Operational risk analysis of block sections in the railway network
Tài liệu tham khảo
Andersson, 2013, Quantifying railway timetable robustness in critical points, J. Rail Transp. Plan. Manag., 3, 95
Bergström, 2013
Bidot, J., Laborie, P., Beck, J.C. and Vidal, T. (2006), Using constraint programming and simulation for execution monitoring and progressive scheduling, Proceedings of the 12th IFAC Symposium on Information Control Problems in Manufacturing, Saint-Étienne, France, pp. 595–600.
Briggs, 2007, Modelling train delays with q-exponential functions, Phys. A Stat. Mech. Its Appl., 378, 498, 10.1016/j.physa.2006.11.084
Bruinsma, 1999, Unreliability in public transport chains, 359
Cheng, 1998, Hybrid simulation for resolving resource conflicts in train traffic rescheduling, Comput. Industry, 35, 233, 10.1016/S0166-3615(97)00071-7
Cui, 2016, Calibration of disturbance parameters in railway operational simulation based on reinforcement learning, J. Rail Transp. Plan. Manag., 6, 1
D'Ariano, 2008
DB NETZ, 2008
Drewello, H. and Günther, F. (2012), Bottleneck in railway infrastructure - do they really exist? The corridor Rotterdam - Genoa, paper presented at European Transport Conference, Glasgow.
Espinosa-Aranda, 2012, A discrete event-based simulation model for real-time traffic management in railways, J. Intell. Transp. Syst., vol 16, 94, 10.1080/15472450.2012.671713
Goverde, 2005
Goverde, 2001
Hantsch, 2013, Methoden zur Engpassanalyse bei der Infrastrukturbemessung im Schienenverkehr, Eisenbahntech. Rundsch. (ETR), 62, 30
Hartwig, 2013
Higgins, 1998, Modeling train delays in urban networks, Transp. Sci., 32, 346, 10.1287/trsc.32.4.346
Huisman, 2007, vol 22
Kroon, 2008, Stoch. Improv. Cycl. Railw. timetables, Transp. Res. Part B Methodol., 42, 553, 10.1016/j.trb.2007.11.002
Li, 2015, Ursachenbezogene Engpassbewertung in der Eisenbahn betriebssimulation (EPSUR), Eisenbahntech. Rundsch. (ETR), 64, 30
Lindfeldt, 2015
Martin, 2014
Martin, 2014, vol. 7
Martin, 2015, vol 11
Martin, 2008
Martin, 2012, Bewertungsverfahren für Knotenelemente bei der Infrastrukturbemessung - RePlan, Eisenbahntech. Rundsch. (ETR), 11, 38
Nash, 2004, Optimizing railway timetables with open time table, vol 74, 637
Nießen, 2008
Pachl, 2002
Pöhle, 2016, What are new insights using optimized train path assignment for the development of railway infrastructure?, 457
Quaglietta, 2013, Stability of railway dispatching solutions under a stochastic and dynamic environment, J. Rail Transp. Plan. Manag., 3, 137
RMCON Rail Mangement Consultants, 2010
Rotoli, 2016, Complex railway systems: capacity and utilization of interconnected networks, Eur. Transp. Res. Rev., 8, 8
Rotoli, 2016, Capacity analysis of suburban rail networks, 111, 10.2495/CR160111
Schwanhäusser, 1974
Shafia, 2012, Robust train timetabling problem. Mathematical model and branch and bound algorithm, IEEE Trans. Intell. Transp. Syst., 13, 307, 10.1109/TITS.2011.2169961
UIC, 2013
Yuan, 2006, vol. 6
Yuan, 2002, Propagation of train delays in stations