Lot sizing and quality investment with quality cost analyses for imperfect production and inspection processes with commercial return
Tài liệu tham khảo
Affisco, 2002, Quality improvement and setup reduction in the joint economic lot size model, European Journal of Operational Research, 142, 497, 10.1016/S0377-2217(01)00308-3
Agnihothri, 2000, Lot sizing with random yields and tardiness costs, Computers and Operations Research, 27, 437, 10.1016/S0305-0548(99)00062-3
Anily, 1995, Single-machine lot-sizing with uniform yields and rigid demands: robustness of the optimal solution, IIE Transactions, 27, 625, 10.1080/07408179508936778
Blackburn, 2004, Reverse supply chains for commercial returns, California Management Review, 46, 6, 10.2307/41166207
Cheng, 1989, An economic production quantity model with flexibility and reliability considerations, European Journal of Operational Research, 39, 174, 10.1016/0377-2217(89)90190-2
Cheng, 1991, An economic order quantity model with demand-dependent unit production cost and imperfect production process, IIE Transactions, 23, 23, 10.1080/07408179108963838
Cheng, 1991, EPQ with process capability and quality assurance considerations, Journal of the Operational Research Society, 42, 713, 10.1057/jors.1991.137
Chiu, 2007, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns, European Journal of Operational Research, 180, 664, 10.1016/j.ejor.2006.05.005
Cyber Atlas, 2000. BizRate Study. In: RLEC (Reverse Logistics Executive Council), 2000. E-Commerce Survey Study. RLEC, Chicago (〈http://www.rlec.org/〉 accessed 13 August 2006).
Deming, 1982
Dobos, 2004, An extended production/recycling model with stationary demand and return rates, International Journal of Production Economics, 90, 311, 10.1016/j.ijpe.2003.09.007
Dobos, 2006, A production/recycling model with quality consideration, International Journal of Production Economics, 104, 571, 10.1016/j.ijpe.2005.09.006
Elhafsi, 2002, A production planning model for an unreliable production facility: case of finite horizon and single demand, European Journal of Operational Research, 143, 94, 10.1016/S0377-2217(01)00326-5
Grosfeld-Nir, 2005, A two-bottleneck system with binomial yields and rigid demand, European Journal of Operational Research, 165, 231, 10.1016/j.ejor.2003.06.044
Grosfeld-Nir, 2006, Lot-sizing two-echelon assembly systems with random yields and rigid demand, European Journal of Operational Research, 173, 600, 10.1016/j.ejor.2005.01.033
Guu, 2003, The finite multiple lot sizing problem with interrupted geometric yield and holding costs, European Journal of Operational Research, 145, 635, 10.1016/S0377-2217(02)00217-5
Juran, 1988
Juran, 1998
Kim, 2001, Optimal production run length and inspection schedules in a deteriorating production process, IIE Transactions, 33, 421, 10.1080/07408170108936840
Koh, 2002, An optimal ordering and recovery policy for reusable items, Computers and Industrial Engineering, 43, 59, 10.1016/S0360-8352(02)00062-1
Krikke, 2004, Product modularity and the design of closed-loop supply chains, California Management Review, 46, 23, 10.2307/41166208
Lee, 1987, Simultaneous determination of production cycle and inspection schedules in a production system, Management Science, 33, 1125, 10.1287/mnsc.33.9.1125
Lee, 1989, A production and maintenance planning model with restoration cost dependent on detection delay, IIE Transactions, 21, 368, 10.1080/07408178908966243
Lee, 1991, Joint determination of production cycle and inspection intervals in a deteriorating production, Journal of the Operational Research Society, 42, 775, 10.1057/jors.1991.148
Lee, 1996, Optimal demand rate, lot sizing and process reliability improvement decisions, IIE Transactions, 28, 941, 10.1080/15458830.1996.11770747
Leung, 2007, A generalized geometric-programming solution to “An economic production quantity model with flexibility and reliability considerations”, European Journal of Operational Research, 176, 240, 10.1016/j.ejor.2005.06.049
Liou, 1994, The effects of inspection errors to the imperfect EMQ model, IIE Transactions, 26, 42, 10.1080/07408179408966595
Otake, 2001, Inventory and investment in quality improvement under return on investment maximization, Computers and Operations Research, 28, 997, 10.1016/S0305-0548(00)00022-8
Ouyang, 2002, Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process, Computers and Operations Research, 29, 1701, 10.1016/S0305-0548(01)00051-X
Porteus, 1986, Optimal lot sizing, process quality improvement and setup cost reduction, Operations Research, 34, 137, 10.1287/opre.34.1.137
Rahim, 1994, Joint determination of production quantity, inspection schedule and control chart design, IIE Transactions, 26, 2, 10.1080/07408179408966632
Rahim, 2001, Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products, Journal of the Operational Research Society, 52, 1370, 10.1057/palgrave.jors.2601238
Reverse Logistics Executive Council, 1999
Richter, 1996, The extended EOQ repair and waste disposal model, International Journal of Production Economics, 45, 443, 10.1016/0925-5273(95)00143-3
Richter, 1996, The EOQ repair and waste disposal model with variable setup numbers, European Journal of Operational Research, 95, 313, 10.1016/0377-2217(95)00276-6
Rosenblatt, 1986, Economic production cycles with imperfect production processes, IIE Transactions, 18, 48, 10.1080/07408178608975329
Salameh, 2000, Economic production quantity model for items with imperfect quality, International Journal of Production Economics, 64, 59, 10.1016/S0925-5273(99)00044-4
Schrady, 1967, A deterministic inventory model for repairable items, Naval Research Logistics Quarterly, 14, 391, 10.1002/nav.3800140310
Schwaller, 1988, EOQ under inspection costs, Production and Inventory Management, 29, 22
Stock, 2002, Many happy (product) returns, Harvard Business Review, 80, 16
Teunter, 2001, Economic ordering quantities for recoverable item inventory systems, Naval Research Logistics Quarterly, 48, 484, 10.1002/nav.1030
Tripathy, 2003, An EOQ model with process reliability considerations, Journal of the Operational Research Society, 54, 549, 10.1057/palgrave.jors.2601540
Vickson, 1998, Optimal inspection sublots for deteriorating batch production, IIE Transactions, 30, 1019, 10.1080/07408179808966558
Wang, 2001, Simultaneous determination of the optimal production–inventory and product inspection policies for a deteriorating production system, Computers and Operations Research, 28, 1093, 10.1016/S0305-0548(00)00030-7
Wang, 2003, Determining the optimal production–maintenance policy with inspection errors: using a Markov chain, Computers and Operations Research, 30, 1, 10.1016/S0305-0548(01)00073-9
Yano, 1995, Lot sizing with random yields: a review, Operations Research, 43, 311, 10.1287/opre.43.2.311
Yeh, 2006, Optimal lot size and inspection policy for products with warranty, European Journal of Operational Research, 174, 766, 10.1016/j.ejor.2005.02.049
Yoo, 2009, Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return, International Journal of Production Economics, 121, 255, 10.1016/j.ijpe.2009.05.008
Yoo, 2012, Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment, Computers and Operations Research, 39, 2001, 10.1016/j.cor.2011.09.015
Zhang, 1990, Joint lot sizing and inspection policy in an EOQ model with random yield, IIE Transactions, 22, 41, 10.1080/07408179008964156