Optimal manufacturer's cost sharing ratio, shipping policy and production rate – A two-echelon supply chain
Tài liệu tham khảo
Rau, 2003, Integrated inventory model for deteriorating items under a multi-echelon supply chain environment, Int J Prod Econ, 86, 155, 10.1016/S0925-5273(03)00048-3
Zhao, 2018, Stochastic customer order scheduling with setup times to minimize expected cycle time, Int J Prod Res, 7543, 1
Taifa, 2019, Cycle time reduction for productivity improvement in the manufacturing industry, J Ind Eng Manag Stud, 6, 147
Cachon, 1999, Competitive and cooperative inventory policies in a two-stage supply chain, Manag Sci, 45, 936, 10.1287/mnsc.45.7.936
AlDurgam, 2019, Economic production quantity model with variable machining rates and product quality, Int J Eng Bus Manag, 11, 1, 10.1177/1847979019872619
Chang, 2006, Integrated vendor–buyer cooperative inventory models with controllable lead time and ordering cost reduction, Eur J Oper Res, 170, 481, 10.1016/j.ejor.2004.06.029
Gharaei, 2021, An integrated stochastic EPQ model under quality and green policies: Generalised cross decomposition under the separability approach, Int J Syst Sci Oper Logist, 8, 119
Ghiami, 2015, A two-echelon production-inventory model for deteriorating items with multiple buyers, Int J Prod Econ, 159, 233, 10.1016/j.ijpe.2014.09.017
Jalbar, 2005, Integer-ratio policies for distribution/inventory systems, Int J Prod Econ, 93-94, 407, 10.1016/j.ijpe.2004.06.037
Ouyang, 2004, Integrated vendor–buyer cooperative models with stochastic demand in controllable lead time, Int J Prod Econ, 92, 255, 10.1016/j.ijpe.2003.10.016
Sarkar, 2013, A production-inventory model with probabilistic deterioration in two-echelon supply chain management, Appl Math Model, 37, 3138, 10.1016/j.apm.2012.07.026
Yan, 2011, An integrated production-distribution model for a deteriorating inventory item, Int J Prod Econ, 133, 228, 10.1016/j.ijpe.2010.04.025
Yang, 2000, Economic ordering policy of deteriorated item for vendor and buyer: an integrated approach, Prod Plan Control, 11, 474, 10.1080/09537280050051979
Yu, 2004, An integrated vendor-managed-inventory model for deteriorating item, Chin J Manag Sci, 12, 32
Utama, 2022, Integrated procurement-production inventory model in supply chain: a systematic review, Oper Res Perspect, 9
Kim, 1997, Implementation of JIT purchasing: an integrated approach, Prod Plan Control, 2, 152
Chou, 2000
Klein, 2007, Competitive and cooperative positioning in supply chain logistics relationships, Decis Sci, 38, 611, 10.1111/j.1540-5915.2007.00172.x
Glock, 2012, The joint economic lot size problem: a review, Int J Prod Econ, 136, 671, 10.1016/j.ijpe.2011.10.026
Gharaei, 2022, An integrated lot-sizing policy for the inventory management of constrained multi-level supply chains: Null-space method, Int J Syst Sci Oper Logist
Dolai, 2022, Analyzing an imperfect production inventory model for green products considering learning effect on screening process under advertisement dependent credit period, J Ind Manag Optim
Panja, 2020, Exploring a two-layer green supply chain game theoretic model with credit linked demand and mark-up under revenue sharing contract, J Clean Prod, 250, 10.1016/j.jclepro.2019.119491
Khara, 2020, Sustainable recycling in an imperfect production system with acceptance quality level dependent development cost and demand, Comput Ind Eng, 142, 10.1016/j.cie.2020.106300
Glock, 2010, Batch sizing with controllable production rates, Int J Prod Econ, 48, 5925, 10.1080/00207540903170906
Khouja, 1994, The economic production lot size model under volume flexibility, Comput Oper Res, 22, 515, 10.1016/0305-0548(94)00032-4
Giri, 2005, Optimal design of unreliable production–inventory systems with variable production rate, Eur J Oper Res, 162, 372, 10.1016/j.ejor.2003.10.015
Larsen, 2005, The economic production lot size model extended to include more than one production rate, Int Trans Oper Res, 12, 339, 10.1111/j.1475-3995.2005.500_1.x
Sana, 2010, An economic production lot size model in an imperfect production system, Eur J Oper Res, 201, 158, 10.1016/j.ejor.2009.02.027
Manna, 2018, An EPQ model with promotional demand in random planning horizon: Population varying genetic algorithm approach, J Intel Manuf, 29, 1515, 10.1007/s10845-016-1195-0
Dolai, 2021, Work performance dependent screening process under preservation technology in an imperfect production system, J Ind Prod Eng, 38, 414
Askari, 2021, A multi-product EPQ model for defective production and inspection with single machine, and operational constraints: Stochastic programming approach, 10.1007/978-3-030-89743-7_10
Hax, 1984
Silver, 1998
Glock, 2021, The impact of controllable production rates on the performance of inventory systems: a systematic review of the literature, Eur J Oper Res, 288, 703, 10.1016/j.ejor.2020.05.033
Glock, 2012, Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand, Int J Prod Econ, 136, 37, 10.1016/j.ijpe.2011.09.007
Jauhari, 2014, Joint economic lot size (JELS) model for single-vendor single-buyer with variable production rate and partial backorder, Int J Oper Res, 20, 91, 10.1504/IJOR.2014.060517
AlDurgam, 2017, A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate, Int J Prod Econ, 191, 335, 10.1016/j.ijpe.2017.05.017
Kim, 2018, Production planning for a two-stage production system with multiple parallel machines and variable production rates, Int J Prod Econ, 196, 284, 10.1016/j.ijpe.2017.11.018
Jauhari, 2022, Low carbon inventory model for vendor‒buyer system with hybrid production and adjustable production rate under stochastic demand, Appl Math Model, 108, 840, 10.1016/j.apm.2022.04.012
Jauhari, 2022, Sustainable inventory management with hybrid production system and investment to reduce defects, Ann Oper Res
Lu, 2016, Optimal buyer’s replenishment policy in the integrated inventory model for imperfect items, Math Problems Eng, 2016, 1
Popov, 2019, Mathematical approach for determining the optimal size of a logistic unit in case of high transport risk, 110018, 2172, 10.1063/1.5133621
Siajadi, 2006, Joint economic lot size in distribution system with multiple shipment policy, Int J Prod Econ, 102, 302, 10.1016/j.ijpe.2005.04.003
David, 2003, How far should JIT vendor-buyer relationship go?, Int J Prod Econ, 81-82, 361, 10.1016/S0925-5273(02)00274-8
Herbon, 2020, An approximated solution to the constrained integrated manufacturer-buyer supply problem, Oper Res Perspect, 7
Maimon, 1998
Roohnavazfar, 2019, Optimal paths in multi-stage stochastic decision networks, Oper Res Perspect, 6