Model for reservoir operations during periods of high flow
Tóm tắt
Từ khóa
Tài liệu tham khảo
Bahvalov, N. S., 1987,Numerical Methods, Mir Publishers, Moscow.
Gillett, Billy E., 1976,Introduction to Operation Research, McGraw-Hill, New York.
Colorado State University,DYNPRO (Discrete dynamic programming)-Computer Program Users Manual, Fort Collins.
Davis, D. W. and Buckley, J. J., 1984, Output increase from existing hydroelectric plants,ASCE ? J. Water Resour. Planning and Management Division 110, 361?372.
Energoinvest, 1976, Project of HE Visegrad, Sarajevo (in Croatian).
Fakultet Grandjevinski Znanosti, 1983, Study of City Gorazde flood protection, Split (in Croatian).
Margeta, J., 1985, Storage basin level as a measure for controlling upstream flooding,2nd Intern. Conf. The Hydraulics of Flood and Flood Control, Cambridge, England, 24?26 September, pp. A2. 17?28.
Marino, M. A., and Mohammadi, B., 1983, Reservoir operation by linear and dynamic programming,ASCE ? J. Water Resour. Planning and Management Division,109, No. 4.
Shantikumar, J. G. and Sargent, R. G.,e 1983, A unifying view of hybrid simulation/analytic models and modelling,Oper. Res. 31, 1030?1052.
Toebs, G. H. and Sheppard, A. A., 1979,ASCE ? Proc. National Workshop on Reservoir Systems Operation, University of Colorado, Boulder, August 1979.
Yeh, W., 1985, Reservoir management and operations models: a state of the art review,Water Resour. Res. 21 (12), 1797?1818.
Yeh, W., Becker, G. L. and Chu, W. S., 1979, Real-time hourly reservoir operation,ASCE ? J. Water Resour. Planning and Management Division.105, 187?203.