The reduced inertia levels in low-carbon power grids necessitate explicit constraints to limit frequency’s nadir and rate of change during scheduling. This can result in significant curtailment of renewable energy due to the minimum generation of thermal plants that are needed to provide frequency response (FR) and inertia. Additional consideration of fast FR, a dynamically reduced largest loss and under frequency load shedding (UFLS) allows frequency security to be achieved more cost effectively. This paper derives a novel constraint from the swing equation to contain the frequency nadir using all of these services. The expected cost of UFLS is found probabilistically to facilitate its comparison to the other frequency services. We demonstrate that this constraint can be accurately and conservatively approximated for moderate UFLS levels with a second order cone (SOC), resulting in highly tractable convex problems. Case studies performed on a Great Britain 2030 system demonstrate that UFLS as an option to contain single plant outages can reduce annual operational costs by up to $\pounds $559 m, 52% of frequency security costs. The sensitivity of this value to wind penetration, abundance of alternative frequency services, UFLS amount and cost is explored.
Từ khóa
#Inertia #frequency response #stochastic unit commitment #UFLS #wind energyTài liệu tham khảo
10.1109/TPWRS.2015.2434837
2019, National electricity transmission system security and quality of supply standard
10.1016/j.epsr.2019.106054
10.1049/iet-gtd:20080210
10.1109/TPWRS.2006.879315
10.1109/TPWRD.2015.2503734
10.1016/j.ijepes.2012.04.021
10.1109/ACCESS.2020.3042658
10.1109/TPWRS.2014.2297997
10.1109/TPWRS.2016.2521882
10.1109/TPWRS.2020.2987076
10.1109/TPWRS.2014.2298838
10.1109/TPWRS.2019.2905037
10.1109/TASE.2016.2629479
10.1109/TPWRS.2011.2164558
Kundur, 1994, Power System Stability and Control, 849
10.1109/TPWRS.2020.2997194
2017, Western Power Distribution, Low frequency demand disconnection, Western Power Distribution Plc
2013, The value of lost load (VoLL) for electricity in great britain: Final report for OFGEM and DECC, OFGEM DECC, 1
2018, Study on the estimation of the value of lost load of electricity supply in Europe, ACER