On the integration of input and output control: Workload Control order release

International Journal of Production Economics - Tập 174 - Trang 43-53 - 2016
Matthias Thürer1, Mark Stevenson2, Martin J. Land3
1Jinan University, Huangpu Road, No 601, 510632 Guangzhou, PR China
2Lancaster University, Department of Management Science, Lancaster University Management School, LA1 4YX, UK
3University of Groningen, Department of Operations, Faculty of Economics and Business, 9700 AV Groningen, The Netherlands

Tài liệu tham khảo

Bechte, 1994, Load-oriented manufacturing control just-in-time production for job shops, Prod. Plan. Control, 5, 292, 10.1080/09537289408919499 Bergamaschi, 1997, Order review and release strategies in a job shop environment: a review and a classification, Int. J. Prod. Res., 35, 399, 10.1080/002075497195821 Bertrand, 2001, A study of simple rules for subcontracting in make-to-order manufacturing, Eur. J. Oper. Res., 128, 509, 10.1016/S0377-2217(99)00371-9 Conway, 1967 Fredendall, 2010, Concerning the theory of workload control, Eur. J. Oper. Res., 201, 99, 10.1016/j.ejor.2009.02.003 Hendry, 2013, Workload control: Successful implementation taking a contingency-based view of production planning & control, Int. J. Oper. Prod. Manag., 33, 69, 10.1108/01443571311288057 Hendry, 1998, The effect of workload control (WLC) on performance in make-to-order companies, J. Oper. Manag., 16, 63, 10.1016/S0272-6963(97)00011-9 Kanet, 1988, Load-limited order release in job shop scheduling systems, J. Oper. Manag., 7, 44, 10.1016/0272-6963(81)90003-6 Kingsman, 2000, Modelling input-output workload control for dynamic capacity planning in production planning systems, Int. J. Prod. Econ., 68, 73, 10.1016/S0925-5273(00)00037-2 Kingsman, 2002, The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies, Prod. Plan. Control, 13, 579, 10.1080/0953728021000026285 Land, 2006, Parameters and sensitivity in workload control, Int. J. Prod. Econ., 104, 625, 10.1016/j.ijpe.2005.03.001 Land, 1996, Workload control concepts in job shops: a critical assessment, Int. J. Prod. Econ., 46–47, 535, 10.1016/S0925-5273(96)00088-6 Land, 1998, The performance of workload control concepts in job shops: improving the release method, Int. J. Prod. Econ., 56–57, 347, 10.1016/S0925-5273(98)00052-8 Land, 2015, Job shop control: in search of the key to delivery improvements, Int. J. Prod. Econ., 168, 257, 10.1016/j.ijpe.2015.07.007 Malhotra, 1993, The impact of learning and labor attrition on worker flexibility in dual resource constrained job, Decis. Sci., 24, 641, 10.1111/j.1540-5915.1993.tb01296.x Melnyk, 1989, Order review/release: research issues and perspectives, Int. J. Prod. Res., 27, 1081, 10.1080/00207548908942609 Moreira, 2009, A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem, Int. J. Prod. Res., 47, 2805, 10.1080/00207540701725083 Oosterman, 2000, The influence of shop characteristics on workload control, Int. J. Prod. Econ., 68, 107, 10.1016/S0925-5273(99)00141-3 Philipoom, 1992, Capacity-based order review/release strategies to improve manufacturing performance, Int. J. Prod. Res., 30, 2559, 10.1080/00207549208948176 Philipoom, 1993, An evaluation of capacity sensitive order review and release procedures in job shops, Decis. Sci., 24, 1109, 10.1111/j.1540-5915.1993.tb00506.x Plossl, G.W., and Wight, O.W., 1971. Capacity planning and control. Working paper presented at the APICS International Conference in St.Louis, Missouri. Sabuncuoglu, 1999, Analysis of order review/release problems in production systems, Int. J. Prod. Econ., 62, 259, 10.1016/S0925-5273(98)00248-5 Silva, 2015, A case study of the successful implementation of workload control: a practitioner-led approach, J. Manuf. Technol. Manag., 26, 280, 10.1108/JMTM-10-2013-0144 Stevenson, 2006, Refining a workload control (WLC) concept: a case study, Int. J. Prod. Res., 44, 767, 10.1080/00207540500338070 Stevenson, 2008, Theoretical development of a workload control methodology: evidence from two case studies, Int. J. Prod. Res., 46, 3107, 10.1080/00207540601039791 Stevenson, 2005, A review of production planning and control: the applicability of key concepts to the make to order industry, Int. J. Prod. Res., 43, 869, 10.1080/0020754042000298520 Thürer, 2011, Three decades of workload control research: a systematic review of the literature, Int. J. Prod. Res., 49, 6905, 10.1080/00207543.2010.519000 Thürer, 2012, Workload control (WLC) and order release: a lean solution for make-to-order companies, Prod. Oper. Manag., 21, 939, 10.1111/j.1937-5956.2011.01307.x Thürer, 2014, Lean control for make-to-order companies: integrating customer enquiry management and order release, Prod. Oper. Manag., 23, 463, 10.1111/poms.12058 Thürer, 2014, The design of simple subcontracting rules for make-to-order shops: an assessment by simulation, Eur. J. Oper. Res., 239, 854, 10.1016/j.ejor.2014.06.018 Thürer, 2015, Concerning workload control and order release: the pre-shop pool sequencing decision, Prod. Oper. Manag., 24, 1179, 10.1111/poms.12304 Thürer, 2015, Simple subcontracting rules for make-to-order shops with limited subcontractor capacity: an assessment by simulation, Prod. Plan. Control, 26, 1145, 10.1080/09537287.2015.1019590 Wiendahl, 1992, Application of load-oriented manufacturing control in industry, Prod. Plan. Control, 3, 118, 10.1080/09537289208919381 Wight, 1970, Input/Output control a real handle on lead time, Prod. Inventory Manag. J., 11, 9 Wisner, 1995, A review of the order release policy research, Int. J. Oper. Prod. Manag., 15, 25, 10.1108/01443579510090318 Zäpfel, 1993, New concepts for production planning and control, Eur. J. Oper. Res., 67, 297, 10.1016/0377-2217(93)90287-W