Production and Inventory Model Using Net Present Value

Operations Research - Tập 50 Số 3 - Trang 528-537 - 2002
Daning Sun1, Maurice Queyranne2
1Department of Information Systems, Lingnan University, Tuen Mun, Hong Kong, and Faculty of Commerce, University of British Columbia, Vancouver, British Columbia, Canada V6T 1Z2
2Faculty of Commerce, University of British Columbia, Vancouver, British Columbia, Canada V6T 1Z2

Tóm tắt

Using the net present value is the standard methodology in theoretical analysis, and the most frequently used method for making financial decisions. However, net present value is rarely used in production and inventory decisions. The main reasons appear to be the complexity of the formulae and the robustness of the EOQ model. We investigate the general multiproduct, multistage production and inventory model using the net present value of its total cost as the objective function. A power-of-two heuristic gives us a near optimal solution to this problem. If the base period is fixed (or varied), the solution based on the best power-of-two heuristic will be within 6.2% (or 2.1% ) of the optimal. This result is surprisingly similar to models using the long-term average cost. The average cost does not reflect the time value of money. Does this mean that decisions based on average cost are significantly inferior to those based on net present value? The answer is quite surprising. If we include discounted production cost in the holding cost, it turns out that the decision based on average cost is only 9.6% (in terms of the net present value of the total cost) worse than the decision based on the net present value. However, the reorder interval based on the average cost could be much longer than that derived using net present value. This result shows that average cost is a good approximation to the net present value when the demands are deterministic.

Từ khóa


Tài liệu tham khảo

Atkins D., 1987, Oper. Res. Lett., 6

10.1287/opre.40.1.126

10.1287/opre.43.2.335

Bensoussan A., 1983, Mathematics Theory of Production and Inventory Planning

10.1016/0377-2217(92)90200-S

10.1287/mnsc.31.4.499

Federgruen A., Zheng Y. S. Minimizing submodular set functions: Efficient algorithms for special structures with applications to joint replenishment problems. (1988) . Working paper, Columbia University, Graduate School of Business, New York

10.1287/moor.17.4.951

10.1137/1013001

10.1287/mnsc.10.3.472

Klammer T., 1991, J. Management Accounting Res., 113

10.1287/opre.35.3.399

10.1016/0167-6377(85)90004-5

Queyranne M. A polynomial-time submodular extension to Roundy's 98% effective heuristic for production/inventory systems. (1985) . Working paper no. 1136, Faculty of Commerce and Business Administration, University of British Columbia, Vancouver, BC, Canada

10.1002/1520-6750(198810)35:5<419::AID-NAV3220350506>3.0.CO;2-Y

10.1057/jors.1989.143

Rachamadugu R. Ordering policies under limited time price discounts. (1990) (School of Business Administration, University of Michigan, Ann Arbor, MI)

10.1515/9781400873173

10.1287/mnsc.31.11.1416

10.1287/moor.11.4.699

10.1287/opre.45.6.940