 2005, A packing multiple-boxes model for R&D project selection and scheduling, Technovation, 25, 1355, 10.1016/j.technovation.2004.07.010 Carlsson, 2007, A fuzzy approach to R&D project portfolio selection, Int J Approx Reason, 44, 93, 10.1016/j.ijar.2006.07.003 Huang, 2007, Optimal project selection with random fuzzy parameters, Int J Prod Econ, 106, 513, 10.1016/j.ijpe.2006.06.011 Cascio, 1995 Deng, 1989, Introduction to Grey system theory, J Grey Syst, 1, 1 Deng, 2002 Luo, 2002, The gray target method for risk evaluation of tubing in natural gas well, Mater Corros, 53, 274, 10.1002/1521-4176(200204)53:4<274::AID-MACO274>3.0.CO;2-K Feng, 2006, Grey target model appraising firm’s financial status based on altman coefficients, J Grey Syst, 2, 133 Li, 2004, Application of grey target theory to foreign market entry mode selection, J Grey Syst, 4, 397 Dou, 2004, Assessing multi-goal coupon promotion performance by grey target theory, J Grey Syst, 4, 401