Proactivity-and-consequence-based safety incentive (PCBSI) developed with a fuzzy approach to reduce occupational accidents

Safety Science - Tập 79 - Trang 175-183 - 2015
Ada Saracino1, Matteo Curcuruto2, Giacomo Antonioni1, Marco Giovanni Mariani2, Dina Guglielmi3, Gigliola Spadoni1
1Department of Civil, Chemical, Environmental and Materials Engineering (DICAM), University of Bologna, via Terracini 28, 40131 Bologna, Italy
2Department of Psychology, University of Bologna, Viale Berti Pichat, 5, 40126 Bologna, Italy
3Department of Education Sciences, «Giovanni Maria Bertin», University of Bologna, Via FIlippo Re 6, 40126 Bologna, Italy

Tài liệu tham khảo

Balkin, 1992, Managing employee separations with the reward system, Executive, 64, 64, 10.5465/AME.1992.4274480 Barling, 2000, Commitment vs. control-oriented safety practices, safety reputation and perceived safety climate, Can. J. Admin. Sci., 17, 76, 10.1111/j.1936-4490.2000.tb00208.x Bowles, 1995, Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis, Reliab. Eng. Syst. Safety, 50, 203, 10.1016/0951-8320(95)00068-D Datta, 2012, An applied organizational rewards distribution system, Manage. Decis., 50, 479, 10.1108/00251741211216241 Deci, 2002 Duff, 1994, Improving safety by the modification of behaviour, Constr. Manage. Econ., 12, 78 Gentile, 2003, Development of a fuzzy logic-based inherent safety index, Process Saf. Environ. Prot., 81, 444, 10.1205/095758203770866610 Geymar, 1995, Fault tree: a knowledge – engineering approach, IEEE Trans. Reliab., 44, 37, 10.1109/24.376519 Griffin, 2000, Perceptions of safety at work: a framework for linking safety climate to safety performance, knowledge, and motivation, J. Occup. Health Psychol., 5, 347, 10.1037/1076-8998.5.3.347 Griffin, 2007, A new model of work role performance: positive behavior in uncertain and interdependent contexts, Acad. Manag. J., 50, 327, 10.5465/AMJ.2007.24634438 Griffin, 2014, A conceptual framework and practical guide for assessing fitness-to-operate in the offshore oil and gas industry, Accid. Anal. Prev., 68, 156, 10.1016/j.aap.2013.12.005 Grotte, 1996 Haines, 2001, Understanding reactions to safety incentives, J. Safety Res., 32, 17, 10.1016/S0022-4375(00)00051-7 Halloran, 1996, Incentives benefit safety programs, Occup. Health Saf., 65, 60 Hollnagel, 2006 Hollnagel, 2011 Karwowski, 1986, Potential application of fuzzy sets in industrial safety engineering, Fuzzy Sets Syst., 19, 105, 10.1016/0165-0114(86)90031-X Lawler, 2000 Mariani, 2011 Markowski, A.S., 2006. Layer of Protection Analysis for the Process Industry. Polish Academy of Science (PAN) Branch Lodz, ISBN 83-86-492-36-8. McAfee, 1989, The use of incentives/feedback to enhance work place safety: a critique of the literature, J. Safety Res., 20, 7, 10.1016/0022-4375(89)90003-0 Morrison, 1999, Taking charge at work: extra-role efforts to initiate workplace change, Acad. Manag. J., 42, 403, 10.2307/257011 Muré, 2009, Fuzzy Application Procedure (FAP) for the risk assessment of occupational accidents, J. Loss Prev. Process Ind., 22, 593, 10.1016/j.jlp.2009.05.007 OSHA Memorandum, 2012. Employer Safety Incentive and Disincentive Policies and Practices. Ostroff, 1992, The relationship between satisfaction, attitudes, and performance: an organizational level analysis, J. Appl. Psychol., 77, 963, 10.1037/0021-9010.77.6.963 Parker, 2010, Taking stock: integrating and differentiating multiple proactive behaviors, J. Manage., 36, 633 Piderit, 2000, Rethinking resistance and recognizing ambivalence: a multidimensional view of attitudes toward an organizational change, Acad. Manage. Rev., 25, 783, 10.5465/amr.2000.3707722 Probst, 2001, The effects of job insecurity on employee safety outcomes: cross-sectional and longitudinal explorations, J. Occup. Health Psychol., 6, 139, 10.1037/1076-8998.6.2.139 Reason, 1997 Robbins, 2005 Salzano, 2006, A fuzzy set analysis to estimate loss intensity following blast wave interaction with process equipment, J. Loss Prev. Process Ind., 19, 343, 10.1016/j.jlp.2005.08.002 Sugeno, 1985, An introductory survey of fuzzy control, Inf. Sci., 36, 59, 10.1016/0020-0255(85)90026-X Teo, 2005, Fostering safe work behaviour in workers at construction sites, Eng. Constr. Arch. Manage., 12, 410, 10.1108/09699980510608848 Weick, 2011 Zadeh, 1965, Fuzzy sets, Inf. Control, 8, 338, 10.1016/S0019-9958(65)90241-X Zadeh, 1975, The concept of a linguistic variable and its application to approximate reasoning-I, Inform. Sci., 8, 199, 10.1016/0020-0255(75)90036-5