Reliability and delay analysis of multicast in binary molecular communication

Nano Communication Networks - Tập 9 - Trang 17-27 - 2016
Zhen Cheng1, Yihua Zhu1, Kaikai Chi1, Yanjun Li1
1School of Computer Science and Technology, Zhejiang University of Technology, Hangzhou 310023, China

Tài liệu tham khảo

Akyildiz, 2011, Nanonetworks: a new frontier in communications, Commun. ACM, 54, 84, 10.1145/2018396.2018417 Farokhzad, 2009, Impact of nanotechnology on drug delivery, ACS Nano, 3, 16, 10.1021/nn900002m Wood, 2006, Integrated circuit built on single nanotube: nanotechnology, Mater. Today, 9, 10.1016/S1369-7021(06)71478-X Akyildiz, 2008, Nanonetworks: a new communication paradigm, Comput. Netw., 52, 2260, 10.1016/j.comnet.2008.04.001 Nakano, 2013 Allen, 2004, Drug delivery systems: entering the mainstream, Science, 303, 1818, 10.1126/science.1095833 Yoo, 2011, Bio-inspired, bioengineered and biomimetic drug delivery carriers, Nat. Rev. Drug. Discov., 10, 521, 10.1038/nrd3499 P. Bogdan, G. Wei, R. Marculescu, Modeling populations of microrobots for biological applications, in: IEEE International Conference on Communications, 2012. Atakan, 2012, Body area nanonetworks with molecular communications in nanomedicine, IEEE Commun. Mag., 50, 28, 10.1109/MCOM.2012.6122529 C. Teuscher, C. Grecu, T. Lu, R. Weiss, Challenges and promises of nano and bio communication networks, in: 5th ACM/IEEE International Symposium on Networks on Chip, 2011. Nakano, 2012, Molecular communication and networking: opportunities and challenges, IEEE Trans. NanoBiosci., 11, 135, 10.1109/TNB.2012.2191570 Llatser, 2012, Networking challenges and principles in diffusion-based molecular communication, IEEE Wirel. Commun., 19, 36, 10.1109/MWC.2012.6339470 Kuran, 2012, Calcium signaling: overview and research directions of a molecular communication paradigm, IEEE Wirel. Commun., 19, 20, 10.1109/MWC.2012.6339468 Yeh, 2012, A new frontier of wireless communication theory: diffusion-based molecular communications, IEEE Wirel. Commun., 19, 28, 10.1109/MWC.2012.6339469 Guney, 2012, Mobile Ad hoc nanonetworks with collision-based molecular communication, IEEE Trans. Mob. Comput., 11, 353, 10.1109/TMC.2011.53 Unluturk, 2013, Rate-delay tradeoff with network coding in molecular nanonetworks, IEEE Trans. Nanotechnol., 12, 120, 10.1109/TNANO.2013.2241449 Nakano, 2013, Transmission rate control for molecular communication among biological nanomachines, IEEE J. Sel. Areas Commun., 31, 835, 10.1109/JSAC.2013.SUP2.12130016 M.J. Moore, A. Enomoto, T. Suda, A. Kayasuga, K. Oiwa, Molecular communication: uni-cast communication on a microtubule topology, in: IEEE International Conference on Systems, Man and Cybernetics, 2008. Balasubramaniam, 2013, Multi-Hop conjugation based bacteria nanonetworks, IEEE Trans. NanoBiosci., 12, 47, 10.1109/TNB.2013.2239657 Walsh, 2013, Reliability and delay analysis of multihop virus-based nanonetworks, IEEE Trans. Nanotechnol., 12, 674, 10.1109/TNANO.2013.2268389 Mahfuz, 2010, On the characterization of binary concentration-encoded molecular communication in nanonetworks, Nano Commun. Netw. J., 1, 289, 10.1016/j.nancom.2011.01.001 M. Kuran, H. Yilmaz, T. Tugcu, I.F. Akyildiz, Modulation techniques for communication via diffusion in nanonetworks, in: Proc. IEEE ICC, June 2011, pp. 1–5. Nakano, 2012, Channel model and capacity analysis of molecular communication with Brownian motion, IEEE Commun. Lett., 16, 797, 10.1109/LCOMM.2012.042312.120359 Atakan, 2013, Optimal transmission probability in binary molecular communication, IEEE Commun. Lett., 17, 1152, 10.1109/LCOMM.2013.041813.130255 M. Ling-San, Y. Ping-Cheng, C. Kwang-Cheng, I.F. Akyildiz, A diffusion-based binary digital communication system, in: Proc. Int. Conf. Communications, Ottawa, Canada, 2012. Nakano, 2010, Design and analysis of molecular relay channels: an information theoretic approach, IEEE Trans. NanoBiosci., 9, 213, 10.1109/TNB.2010.2050070