Optimizing scheduling of long-term highway work zone projects

Linfeng Gong1, Wei Fan2
1Department of Civil and Environmental Engineering, The University of North Carolina at Charlotte, EPIC Building, Room 3366, 9201 University City Boulevard, Charlotte, NC 28223, United States
2Department of Civil and Environmental Engineering, The University of North Carolina at Charlotte, EPIC Building, Room 3261, 9201 University City Boulevard, Charlotte, NC 28223, United States

Tóm tắt

Từ khóa


Tài liệu tham khảo

Bar-Gera, H., 2015. Transportation test problems. <http://www.bgu.ac.il/~bargera/tntp/> Accessed Nov. 11, 2015.

Chen, 1992, Stochastic transportation network design problem with spatial equity constraint, 14

Cheu, 2004, Hybrid genetic algorithm-simulation methodology for pavement maintenance scheduling, Comput.-Aided Civ. Infrastruct. Eng., 19, 446, 10.1111/j.1467-8667.2004.00369.x

Chiu, 2011

Dowling, 2004

Dudek, 1982, Traffic capacity through urban freeway work zones in Texas, 14

Fan, 2004

Fan, 2014, Combined decision making of congestion pricing and capacity expansion: genetic algorithm approach, J. Transp. Eng., 10.1061/(ASCE)TE.1943-5436.0000695

Fan, 2006, Optimal transit route network design problem with variable transit demand: A genetic algorithm approach, J. Transp. Eng., 132, 40, 10.1061/(ASCE)0733-947X(2006)132:1(40)

Goldberg, 1989

Hardy, 2008

Holland, 1975

Jeannotte, 2005

Jiang, Y. Estimation of Traffic Delay and Vehicle Queues at Freeway Work Zones. In: Presented at the 80th Annual Meeting of the Transportation Research Board, Washington, D.C., 2001.

Jiang, 2003, Freeway work zone traffic delay and cost optimization model, J. Transp. Eng., 129, 230, 10.1061/(ASCE)0733-947X(2003)129:3(230)

Luten, 2004

Ma, 2004, Scheduling of lane closures using genetic algorithms with traffic assignments and distributed simulations, J. Transp. Eng., 130, 322, 10.1061/(ASCE)0733-947X(2004)130:3(322)

Meng, 2013, Optimal subwork zone length and project start time for short-term daytime work zones from the contractor’s perspective, Transp. Res. Part C, 29, 72, 10.1016/j.trc.2013.01.001

Michalewicz, 1999

Newell, 1993, A simplified theory of kinematic waves in highway traffic, Part I: General theory, Transp. Res. Part B, 27, 281, 10.1016/0191-2615(93)90038-C

Pesti, 2010

Recker, 2005

Sankar, 2006

Schonfeld, 1999, Optimal work zone lengths for two-lane highways, J. Transp. Eng., 125, 21, 10.1061/(ASCE)0733-947X(1999)125:1(21)

Tang, 2008

Weng, 2013, Estimating capacity and traffic delay in work zones: An overview, Transp. Res. Part C, 35, 34, 10.1016/j.trc.2013.06.005

Wirasinghe, 1978, Determination of traffic delay from shock wave analysis, Transp. Res., 12, 343, 10.1016/0041-1647(78)90010-2

Yin, 2015, Link travel time inference using entry/exit information of trips on a network, Transp. Res. Part B, 80, 303, 10.1016/j.trb.2015.07.007

Zhang, 2011