Multiple-objective scheduling for interbay AMHS by using genetic-programming-based composite dispatching rules generator
Tài liệu tham khảo
Uzsoy, 1992, A review of production planning and scheduling models in the semiconductor industry, part I: system characteristics, performance evaluation and production planning, IIE Transactions, 24, 47, 10.1080/07408179208964233
Kuo, 2006, Dispatching of overhead hoist vehicles in a fab intrabay using a multimission-oriented controller, International Journal of Advanced Manufacturing Technology, 27, 824, 10.1007/s00170-004-2244-y
Agrawal, 2006, A survey of automated material handling systems in 300-mm semiconductor Fabs, IEEE Transactions on Semiconductor Manufacturing, 19, 112, 10.1109/TSM.2005.863217
Chung, 2004, An overview of semiconductor fab automation systems, IEEE Robotics and Automation Magazine, 11, 8
Montoya-Torres, 2006, A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs, Production Planning and Control, 17, 648, 10.1080/09537280600900774
Tompkins, 1984
Kaemph, 1997, Automated wafer transport in the wafer fab, 356
Davis, 1995, Addressing automated materials handling in an existing wafer fab, Semiconductor International, 18, 125
Lin, 2001, Simulation analysis of dispatching rules for an automated interbay material handling system in wafer fab, International Journal of Production Research, 39, 1221, 10.1080/00207540010005718
Wang, 2007, Agent-based interbay system control for a single loop semiconductor manufacturing fab, Production Planning and Control, 18, 74, 10.1080/09537280600909437
Kaempf, 1997, Automated wafer transport in the wafer Fab, 356
Jang, 2001, An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines, International Journal of Production Research, 39, 3901, 10.1080/00207540110056261
Le-anh, 2005, On-line dispatching rules for vehicle-based internal transport systems, International Journal of Production Research, 43, 1711, 10.1080/00207540412331320481
Cardarelli, 1995, Simulation tool for design and management optimization of automated interbay material handling and storage systems for large wafer fab, IEEE Transactions on Semiconductor Manufacturing, 8, 44, 10.1109/66.350756
Lin, 2004, The maximum loading and the optimum number of vehicles in a double-loop of an interbay material system, Production Planning and Control, 15, 247, 10.1080/09537280410001688666
Bahri, 2001, A comparison of unified vs. segregated automated material handling systems for 300mm fabs, 3
Fu, 2001, An effective OHT dispatch policy for 300mm AMHS management, 35
Mackulak, 2001, A simulation-based experiment for comparing AMHS performance in a semiconductor fabrication facility, IEEE Transactions on Semiconductor Manufacturing, 14, 273, 10.1109/66.939828
Mittler, 1999, Comparison of dispatching rules for semiconductor manufacturing using large facility models, 709
Torres, 2006, A literature survey on the design approaches and operational issues of automated wafer-transport systems for wafer fabs, Production Planning and Control, 17, 648, 10.1080/09537280600900774
Kim, 2007, Effective of vehicle reassignment in a large-scale overhead hoist transport system, International Journal of Production Research, 45, 789, 10.1080/00207540600675819
Correa, 2007, Scheduling and routing of automated guided vehicles: a hybrid approach, Computers & operations research, 34, 1688, 10.1016/j.cor.2005.07.004
Desaultniers, 2004, Dispatching and conflict-free routing of automated guided vehicles: an exact approach, The International Journal of Flexible Manufacturing Systems, 15, 309, 10.1023/B:FLEX.0000036032.41757.3d
Wang, 2002, Prioritized automatic material handling services in 300mm foundry manufacturing, 109
Berger, 2004, A parallel hybrid genetic algorithm for the vehicle routing problem with time windows, Computers and Operations Research, 31, 2037, 10.1016/S0305-0548(03)00163-1
Sabuncuoglu, 1992, Experimental investigation of FMS machine and AGV scheduling rules against the mean flow-time criterion, International Journal of Production Research, 1617, 10.1080/00207549208948110
Yamashita, 2001, Analysis of dispatching rules of AGV systems with multiple vehicles, IIE Transactions, 889, 10.1080/07408170108936881
Bozer, 2005, Throughput performance analysis and machine layout for discrete-space closed-loop conveyors, IIE Transactions, 77, 10.1080/07408170590516971
Egbelu, 1984, Characterization of automatic guided vehicle dispatching rules, International Journal of Production Research, 22, 359, 10.1080/00207548408942459
Koo, 2005, Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first, International Journal of Flexible Manufacturing System, 23, 10.1007/s10696-005-5992-6
Liao, 2006, Differentiated preempitive dispatching for automated material handling services in 300mm semiconductor foundry, The International Journal of Advanced Manufacturing Technology, 29, 890, 10.1007/s00170-005-2610-4
Tyan, 2004, Multiple response optimization in a fully automated FAB: an integrated tool and vehicle dispatching strategy, Computers and Industrial Engineering, 46, 121, 10.1016/j.cie.2003.11.003
Chen, 2000, Petri-net and GA based approach to modeling, scheduling, and performance evaluation for wafer fabrication, 3403
Baranyi, 2003, From differential equations to PDC controller design via numerical transformation, Computers in Industry, 51, 281, 10.1016/S0166-3615(03)00058-7
Bozdag, 2003, Fuzzy group decision making for selection among computer integrated manufacturing systems, Computers in Industry, 51, 13, 10.1016/S0166-3615(03)00029-0
Jang, 2001, An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines, International Journal of Flexible Manufacturing System, 39, 3901
Filip, 1985, Multilevel optimization algorithms in computer aided production control in process industry, Computers in Industry, 6, 47, 10.1016/0166-3615(85)90069-7
Goldberg, 1989
Osman, 1993, Metastrategy simulated annealing and tabu search algorithms for the vehicle routing problem, Annuals of Operations Research, 41, 421, 10.1007/BF02023004
Funke, 2005, Local search for vehicle routing and scheduling problems: review and conceptual integration, Journal of Heuristics, 11, 267, 10.1007/s10732-005-1997-2
Wang, 2007, Agent-based interbay system control for a single-loop semiconductor manufacturing fab, Production Planning and Control, 18, 74, 10.1080/09537280600909437
Wu, 2011, An adaptive multi-parameter based dispatching strategy for single-loop interbay material handling systems, Computers in Industry, 62, 175, 10.1016/j.compind.2010.10.010
Kim, 2009, Effective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor FAB, International Journal of Production Research, 47, 2823, 10.1080/00207540701491090
Egbelu, 1984, Characterization of automatic guided vehicle dispatching rules, International Journal of Production Research, 22, 359, 10.1080/00207548408942459
Bartholdi, 1989, Decentralized control of automated guided vehicles on a simple loop, IIE Transactions, 21, 76, 10.1080/07408178908966209