Performance measurement in automated manufacturing
Tóm tắt
Từ khóa
Tài liệu tham khảo
Andersson, T.D. (1996), “Traditional key ratio analysis versus data envelopment analysis: a comparison of various measurements of productivity and efficiency in restaurants”, in Jones, N. (Ed.), Productivity Management in Hospitality and Tourism, Cassell, London, pp. 209‐26.
Berkeley, J.B. Jr (1985), “The need for hierarchical standards for automated integrated manufacturing”, in Gardiner, L.B. (Ed.), Automated Manufacturing, ASTM STP 862, American Society for Testing and Materials, Philadelphia, PA, pp. 81‐93.
Bititci, U.S. (1994), “Measuring your way to profit”, Management Decision, Vol. 32 No. 6, pp. 16‐24.
Braglia, M., Frosolini, M. and Zammori, F. (2009), “Overall equipment effectiveness of a manufacturing line (OEEML)”, Journal of Manufacturing Technology Management, Vol. 20 No. 1, pp. 8‐29.
Brudan, A. (2010), “Rediscovering performance management: systems, learning and integration”, Measuring Business Excellence, Vol. 14 No. 1, pp. 109‐23.
Carlucci, D. (2010), “Evaluating and selecting key performance indicators: an ANP‐based model”, Measuring Business Excellence, Vol. 14 No. 2, pp. 66‐76.
Chand, G. and Shirvani, B. (2000), “Implementation of TPM in cellular manufacture”, Journal of Materials Processing Technology, Vol. 103, pp. 144‐54.
Chennell, A.F., Dransfield, S.B., Field, J.B., Fisher, N.I., Saunders, I.W. and Shaw, D.E. (2000), “OPM®: a system for organisational performance measurement”, Performance Measurement – Past, Present and Future, University of Cambridge, Cambridge.
Cocca, P. and Alberti, M. (2010), “A framework to assess performance measurement systems in SMEs”, International Journal of Productivity and Performance Management, Vol. 59 No. 2, pp. 186‐200.
Dangayach, G.S. and Deshmukh, S.G. (2003), “Evidence of manufacturing strategies in Indian industry: a survey”, International Journal of Production Economics, Vol. 83 No. 3, pp. 279‐98.
de Ron, A.J. and Rooda, J.E. (2005), “Equipment effectiveness: OEE revisited”, IEEE Transactions on Semiconductor Manufacturing, Vol. 18 No. 1, pp. 190‐6.
Fisher, J. (1992), “Use of non‐financial performance measures”, Journal of Cost Management, Vol. 6 No. 2, pp. 31‐8.
Frost, B. (2000), Measuring Performance – Using the New Metrics to Deploy Strategy and Improve Performance, rev. ed., Measurement International, Dallas, TX.
Fullerton, R.R. and McWatters, C.S. (2002), “The role of performance measures and incentive systems in relation to the degree of JIT implementation”, Accounting, Organizations and Society, Vol. 27, pp. 711‐35.
Garengo, P., Nudurupati, S. and Bititci, U. (2007), “Understanding the relationship between PMS and MIS in SMEs: an organizational life cycle perspective”, Computers in Industry, Vol. 58 No. 7, pp. 677‐86.
Gershwin, S.B. (1994), Manufacturing Systems Engineering, Prentice‐Hall, Englewood Cliffs, NJ.
Ghalayini, A.M. and Noble, J.S. (1996), “The changing basis of performance measurement”, International Journal of Operations & Production Management, Vol. 16 No. 8, pp. 63‐80.
Ghalayini, A.M., Noble, J.S. and Crowe, T.C. (1997), “An integrated dynamic performance measurement system for improving manufacturing competitiveness”, International Journal of Production Economics, Vol. 48, pp. 207‐25.
Huang, S.H., Dismukes, J.P., Shi, J., Su, Q., Razzak, M.A., Bodhale, R. and Robinson, D.E. (2003), “Manufacturing productivity improvement using effectiveness metrics and simulation analysis”, International Journal of Production Research, Vol. 41 No. 3, pp. 513‐27.
Hudson, M., Lean, J. and Smart, P.A. (2001a), “Improving control through effective performance measurement in SMEs”, Production Planning and Control, Vol. 12 No. 8, pp. 804‐13.
Hudson, M., Smart, P.A. and Bourne, M. (2001b), “Theory and practice in SME performance measurement systems”, International Journal of Operations & Production Management, Vol. 21 No. 8, pp. 1096‐115.
Jeong, K.Y. and Phillips, D.T. (2001), “Operational efficiency and effectiveness measurement”, International Journal of Operations & Production Management, Vol. 21 No. 11, pp. 1404‐16.
Johnson, H.T. and Kaplan, R.S. (1987), Relevance Lost: The Rise and Fall of Management Accounting, Harvard Business School Press, Boston, MA.
Jonsson, P. and Lesshammar, M. (1999), “Evaluation and improvement of manufacturing performance measurement systems – the role of OEE”, International Journal of Operations & Production Management, Vol. 19 No. 1, pp. 55‐78.
Kaplan, R.S. and Norton, D.P. (1992), “The Balanced Scorecard: measures that drive performance”, Harvard Business Review, January‐February, pp. 71‐9.
Kaydos, W.J. (1999), Operational Performance Measurement: Increasing Total Productivity, CRC Press, Boca Raton, FL.
Laitinen, E.K. (2002), “A dynamic performance measurement system: evidence from small Finnish technology companies”, Scandinavian Journal of Management, Vol. 18, pp. 65‐99.
Ljungberg, Ö. (1998), “Measurement of OEE as a basis for TPM activities”, International Journal of Operations & Production Management, Vol. 18 No. 5, pp. 495‐507.
Lynch, R.L. and Cross, K.F. (1991), Measure Up! Yardsticks for Continuous Improvement, Blackwell, Cambridge, MA.
McNair, C.J., Lynch, R.L. and Cross, K.F. (1990), “Do financial and non‐financial performance measures have to agree?”, Management Accounting, November, pp. 28‐36.
Maskell, B. (1991), Performance Measurement for World Class Manufacturing: A Model for American Companies, Productivity Press, Cambridge, MA.
Medori, D. and Steeple, D. (2000), “A framework for auditing and enhancing performance measurement systems”, International Journal of Operations & Production Management, Vol. 20 No. 5, pp. 520‐33.
Muthiah, K.M.N. and Huang, S.H. (2006), “A review of literature on manufacturing systems productivity measurement and improvement”, International Journal of Industrial and Systems Engineering, Vol. 1 No. 4, pp. 461‐84.
Muthiah, K.M.N. and Huang, S.H. (2007), “Overall throughput effectiveness (OTE) metric for factory‐level performance monitoring and bottleneck detection”, International Journal of Production Research, Vol. 45 No. 20, pp. 4753‐69.
Muthiah, K.M.N., Huang, S.H. and Mahadevan, S. (2008), “Automating factory performance diagnostics using overall throughput effectiveness (OTE) metric”, International Journal of Advanced Manufacturing Technology, Vol. 36 Nos 7/8, pp. 811‐24.
Nachiappan, R.M. and Anantharaman, N. (2006), “Evaluation of overall line effectiveness (OLE) in a continuous product line manufacturing system”, Journal of Manufacturing Technology Management, Vol. 17 No. 7, pp. 987‐1008.
Nakajima, S. (1988), Introduction to TPM: Total Productive Maintenance, Productivity Press, Cambridge, MA.
Neely, A. (1999), “The performance measurement revolution: why now and what next?”, International Journal of Operations & Production Management, Vol. 19 No. 2, pp. 205‐28.
Neely, A., Adams, C. and Kennerley, M. (2002), The Prism: The Scorecard for the Measuring and Managing Stakeholder Relationship, Prentice‐Hall, Englewood Cliffs, NJ.
Schroeder, R.G. (1985), Operations Management: Decision Making in the Operations Function, McGraw‐Hill, New York, NY.
Scott, D. (1999), “Can CIM improve overall factory effectiveness?”, paper presented at the Pacific Microelectronics Symposium, Kauai, HI.
Scott, D. and Pisa, R. (1998), “Can overall factory effectiveness prolong Moore's law?”, Solid State Technology, Vol. 41 No. 3, pp. 75‐82.
Sharma, M.K. and Bhagwat, R. (2007), “Performance measurement system: case studies from SMEs in India”, International Journal of Productivity and Quality Management, Vol. 2 No. 4, pp. 475‐509.
Sink, D.S. and Tuttle, T.C. (1989), Planning and Measurement in Your Organization of the Future, IE Press, Norcross, GA.
Slack, N., Chambers, S. and Johnston, R. (2001), Operations Management, 3rd ed., Pearson Education, Harlow.
Sumanth, D.J. (1985), Productivity Engineering and Management, McGraw‐Hill, New York, NY.
Tangen, S. (2002), “A theoretical foundation for productivity measurement and improvement of automatic assembly systems”, licentiate thesis, The Royal Institute of Technology, Stockholm.
Taticchi, P., Tonelli, F. and Cagnazzo, L. (2010), “Performance measurement and management: a literature review and a research agenda”, Measuring Business Excellence, Vol. 14 No. 1, pp. 4‐18.
Taticchi, P., Balachandran, K., Botarelli, M. and Cagnazzo, L. (2008), “Performance measurement and management for small and medium enterprises: an integrated approach”, Journal of Applied Management and Accounting Research, Vol. 5 No. 2, pp. 57‐72.
Taylor, B.W. and Davis, R.K. (1977), “Corporate productivity – getting it all together”, Industrial Engineering, Vol. 9 No. 3, pp. 32‐6.
Unahabhokha, C., Platts, K. and Tan, K.H. (2007), “Predictive performance measurement system: a fuzzy expert system approach”, Benchmarking: An International Journal, Vol. 14 No. 1, pp. 77‐91.
Wettstein, T. and Kueng, P. (2002), “A maturity model for performance measurement systems”, available at: www.peterk.ch/Wettstein_Kueng_2002.pdf (accessed 10 June 2010).