Abboud NE (1997) A simple approximation of the EMQ model with Poisson machine failures. Prod Plan Control 8(4):385–397
Abboud NE (2001) A discrete-time Markov production–inventory model with machine breakdowns. Comput Ind Eng 39:95–107
Berg M, Posner MJM, Zhao H (1994) Production–inventory systems with unreliable machines. Oper Res 421:111–118
Bielecki T, Kumar PR (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Oper Res 36(4):532–541
Boone T, Ganeshan R, Guo Y, Ord JK (2000) The impact of imperfect processes on production run times. Decis Sci 31(4):773–787
Cárdenas-Barrón LE (2009) Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 57(3):1105–1113
Chakraborty T, Giri BC (2014) Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks. Oper Res Int J 14(1):29–50
Chakraborty T, Giri BC, Chaudhari KS (2008) Production lot sizing with process deterioration and machine breakdown. Eur J Oper Res 185(2):606–618
Chan WM, Ibrahim RN, Lochert PB (2003) A new EPQ model: integrating lower pricing, rework and reject situations. Prod Plan Control 14(7):588–595
Chiu YP (2003) Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng Optim 35(4):427–437
Chiu SW, Wang SL, Chiu YSP (2007) Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur J Oper Res 180:664–676
Chiu YSP, Lin HD, Chang HH (2011) Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Comput Ind Eng 60(4):576–584
Chiu SW, Chou CL, Wu WK (2013) Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown. Econ Model 35:330–337
Chiu SW, Lin HD, Song MS, Chen HM, Chiu YSP (2015) An extended EPQ-based problem with a discontinuous delivery policy, scrap rate, and random breakdown. Sci World J. https://doi.org/10.1155/2015/621978
Chung KJ (1997) Bounds for production lot sizing with machine breakdowns. Comput Ind Eng 32(1):139–144
Chung KJ (2003) Approximations to production lot sizing with machine breakdowns. Comput Oper Res 30(10):1499–1507
Chung KJ, Hou KL (2003) An optimal production run time with imperfect production processes and allowable shortages. Comput Oper Res 30(4):483–490
Flapper SDP, Teunter RH (2004) Logistic planning of rework with deteriorating work-in-process. Int J Prod Econ 88:51–59
Flapper SDP, Fransoo JC, Broekmeulen RACM, Inderfurth K (2002) Planning and control of rework in the process industries: a review. Prod Plan Control 13(1):26–34
Giri BC, Dohi T (2006) Optimal inspection schedule in an imperfect EMQ model with free repair warranty policy. J Oper Res Soc Jpn 49(3):222–237
Glock CH (2013) The machine breakdown paradox: how random shifts in the production rate may increase company profits. Comput Ind Eng 66:1171–1176
Glock CH, Jaber MY (2013a) An economic production quantity (EPQ) model for a customer-dominated supply chain with defective items, reworking and scrap. Int J Serv Oper Manag 14:236–251
Glock CH, Jaber MY (2013b) A multi-stage production-inventory model with learning and forgetting effects, rework and scrap. Comput Ind Eng 64:708–720
Groenevelt H, Pintelon L, Seidmann A (1992) Production lot sizing with machine breakdowns. Manag Sci 38(1):104–123
Gupta T, Chakraborty S (1984) Looping in a multistage production system. Int J Prod Res 22(2):299–311
Hayek PA, Salameh MK (2001) Production lot sizing with the reworking of imperfect quality items produced. Prod Plan Control 12(6):584–590
Hsu JT, Hsu LF (2013) Two EPQ models with imperfect production process, inspection errors, planned backorders, and sales returns. Comput Ind Eng 64(1):389–402
Hsu LF, Hsu JT (2015) Economic production quantity (EPQ) models under an imperfect production process with shortages backordered. Int J Syst Sci 47(4):852–867
Huang H, He Y, Li D (2017) EPQ for an unreliable production system with endogenous reliability and product deterioration. Int Trans Oper Res 24:839–866
Inderfurth K, Janiak A, Kovalyov MY, Werner F (2006) Batching work and rework processes with limited deterioration of reworkables. Comput Oper Res 33:1595–1605
Jamal AMM, Sarker BR, Mondal S (2004) Optimal manufacturing batch size with rework process at a single-stage production system. Comput Ind Eng 47(1):77–89
Khan M, Jaber MY, Guiffrida AL, Zolfaghari S (2011) A review of the extensions of a modified EOQ model for imperfect quality items. Int J Prod Econ 132:1–12
Kontantaras I, Goyal SK, Papachristos S (2007) Economic ordering policy for an item with imperfect quality subject to the in-house inspection. Int J Syst Sci 38(6):473–482
Lee HL, Rosenblatt MJ (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Manag Sci 33(9):1125–1136
Li N, Chan FTS, Chung SH, Tai AH (2015) An EPQ model for deteriorating production system and items with rework. Math Probl Eng. https://doi.org/10.1155/2015/957970
Liao GL (2016) Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance. Int J Prod Res 54(20):6265–6280
Lin GC, Gong DC (2006) On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time. Math Comput Model 43(7–8):920–932
Lin GC, Kroll DE (2006) Economic lot sizing for an imperfect production system subject to random breakdowns. Eng Optim 38(1):73–92
Lin GC, Lin HD (2007) Determining a production run time for an imperfect production–inventory system with scrap. J Sci Ind Res 66:724–735
Liu B, Cao J (1999) Analysis of a production–inventory system with machine breakdowns and shutdowns. Comput Oper Res 20(1):73–91
Liu JJ, Yang P (1996) Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs. Eur J Oper Res 91:517–527
Liu N, Kim Y, Hwang H (2009) An optimal operating policy for the production system with rework. Comput Ind Eng 56:874–887
Ma WN, Gong DC, Lin GC (2010) An optimal common production cycle time for imperfect production processes with scrap. Math Comput Model 52:724–737
Maddah B, Salameh MK, Karame GM (2009) Lot sizing with random yield and different qualities. Appl Math Model 33(4):1997–2009
Moinzadeh K, Aggarwal P (1997) Analysis of a production/inventory system subject to random disruptions. Manag Sci 43(11):1577–1588
Mokhtari H (2018) A joint international production and external supplier order lot size optimization under defective manufacturing and rework. Int J Adv Manuf Technol 95(1–4):1039–1058
Moussawi-Haidar L, Salameh M, Nasr W (2016) Production lot sizing with quality screening and rework. Appl Math Model 40:3242–3256
Nobil AH, Sedigh AHA, Tiwari S, Wee HM (2018) An imperfect multi-item single machine production system with shortage, rework, and scrapped considering inspection, dissimilar deficiency levels, and non-zero setup times. Scientia Iranica. https://doi.org/10.24200/sci.2018.4984.1031
Öztürk H (2017) A note on “Production lot sizing with quality screening and rework”. Appl Math Model 43:659–669
Porteus EL (1986) Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 34:137–144
Rezaei J (2016) Economic order quantity and sampling inspection plans for imperfect items. Comput Ind Eng 96:1–7
Rosenblatt MJ, Lee HL (1986) Economic production cycles with imperfect production processes. IIE Trans 18(1):48–55
Salameh MK, Jaber MY (2000) Economic production quantity model for items with imperfect quality. Int J Prod Econ 64:59–64
Sarkar B, Cárdenas-Barrón LE, Sarkar M, Singgih ML (2014) An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J Manuf Syst 33(3):423–435
Sharafali M (1984) On a continuous review production–inventory problem. Oper Res Lett 3(4):199–204
Shih W (1980) Optimal inventory policies when stockouts result from defective products. Int J Prod Res 18(6):677–686
Suntag C (1993) Inspection and inspection quality management. ASQC, Milwaukee
Tai AH (2013) Economic production quantity models for deteriorating/imperfect products and service with rework. Comput Ind Eng 66:879–888
Taleizadeh AA, Cárdenas-Barrón LE, Mohammadi B (2014) A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing. Int J Prod Econ 150:9–27
Taleizadeh AA, Sari-Khanbaglo MP, Cárdenas-Barrón LE (2017) Outsourcing rework of imperfect items in the economic production quantity (EPQ) inventory model with backordered demand. IEEE Trans Syst Man Cybern Syst. https://doi.org/10.1109/tsmc.2017.2778943
Ting CK, Chiu YSP, Chan CCH (2011) Optimal lot sizing with scrap and random breakdown occurring in backorder replenishing period. Math Comput Appl 16(2):329–339
Tsao YC, Chen TH, Huang SM (2011) A production policy considering reworking of imperfect items and trade credit. Flex Serv Manuf J 23:48–63
Wazwaz AM (2011) Linear and nonlinear integral equations. Springer, Beijing
Wee HM, Widyadana GA (2013) A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule. Omega 41(6):941–954
Wee HM, Wang WT, Cárdenas-Barrón LE (2013) An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders. Comput Ind Eng 64(2):748–755
Wee HM, Wang WT, Kuo TC, Cheng YL, Huang YD (2014) An economic production quantity model with non-synchronized screening and rework. Appl Math Comput 233:127–138
Widyadana GA, Wee HM (2011) Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. Appl Math Model 35:3495–3508
Widyadana GA, Wee HM (2012) An economic production quantity model for deteriorating items with preventive maintenance policy and random machine breakdown. Int J Syst Sci 43(10):1870–1882
Yoo SH, Kim DS, Park MS (2009) Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return. Int J Prod Econ 121(1):255–265
Zhang X, Gerchak Y (1990) Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Trans 22(1):41–47