Multi-criteria sequence-dependent job shop scheduling using genetic algorithms
Tài liệu tham khảo
Adams, 1988, The shifting bottleneck procedure for job shop scheduling, Management Science, 34, 391, 10.1287/mnsc.34.3.391
Brucker, 1994, A branch and bound algorithm for the job shop scheduling problem, Discrete Applied Mathematics, 49, 109, 10.1016/0166-218X(94)90204-6
Cai, K. W., Wu, Q. H., & Yong, Z. Z. (2000). A genetic algorithm with local search for solving problems. Real-world applications of evolutionary computing, EvoWorkshops 2000, Edinburgh, Scotland, UK, Springer-Verlag.
Candido, 1998, A genetic algorithm based procedure for more realistic job shop scheduling problems, International Journal of Production Resources, 36, 3437, 10.1080/002075498192148
Chang, 1996, Ranking dispatching rules by data envelopment analysis in a job shop environment, IIE Transactions, 28, 631, 10.1080/15458830.1996.11770708
Della Croce, 1995, A genetic algorithm for the job shop problem, Computers & Operations Research, 22, 15, 10.1016/0305-0548(93)E0015-L
ElMaraghy, 2000, Scheduling of manufacturing systems under dual-resource constraints using genetic algorithms, Journal of Manufacturing Systems, 19, 186, 10.1016/S0278-6125(00)80011-4
Falkenauer, E., & Bouffouix, S. (1991). A genetic algorithm for job shop. In Proceedings of the IEEE international conference on robotics and automation, Sacramento, CA.
Fulya, 2006, A genetic algorithm approach for multi-objective optimization of supply chain networks, Computers & Industrial Engineering, 51, 196, 10.1016/j.cie.2006.07.011
Giffler, 1960, Algorithms for solving production scheduling problems, Operations Research, 8, 487, 10.1287/opre.8.4.487
Goldberg, 1989
Gupta, 1986, Flowshop schedules with sequence dependent setup times, Journal of Operations Research Society of Japan, 29, 206, 10.15807/jorsj.29.206
Holland, 1975
Jain, 1999, Deterministic job shop scheduling: Past, present and future, European Journal of Operational Research, 113, 390, 10.1016/S0377-2217(98)00113-1
Java Developers Journal webpage. (2007). An Introduction to Genetic Algorithms in Java (Harnessing the power of evolution’s optimization algorithm), retrieved 1/20/2007. Available from <http://www2.sys-con.com/ITSG/virtualcd/Java/archives/0603/lacy/index.html/>.
Kochhar, 1987, Heuristic methods for flexible flow line scheduling, Journal of Manufacturing Systems, 6, 299, 10.1016/0278-6125(87)90006-9
Manikas, A., & Chang, Y. L. (2005). Using a genetic algorithm to solve the sequence dependent job shop scheduling problem. In Proceedings of INFORMS SE 2005, Myrtle Beach, South Carolina.
Marian, 2006, A genetic algorithm for the optimization of assembly sequences, Computers & Industrial Engineering, 50, 503, 10.1016/j.cie.2005.07.007
Miller, 1999, A hybrid genetic algorithm for the single machine scheduling problem, Journal of Heuristics, 5, 437, 10.1023/A:1009684406579
Mitchell, 1996
Nowicki, 1996, A fast taboo search algorithm for the job shop problem, Management Science, 42, 797, 10.1287/mnsc.42.6.797
Osman, 1989, Simulated annealing for permutation flow-shop scheduling, Omega, 17, 551, 10.1016/0305-0483(89)90059-5
Park, 2003, A hybrid genetic algorithm for the job shop scheduling problems, Computers & Industrial Engineering, 45, 597, 10.1016/S0360-8352(03)00077-9
Phadke, 1989
Pinedo, 2002
Pinedo, 2005
Reeves, 1995, A genetic algorithm for flowshop sequencing, Computers and Operations Research, 22, 5, 10.1016/0305-0548(93)E0014-K
Richter, H. (2002). An evolutionary algorithm for controlling chaos: The use of multi-objective fitness functions. In Proceedings of the 7th international conference on parallel problem solving from nature (vol. 2439, pp. 308–320).
Rios-Mercado, 1999, A branch-and-bound algorithm for permutation flow shops with sequence-dependent setup times, IIE Transactions, 31, 721, 10.1080/07408179908969871
Ruiz, 2005, Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics, European Journal of Operational Research, 165, 34, 10.1016/j.ejor.2004.01.022
Schutten, 1998, Practical job shop scheduling, Annals of Operations Research, 83, 161, 10.1023/A:1018955929512
Sun, 1999, An approach to job shop scheduling with sequence-dependent setups, Journal of Manufacturing Systems, 18, 416, 10.1016/S0278-6125(00)87643-8
Taguchi, G., & Wu, Y.-I. (1979). Introduction to off-line quality control. Central Japan Quality Control Association, Meieki Nakamura-Ku Magaya, Japan.