Operational risk analysis of block sections in the railway network

Journal of Rail Transport Planning and Management - Tập 7 - Trang 245-262 - 2017
Weiting Zhao1, Ullrich Martin1, Yong Cui1, Jiajian Liang1
1Institut für Eisenbahn- und Verkehrswesen, Universität Stuttgart, Pfaffenwaldring 7, 70569 Stuttgart, Germany

Tài liệu tham khảo

Andersson, 2013, Quantifying railway timetable robustness in critical points, J. Rail Transp. Plan. Manag., 3, 95 Bergström, 2013 Bidot, J., Laborie, P., Beck, J.C. and Vidal, T. (2006), Using constraint programming and simulation for execution monitoring and progressive scheduling, Proceedings of the 12th IFAC Symposium on Information Control Problems in Manufacturing, Saint-Étienne, France, pp. 595–600. Briggs, 2007, Modelling train delays with q-exponential functions, Phys. A Stat. Mech. Its Appl., 378, 498, 10.1016/j.physa.2006.11.084 Bruinsma, 1999, Unreliability in public transport chains, 359 Cheng, 1998, Hybrid simulation for resolving resource conflicts in train traffic rescheduling, Comput. Industry, 35, 233, 10.1016/S0166-3615(97)00071-7 Cui, 2016, Calibration of disturbance parameters in railway operational simulation based on reinforcement learning, J. Rail Transp. Plan. Manag., 6, 1 D'Ariano, 2008 DB NETZ, 2008 Drewello, H. and Günther, F. (2012), Bottleneck in railway infrastructure - do they really exist? The corridor Rotterdam - Genoa, paper presented at European Transport Conference, Glasgow. Espinosa-Aranda, 2012, A discrete event-based simulation model for real-time traffic management in railways, J. Intell. Transp. Syst., vol 16, 94, 10.1080/15472450.2012.671713 Goverde, 2005 Goverde, 2001 Hantsch, 2013, Methoden zur Engpassanalyse bei der Infrastrukturbemessung im Schienenverkehr, Eisenbahntech. Rundsch. (ETR), 62, 30 Hartwig, 2013 Higgins, 1998, Modeling train delays in urban networks, Transp. Sci., 32, 346, 10.1287/trsc.32.4.346 Huisman, 2007, vol 22 Kroon, 2008, Stoch. Improv. Cycl. Railw. timetables, Transp. Res. Part B Methodol., 42, 553, 10.1016/j.trb.2007.11.002 Li, 2015, Ursachenbezogene Engpassbewertung in der Eisenbahn betriebssimulation (EPSUR), Eisenbahntech. Rundsch. (ETR), 64, 30 Lindfeldt, 2015 Martin, 2014 Martin, 2014, vol. 7 Martin, 2015, vol 11 Martin, 2008 Martin, 2012, Bewertungsverfahren für Knotenelemente bei der Infrastrukturbemessung - RePlan, Eisenbahntech. Rundsch. (ETR), 11, 38 Nash, 2004, Optimizing railway timetables with open time table, vol 74, 637 Nießen, 2008 Pachl, 2002 Pöhle, 2016, What are new insights using optimized train path assignment for the development of railway infrastructure?, 457 Quaglietta, 2013, Stability of railway dispatching solutions under a stochastic and dynamic environment, J. Rail Transp. Plan. Manag., 3, 137 RMCON Rail Mangement Consultants, 2010 Rotoli, 2016, Complex railway systems: capacity and utilization of interconnected networks, Eur. Transp. Res. Rev., 8, 8 Rotoli, 2016, Capacity analysis of suburban rail networks, 111, 10.2495/CR160111 Schwanhäusser, 1974 Shafia, 2012, Robust train timetabling problem. Mathematical model and branch and bound algorithm, IEEE Trans. Intell. Transp. Syst., 13, 307, 10.1109/TITS.2011.2169961 UIC, 2013 Yuan, 2006, vol. 6 Yuan, 2002, Propagation of train delays in stations