Methodology for Automating the Identification and Localization of Construction Components on Industrial Projects

Journal of Computing in Civil Engineering - Tập 23 Số 1 - Trang 3-13 - 2009
David Grau1,2, Carlos Caldas1,2
1Assistant Professor, Dept. of Civil, Architectural, and Environmental Engineering, The Univ. of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0273.
2Ph.D. Candidate, Dept. of Civil, Architectural, and Environmental Engineering, The Univ. of Texas at Austin, 1 University Station C1752, Austin, TX 78712-0273.

Tóm tắt

Từ khóa


Tài liệu tham khảo

Akinci B. Patton M. and Ergen E. (2002). “Utilizing radio-frequency identification on precast concrete components—Supplier’s perspective.” Proc. 19th Int. Symp. on Automation and Robotics in Construction National Institute of Standards and Technology Gaithersburg Md. 381–386.

10.1061/(ASCE)0733-9364(1987)113:2(222)

Borcherding J. D. and Sebastian S. J. (1980). “Major factors influencing craft productivity in nuclear power plant construction.” Proc. American Association of Cost Engineers Paper I.1 American Association of Cost Engineers Morgantown W.Va.

10.1109/98.878533

10.1061/(ASCE)0733-9364(2006)132:7(741)

Caron F. Navabzadeh Razavi S. Song J. Vanheeghe P. Duflos E. Caldas C. H. and Haas C. T. (2006). “Models for locating RFID nodes.” Proc. Joint Int. Conf. on Computing and Decision Making in Civil and Building Engineering Montréal.

Construction Industry Institute (CII). (1986). “Costs and benefits of materials management systems.” The Construction Industry Research Summary 7-1 CII Austin Tex.

Echeverry D. and Beltran A. (1997). “Bar-code control of construction field personnel and construction materials.” Proc. 4th Congress on Computing in Civil Engineering Philadelphia Pa. 341–347.

10.1061/(ASCE)0887-3801(2007)21:1(11)

10.1016/j.autcon.2006.07.004

Evans R. E., 1999, Improve your construction, ABC Today, 8, 8

Furlani K. M. Stone W. C. Cheok G. S. and Gilsinn D. (2001). “Object identification using bar codes based on LADAR intensity.” Proc. 18th Int. Symp. on Automation and Robotics in Construction Krakow Poland 103–108.

Gareth V. W. Vorster M. C. Powers R. Fecht W. L. and Chesi R. W. (2003). “Technology needs assessment.” Research Summary RS173-1 Construction Industry Institute Austin Tex.

Grau Torrent D. and Caldas C. H. (2006). “Proactive field materials management using integrated location and identification sensing technologies.” Proc. Joint Int. Conf. on Computing and Decision Making in Civil and Building Engineering Montréal.

Grau Torrent D. and Caldas C. H. (2007). “Field experiments of an automated materials identification and localization model.” Proc. Computing in Civil Engineering Conf. Reston Va. 689–696.

He T. Huang C. Blum B. M. Stankovic J. A. and Abdelzaher T. (2003). “Range-free localization schemes for large-scale sensor networks.” Proc. 9th Annual Int. Conf. on Mobile Computing and Networking San Diego 81–95.

10.1061/(ASCE)0733-9364(1995)121:2(189)

10.1061/(ASCE)0733-9364(2003)129:6(680)

10.1016/S0926-5805(99)00028-X

10.1061/(ASCE)0742-597X(1999)15:1(30)

10.1061/(ASCE)0733-947X(1992)118:4(517)

10.1080/01446190500435671

10.1023/A:1023403323460

O’Brien K., 1989, Planning has merit, Electr. Contract., 54

Plemmons J. K. (1995). “Materials management process effectiveness measures and benchmarking in the industrial construction industry.” Ph.D. thesis Clemson Univ. Clemson S.C.

10.1061/(ASCE)0742-597X(2003)19:2(78)

10.1061/(ASCE)0887-3801(2003)17:1(19)

Sichitu M. L. and Ramadurai V. (2004). “Localization of wireless sensor networks with a mobile beacon.” Proc. IEEE Int. Conf. on Mobile Ad Hoc and Sensor Systems Fort Lauderdale Fla.

Simic S. N. and Sastry S. (2002). “Distributed localization in wireless ad hoc networks.” Technical Rep. UCB/ERL M02/26 Dept. of Electrical Engineering and Computer Sciences Univ. of California at Berkeley Berkeley Calif.

10.1061/(ASCE)0733-9364(2006)132:9(911)

10.1016/j.autcon.2005.03.001

10.1109/TVT.2005.844642

Stone W. C. (1995). “Real-time GPS and non-line-of-sight metrology.” Proc. NIST Construction Automation Workshop Paper 1.5 National Institute of Standards and Technology Gaithersburg Md. 29–41.

Su Y. Y. and Liu L. Y. (2007). “Real-time tracking and analysis of construction operations.” Proc. Construction Research Congress Bahamas.

10.1061/(ASCE)0733-9364(2005)131:7(808)

10.1061/(ASCE)0733-9364(1989)115:3(370)

Vorster M. C. and Lucko G. (2002). “Construction technology needs assessment update.” Research Rep. 173-11 Construction Industry Institute Austin Tex.