Quantification of risk and assessment of key safety factors for safe workplace in Indian building construction sites

S. Ajith1, S. Chandrasekaran1, V. Arumugaprabu2
1Department of Civil Engineering, Kalasalingam Academy of Research and Education, Krishnankoil, India
2Department of Mechanical Engineering, Kalasalingam Academy of Research and Education, Krishnankoil, India

Tóm tắt

Từ khóa


Tài liệu tham khảo

Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599.

Al-Anbari, S., Khalina, A., Alnuaimi, A., Normariah, A., & Yahya, A. (2015). Risk assessment of safety and health (RASH) for building construction. Process Safety and Environmental Protection, 94, 149–158.

Aminbakhsh, S., Gunduz, M., & Sonmez, R. (2013). Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. Journal of safety research, 46, 99–105.

Carter, G., & Smith, S. D. (2006). Safety hazard identification on construction projects. Journal of construction engineering and management, 132(2), 197–205.

Chi, C. F., Yang, C. C., & Chen, Z. L. (2009). In-depth accident analysis of electrical fatalities in the construction industry. International Journal of Industrial Ergonomics, 39(4), 635–644.

Code of practice on Workplace Safety and Health (WSH) Risk Management. (2011). WSH council, Singapore

El, M. S. B. A. A., El Nawawy, O. A. M., & Abdel-Alim, A. M. (2017). Identification and assessment of risk factors affecting construction projects. HBRC Journal, 13(2), 202–216.

El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management, 26(4), 431–438.

Fung, I. W., Tam, V. W., Lo, T. Y., & Lu, L. L. (2010). Developing a risk assessment model for construction safety. International Journal of Project Management, 28(6), 593–600.

Gunduz, M., Birgonul, M. T., & Ozdemir, M. (2018). Development of a safety performance index assessment tool by using a fuzzy structural equation model for construction sites. Automation in Construction, 85(124–134), 3.

Gündüz, M., Nielsen, Y., & Özdemir, M. (2012). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133–139.

Husin, S. N. H., Mohamad, A. B., Abdullah, S. R. S., & Anuar, N. (2012). Chemical health risk assessment at the chemical and biochemical engineering laboratory. Procedia-Social and Behavioral Sciences, 60, 300–307.

Islam, M. S., & Suhariadi, B. T. (2018). Construction delays in privately funded large building projects in Bangladesh. Asian Journal of Civil Engineering, 19(4), 1–15.

Jannadi, O. A., & Almishari, S. (2003). Risk assessment in construction. Journal of construction Engineering and Management, 129(5), 492–500.

Karimi Azari, A., Mousavi, N., Mousavi, S. F., & Hosseini, S. (2011). Risk assessment model selection in construction industry. Expert Systems with Applications, 38(8), 9105–9111.

Kraus, M. (2018). Risk assessments of contemporary accidents in construction industry. In MATEC web of conferences (Vol. 146, p. 03004). EDP Sciences.

Liu, H. T., & Tsai, Y. L. (2012). A fuzzy risk assessment approach for occupational hazards in the construction industry. Safety Science, 50(4), 1067–1078.

Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 20(1), 67–73.

Rozenfeld, O., Sacks, R., Rosenfeld, Y., & Baum, H. (2010). Construction job safety analysis. Safety Science, 48(4), 491–498.

Saedi, A. M., Thambirajah, J. J., & Pariatamby, A. (2014). A HIRARC model for safety and risk evaluation at a hydroelectric power generation plant. Safety Science, 70, 308–315.

Shanmugapriya, S., & Subramanian, K. (2015). Ranking of key quality factors in the Indian construction industry. International Research Journal of Engineering and Technology, 2(7), 907–913.

Timofeeva, S. S., Ulrikh, D. V., & Tsvetkun, N. V. (2017). Professional Risks in Construction Industry. Procedia Engineering, 206, 911–917.

Wang, Z. Z., & Chen, C. (2017). Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects. Tunnelling and Underground Space Technology, 70, 330–342.

Yilmaz, F. (2014). Analysis of occupational accidents in construction sector in Turkey. Analysis, 1(5), 421–428.

Yiu, N. S., Sze, N. N., & Chan, D. W. (2018). Implementation of safety management systems in Hong Kong construction industry–a safety practitioner’s perspective. Journal of safety research, 64, 1–9.