Linear scheduling: past research efforts and future directions

Emerald - 1998
KRIS G.MATTILA1, DULCY M.ABRAHAM2
1Department of Civil and Environmental Engineering, Michigan Technological University, 112 Dillman Hall, 1400 Townsend Drive, Houghton, MI 49931–1295, USA
2School of Civil Engineering, Purdue University, 1294 Civil Engineering Building, West Lafayette, IN 47907–1294, USA

Tóm tắt

Since the early 1960s, there have been different techniques to schedule linear projects, but for the most part, these have been overshadowed by the critical path method (CPM). Recently, there has been renewed interest in linear scheduling and in adapting some of the CPM techniques to linear scheduling. This necessitates a review of the research in the area of linear scheduling. The present paper provides an overview of linear scheduling, discusses the different approaches that have been used and expresses new avenues for research in the area of resource levelling of linear schedules.

Từ khóa


Tài liệu tham khảo

10.1061/(ASCE)0733-9364(1990)116:4(689)

Antill J.M., 1990, Critical Path Methods in Construction Practice

10.1061/(ASCE)0733-9364(1986)112:3(411)

Ashley D.B., 1980, Journal of the Construction Division, ASCE, 106 (CO2), 4, 1

Associated General Contractors, 1993, Constructor, 7

Bafna T., 1991, Department of Civil Engineering

Barrie D.S., 1978, Professional Construction Management

Birrell G.S., 1980, Journal of the Construction Division, ASCE, 106 (CO3), 389, 10.1061/JCCEAZ.0000905

Callahan M.T., 1992, Construction Project Scheduling

Carr R.I., 1974, Journal of the Construction Division, ASCE, 100 (CO3), 403, 10.1061/JCCEAZ.0000444

10.1061/(ASCE)0733-9364(1986)112:4(476)

Clough R.H., 1979, Construction Project Management, 2

10.1061/(ASCE)0733-9364(1991)117:4(579)

Dressier J., 1974, Journal of the Construction Division, ASCE, 100 (CO4), 571, 10.1061/JCCEAZ.0000460

Dubey A., 1993, Department of Civil Engineering

10.1061/(ASCE)0733-9364(1989)115:2(302)

Finck N.E., 1965, Systems and Procedures Journal, 16, 8

Gehringer A.C., 1958, Navy Management Review, IV (3), P-910.

Gorman J.E., 1972, Roads and Streets, 115, 74

Halpin D.W., 1990, MicroCYCLONE System Manual. Division of Construction Engineering and Management

Halpin D.W., 1992, Planning and Analysis of Construction Operations

Harmelink, D.J. (19.95) Linear scheduling model: the development of a linear scheduling mode! with micro computer applications for highway construction control. Ph.D. thesis,Iowa State University, Ames, LA.

Harris R.B., 1978, Precedence and Arrow Networking Techniques for Construction

10.1061/(ASCE)0733-9364(1990)116:2(331)

Harris R.B., 1996, Scheduling Projects with Repeating Activities. UMCEE Report No. 96-26, Civil and Environmental Engineering Department

Herbsman Z.J., 1987, Transportation Research Record, 1126, 110

Huang R., Proceedings of Equipment Resource Management into the 21st Century, ASCE, Nashville, T N , (ed. S.L. Weber), 148

Johnston D.W., 1981, Journal of the Construction Division, ASCE, 107 (CO2), 247, 10.1061/JCCEAZ.0000960

Khisty C.J., 1970, Indian Concrete Journal

Levine H.A., Proceedings of the Fifth Internet Congress, Project Implementation and Management: Bridging the Gap, N C C Publications, 251

Lumsden P., 1968, The Line-of Balance Method

Lutz, J.D. (1990) Planning of linear construction projects using simulation and line of balance. Ph.D. Thesis,Purdue University, West Lafayette, IA.

Miller R.W., 1963, Schedule, Cost, and Profit Control with PERT

O'Brien J.J., 1969, Scheduling Handbook

O'Brien J.J., 1975, Journal of the Construction Division, ASCE, 101 (CO4), 895, 10.1061/JCCEAZ.0000569

Office, 1961, Navy Management Review, VI (2), P-910.

Office, 1962, NAVEXOS P1853, Department of the Navy

Peer S., 1974, Journal of the Construction Division, ASCE, 100 (CO3), 2, 3

10.1061/(ASCE)0733-9364(1983)109:1(102)

10.1061/(ASCE)0733-9364(1990)116:2(316)

Russell A.D., Proceedings of the Building Economics and Construction Management Conference, Conseil Internation du Batiment, 405

10.1061/(ASCE)0733-9364(1988)114:1(36)

Russell A., Proceedings, Second Congress, Computing in Civil Engineering, ASCE, ASCE, Nashville, T N , (ed. J.P. Mohsen), 1134

10.1061/(ASCE)0733-9364(1993)119:2(196)

Schrage L., 1991, User's Manual for Linear, Integer, and Quadratic Programming with UNDO

Selinger S., 1980, Journal of the Construction Division, ASCE, 106 (CO2), 195, 10.1061/JCCEAZ.0000877

Stradal O., 1982, Journal of the Construction Division, ASCE, 108 (CO3), 445, 10.1061/JCCEAZ.0001056

Suh, K. (1993) RUSS: a scheduling system for repetitive-unit construction using line-of-balance technology. Ph.D. Thesis,Illinois Institute of Technology, Chicago, IL.

10.1061/(ASCE)0733-9364(1994)120:3(667)

10.1061/(ASCE)9742-597X(1990)6:3(282)

10.1061/(ASCE)0733-9364(1994)120:1(96)

United States Army Command, 1968, United States Army Command

10.1061/(ASCE)0733-9364(1992)118:1(210.2)

Vorster M ., 1992, Transportation Research Record, 1351, 32

Vorster M.C., 1990, Linear Scheduling for Highway Contractors and State DOT's