Minimizing makespan in hybrid flowshops

Operations Research Letters - Tập 16 Số 3 - Trang 149-158 - 1994
Chung‐Yee Lee1, George Vairaktarakis1
1Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL 32611, USA

Tóm tắt

Từ khóa


Tài liệu tham khảo

Afentakis, 1986, Maximum throughput in flexible manufacturing systems, 509

Baker, 1974

Buten, 1973, A scheduling model for computer systems with two classes of processors, 130

Cheng, 1990, A state-of-the-art review of parallel-machine scheduling research, European J. Oper. Res., 47, 271, 10.1016/0377-2217(90)90215-W

Erschler, 1985, Steady state scheduling of a flexible manufacturing system with periodic releasing and flow time constraints, Ann. Oper. Res., 3, 333, 10.1007/BF02023748

Garey, 1979

Ghosh, 1992, Routing flexibility and production scheduling in a flexible manufacturing environment, European J. Oper. Res., 60, 344, 10.1016/0377-2217(92)90086-O

Gonzalez, 1978, Flowshop and jobshop schedules; complexity and approximation, Oper. Res., 26, 36, 10.1287/opre.26.1.36

Graham, 1966, Bounds for certain multiprocessing anomalies, Bell System Tech. J., 45, 1563, 10.1002/j.1538-7305.1966.tb01709.x

Gupta, 1988, Two stage hybrid flowshop scheduling problem, J. Oper. Res. Soc., 39, 359, 10.1057/jors.1988.63

Gupta, 1991, Schedules for a two stage hybrid flowshop with parallel machines at the second stage, Internat. J. Prod. Res., 29, 1489, 10.1080/00207549108948025

Herrmann, 1992, Three-machine look-ahead scheduling problems

Johnson, 1954, Optimal two and three-stage production schedules with setup times included, Naval Res. Logistics Quart., 1, 61, 10.1002/nav.3800010110

P. Kouvelis and G. Vairaktarakis, “A class of two stage flexible flowshops and their performance comparison to traditional flowshops and parallel machine environments”, submitted to: Management Sci.

Langston, 1987, Interstage transportation planning in the deterministic flow-shop environment, Oper. Res., 35, 556, 10.1287/opre.35.4.556

Lee, 1993, Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem, Management Sci., 39, 616, 10.1287/mnsc.39.5.616

Lee, 1993, A three-machine scheduling problem with look-behind characteristics

Lee, 1993, Design for schedulability: look-behind and look-ahead flowshops

Luggen, 1991

Maleki, 1991

Narasimhan, 1984, Scheduling in a two-stage manufacturing process, Internat. J. Prod. Res., 22, 555, 10.1080/00207548408942479

Paul, 1979, A production scheduling problem in the glass-container industry, Oper. Res., 22, 290, 10.1287/opre.27.2.290

Rao, 1970, Sequencing in the order A,B with multiplicity of machines for a single operation, Opsearch, 7, 135

Shanker, 1985, A loading and dispatching problem in a random flexible manufacturing system, Internat. J. Prod. Res., 23, 579, 10.1080/00207548508904730

Shriskandarajah, 1986, Some no-wait shops scheduling problems, European J. Oper. Res., 24, 424, 10.1016/0377-2217(86)90036-6

Shriskandarajah, 1989, Scheduling algorithms for flexible flowshops: worst and average case performance, European J. Oper. Res., 43, 143, 10.1016/0377-2217(89)90208-7

Stecke, 1985, Design, planning, scheduling and control problems of flexible manufacturing systems, Ann. Oper. Res., 3, 3, 10.1007/BF02023765

Stecke, 1992, Planning and scheduling approaches to operate a particular FMS, European J. Oper. Res., 61, 273, 10.1016/0377-2217(92)90357-F

Wittrock, 1988, An adaptable scheduling algorithm for flexible flow lines, Oper. Res., 36, 445, 10.1287/opre.36.3.445