Mitigating train-type heterogeneity on a single-track line

Mark H. Dingler1, Yung-Cheng Lai2, Christopher P. L. Barkan3
1CSX Transportation, Jacksonville, FL, USA
2Department of Civil Engineering, National Taiwan University, Taiwan
3Department of Civil and Environmental Engineering, University of Illinois at Urbana- Champaign, USA

Tóm tắt

North American railroads are experiencing growth in traffic demand and increasingly need to expand capacity on their lines; this will require changes in the mode of operation and infrastructure. Infrastructure expansion requires long lead times and is capital-intensive. Alternatively, some additional capacity may be achieved by alteration of the mode of operation which is often less expensive and faster to implement. In this paper dispatch simulation software was used to analyze a model of a single-track signalized line with characteristics typical of a North American railroad subdivision. The objective was to determine the effects of various operational and infrastructure changes in terms of reducing train delay. For each scenario a reduction in the delay was considered to be a benefit of the project, while any increases in delay, additional locomotives, increased fuel consumption, increased track maintenance costs and additional infrastructure were considered the expenses of the project. A cost–benefit analysis was conducted in order to determine which operational or infrastructure changes are the most cost-effective for each scenario.

Từ khóa


Tài liệu tham khảo

Cambridge Systematics, 2007, National rail freight infrastructure capacity and investment study

American Association of State Highway and Transportation Officials, 2007, Transportation - invest in our future: America's freight challenge

10.3141/2117-05

10.3141/2117-06

Bronzini MS, 1985, Trib Transp, 2, 5

Pachl J, 2002, Railroad operating and control

UIC Code 406: 2004. Capacity.

10.1016/j.tre.2007.04.001

Transportation Research Board, 2002, Proceedings from transportation research board workshop on railroad capacity and corridor planning

Schafer D and Barkan CPL. A prediction model for broken rails and an analysis of their economic impact, In: The AREMA annual conference, Salt Lake City, UT, 21-24 September 2008. Available at: http://www.arema.org/proceedings/index.aspx.

Zarembski AM, Resor R and Cikota J. Technical monograph: estimating maintenance costs for mixed high-speed passenger and freight rail corridors. Unpublished report, FRA, Washington, DC, 2004.

Murray T, 2008, Trains Mag, 67, 34

Railway Age. Locomotive leasing: what’s power worth today? Railway Age, June 2008, pp. 40–43.

Association of American Railroads, 2008, Analysis of class I railroads

Dingler MH, Koenig A, Sogin S and Barkan CPL. Determining the causes of train delay. In: The AREMA annual conference, Orlando, FL, 29 August-1 September, 2010. Available at: http://www.arema.org/proceedings/index.aspx.

Dingler MH. The impact of operational strategies and new technologies on railroad capacity. Masters Thesis, University of Illinois, Urbana, IL, 2010.

Krueger H. Parametric modeling in rail capacity planning. In: Farrington PA (ed.) The winter simulation conference, Phoenix, AZ, 5-8 December 1999, pp. 1194–1200. The University of Michigan: IEEE.