Principles of the roof cut short-arm beam mining method (110 method) and its mining-induced stress distribution
Tóm tắt
Từ khóa
Tài liệu tham khảo
Qian, 1981, The equilibrium condition for overlying strata in the stope, J China Inst Min Technol, 2, 31
Qian, 1982, The structural model of overlying strata in the stope and its application, J China Inst Min Technol, 2, 1
Qian, 1982, The movement of overlying strata in longwall mining and its effect on ground pressure, J China Coal Soc, 2, 1
Song, 1979, Basic rules for stope overlying strata, J Shandong Inst Min Technol, 1, 12
Song, 1982, Rules for the stope bearing pressure and its application, J Shandong Inst Min Technol, 1, 1
Song, 1986, Basic research on the AND method of control – designing in face, J Shandong Inst Min Technol, 3, 1
He MC. Present situation and prospect of rock mechanics in deep mining engineering. In: Proceedings of the 8th conference of Chinese rock mechanics and engineering. Beijing; 2004. p. 88–94.
He, 2005, Conception system and evaluation indexes for deep engineering, Chin J Rock Mech Eng, 24, 2854
He, 2005, Study on rock mechanics in deep mining engineering, Chin J Rock Mech Eng, 24, 2803
Zhai, 1999, Research on the filling body for gob-side gateway and its interaction with roof strata, Coal Mine Des, 8, 6
Li, 2000, Roof strata control design for gob-side gateway, Chin J Rock Mech Eng, 19, 651
Liu, 2007, Existing problem on long wall remaining coal pillars support mining, J China Coal Soc, 32, 565
Fei, 2008, The status-quo of support technology on gob-side entry retaining laneway and existing problem discussion, China Sci Technol Inform, 3, 31
He, 2007, Stability control of surrounding rocks in deep entry of Jiahe coal mine, J Min Saf Eng, 24, 27
Zhang, 2011, Research on the technique of no-pillar mining with gob-side entry formed by advanced roof caving in the protective seam in Baijiao coal mine, J Min Saf Eng, 28, 511
Liu, 2013, Technology of roof cutting pressure relief gob-side entry retaining in soft fractured stratum, Coal Sci Technol, S2, 133, 10.1504/IJOGCT.2013.050780
Song, 2012, The application of pre-splitting roof cutting and pressure releasing technology at working face and gob-side gateway maintaining, Coal Sci Technol Mag, 3, 52
Wang, 2012, Discussion on gateway retained along goaf technology with roof breaking and pressure releasing, Coal Eng, 1, 24
Sun, 2014, Key parameters of gob-side entry retaining formed by roof cut and pressure releasing in thin coal seams, Chin J Rock Mech Eng, 33, 1449
He, 2014, Latest progress of soft rock mechanics and engineering in China, J Rock Mech Geotech Eng, 6, 165, 10.1016/j.jrmge.2014.04.005