Minimizing makespan in hybrid flowshops
Tóm tắt
Từ khóa
Tài liệu tham khảo
Afentakis, 1986, Maximum throughput in flexible manufacturing systems, 509
Baker, 1974
Buten, 1973, A scheduling model for computer systems with two classes of processors, 130
Cheng, 1990, A state-of-the-art review of parallel-machine scheduling research, European J. Oper. Res., 47, 271, 10.1016/0377-2217(90)90215-W
Erschler, 1985, Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints, Ann. Oper. Res., 3, 333, 10.1007/BF02023748
Garey, 1979
Ghosh, 1992, Routing flexibility and production scheduling in a flexible manufacturing environment, European J. Oper. Res., 60, 344, 10.1016/0377-2217(92)90086-O
Gonzalez, 1978, Flowshop and jobshop schedules; complexity and approximation, Oper. Res., 26, 36, 10.1287/opre.26.1.36
Graham, 1966, Bounds for certain multiprocessing anomalies, Bell System Tech. J., 45, 1563, 10.1002/j.1538-7305.1966.tb01709.x
Gupta, 1988, Two stage hybrid flowshop scheduling problem, J. Oper. Res. Soc., 39, 359, 10.1057/jors.1988.63
Gupta, 1991, Schedules for a two stage hybrid flowshop with parallel machines at the second stage, Internat. J. Prod. Res., 29, 1489, 10.1080/00207549108948025
Herrmann, 1992, Three-machine look-ahead scheduling problems
Johnson, 1954, Optimal two and three-stage production schedules with setup times included, Naval Res. Logistics Quart., 1, 61, 10.1002/nav.3800010110
P. Kouvelis and G. Vairaktarakis, “A class of two stage flexible flowshops and their performance comparison to traditional flowshops and parallel machine environments”, submitted to: Management Sci.
Langston, 1987, Interstage transportation planning in the deterministic flow-shop environment, Oper. Res., 35, 556, 10.1287/opre.35.4.556
Lee, 1993, Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem, Management Sci., 39, 616, 10.1287/mnsc.39.5.616
Lee, 1993, A three-machine scheduling problem with look-behind characteristics
Lee, 1993, Design for schedulability: look-behind and look-ahead flowshops
Luggen, 1991
Maleki, 1991
Narasimhan, 1984, Scheduling in a two-stage manufacturing process, Internat. J. Prod. Res., 22, 555, 10.1080/00207548408942479
Paul, 1979, A production scheduling problem in the glass-container industry, Oper. Res., 22, 290, 10.1287/opre.27.2.290
Rao, 1970, Sequencing in the order A,B with multiplicity of machines for a single operation, Opsearch, 7, 135
Shanker, 1985, A loading and dispatching problem in a random flexible manufacturing system, Internat. J. Prod. Res., 23, 579, 10.1080/00207548508904730
Shriskandarajah, 1986, Some no-wait shops scheduling problems, European J. Oper. Res., 24, 424, 10.1016/0377-2217(86)90036-6
Shriskandarajah, 1989, Scheduling algorithms for flexible flowshops: worst and average case performance, European J. Oper. Res., 43, 143, 10.1016/0377-2217(89)90208-7
Stecke, 1985, Design, planning, scheduling and control problems of flexible manufacturing systems, Ann. Oper. Res., 3, 3, 10.1007/BF02023765
Stecke, 1992, Planning and scheduling approaches to operate a particular FMS, European J. Oper. Res., 61, 273, 10.1016/0377-2217(92)90357-F