On the integration of input and output control: Workload Control order release
Tài liệu tham khảo
Bechte, 1994, Load-oriented manufacturing control just-in-time production for job shops, Prod. Plan. Control, 5, 292, 10.1080/09537289408919499
Bergamaschi, 1997, Order review and release strategies in a job shop environment: a review and a classification, Int. J. Prod. Res., 35, 399, 10.1080/002075497195821
Bertrand, 2001, A study of simple rules for subcontracting in make-to-order manufacturing, Eur. J. Oper. Res., 128, 509, 10.1016/S0377-2217(99)00371-9
Conway, 1967
Fredendall, 2010, Concerning the theory of workload control, Eur. J. Oper. Res., 201, 99, 10.1016/j.ejor.2009.02.003
Hendry, 2013, Workload control: Successful implementation taking a contingency-based view of production planning & control, Int. J. Oper. Prod. Manag., 33, 69, 10.1108/01443571311288057
Hendry, 1998, The effect of workload control (WLC) on performance in make-to-order companies, J. Oper. Manag., 16, 63, 10.1016/S0272-6963(97)00011-9
Kanet, 1988, Load-limited order release in job shop scheduling systems, J. Oper. Manag., 7, 44, 10.1016/0272-6963(81)90003-6
Kingsman, 2000, Modelling input-output workload control for dynamic capacity planning in production planning systems, Int. J. Prod. Econ., 68, 73, 10.1016/S0925-5273(00)00037-2
Kingsman, 2002, The relative contributions of input and output controls on the performance of a workload control system in Make-To-Order companies, Prod. Plan. Control, 13, 579, 10.1080/0953728021000026285
Land, 2006, Parameters and sensitivity in workload control, Int. J. Prod. Econ., 104, 625, 10.1016/j.ijpe.2005.03.001
Land, 1996, Workload control concepts in job shops: a critical assessment, Int. J. Prod. Econ., 46–47, 535, 10.1016/S0925-5273(96)00088-6
Land, 1998, The performance of workload control concepts in job shops: improving the release method, Int. J. Prod. Econ., 56–57, 347, 10.1016/S0925-5273(98)00052-8
Land, 2015, Job shop control: in search of the key to delivery improvements, Int. J. Prod. Econ., 168, 257, 10.1016/j.ijpe.2015.07.007
Malhotra, 1993, The impact of learning and labor attrition on worker flexibility in dual resource constrained job, Decis. Sci., 24, 641, 10.1111/j.1540-5915.1993.tb01296.x
Melnyk, 1989, Order review/release: research issues and perspectives, Int. J. Prod. Res., 27, 1081, 10.1080/00207548908942609
Moreira, 2009, A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem, Int. J. Prod. Res., 47, 2805, 10.1080/00207540701725083
Oosterman, 2000, The influence of shop characteristics on workload control, Int. J. Prod. Econ., 68, 107, 10.1016/S0925-5273(99)00141-3
Philipoom, 1992, Capacity-based order review/release strategies to improve manufacturing performance, Int. J. Prod. Res., 30, 2559, 10.1080/00207549208948176
Philipoom, 1993, An evaluation of capacity sensitive order review and release procedures in job shops, Decis. Sci., 24, 1109, 10.1111/j.1540-5915.1993.tb00506.x
Plossl, G.W., and Wight, O.W., 1971. Capacity planning and control. Working paper presented at the APICS International Conference in St.Louis, Missouri.
Sabuncuoglu, 1999, Analysis of order review/release problems in production systems, Int. J. Prod. Econ., 62, 259, 10.1016/S0925-5273(98)00248-5
Silva, 2015, A case study of the successful implementation of workload control: a practitioner-led approach, J. Manuf. Technol. Manag., 26, 280, 10.1108/JMTM-10-2013-0144
Stevenson, 2006, Refining a workload control (WLC) concept: a case study, Int. J. Prod. Res., 44, 767, 10.1080/00207540500338070
Stevenson, 2008, Theoretical development of a workload control methodology: evidence from two case studies, Int. J. Prod. Res., 46, 3107, 10.1080/00207540601039791
Stevenson, 2005, A review of production planning and control: the applicability of key concepts to the make to order industry, Int. J. Prod. Res., 43, 869, 10.1080/0020754042000298520
Thürer, 2011, Three decades of workload control research: a systematic review of the literature, Int. J. Prod. Res., 49, 6905, 10.1080/00207543.2010.519000
Thürer, 2012, Workload control (WLC) and order release: a lean solution for make-to-order companies, Prod. Oper. Manag., 21, 939, 10.1111/j.1937-5956.2011.01307.x
Thürer, 2014, Lean control for make-to-order companies: integrating customer enquiry management and order release, Prod. Oper. Manag., 23, 463, 10.1111/poms.12058
Thürer, 2014, The design of simple subcontracting rules for make-to-order shops: an assessment by simulation, Eur. J. Oper. Res., 239, 854, 10.1016/j.ejor.2014.06.018
Thürer, 2015, Concerning workload control and order release: the pre-shop pool sequencing decision, Prod. Oper. Manag., 24, 1179, 10.1111/poms.12304
Thürer, 2015, Simple subcontracting rules for make-to-order shops with limited subcontractor capacity: an assessment by simulation, Prod. Plan. Control, 26, 1145, 10.1080/09537287.2015.1019590
Wiendahl, 1992, Application of load-oriented manufacturing control in industry, Prod. Plan. Control, 3, 118, 10.1080/09537289208919381
Wight, 1970, Input/Output control a real handle on lead time, Prod. Inventory Manag. J., 11, 9
Wisner, 1995, A review of the order release policy research, Int. J. Oper. Prod. Manag., 15, 25, 10.1108/01443579510090318
Zäpfel, 1993, New concepts for production planning and control, Eur. J. Oper. Res., 67, 297, 10.1016/0377-2217(93)90287-W