Linear scheduling: past research efforts and future directions
Tóm tắt
Từ khóa
Tài liệu tham khảo
Antill J.M., 1990, Critical Path Methods in Construction Practice
Ashley D.B., 1980, Journal of the Construction Division, ASCE, 106 (CO2), 4, 1
Associated General Contractors, 1993, Constructor, 7
Bafna T., 1991, Department of Civil Engineering
Barrie D.S., 1978, Professional Construction Management
Birrell G.S., 1980, Journal of the Construction Division, ASCE, 106 (CO3), 389, 10.1061/JCCEAZ.0000905
Callahan M.T., 1992, Construction Project Scheduling
Clough R.H., 1979, Construction Project Management, 2
Dressier J., 1974, Journal of the Construction Division, ASCE, 100 (CO4), 571, 10.1061/JCCEAZ.0000460
Dubey A., 1993, Department of Civil Engineering
Finck N.E., 1965, Systems and Procedures Journal, 16, 8
Gehringer A.C., 1958, Navy Management Review, IV (3), P-910.
Gorman J.E., 1972, Roads and Streets, 115, 74
Halpin D.W., 1990, MicroCYCLONE System Manual. Division of Construction Engineering and Management
Halpin D.W., 1992, Planning and Analysis of Construction Operations
Harmelink, D.J. (19.95) Linear scheduling model: the development of a linear scheduling mode! with micro computer applications for highway construction control. Ph.D. thesis,Iowa State University, Ames, LA.
Harris R.B., 1978, Precedence and Arrow Networking Techniques for Construction
Harris R.B., 1996, Scheduling Projects with Repeating Activities. UMCEE Report No. 96-26, Civil and Environmental Engineering Department
Herbsman Z.J., 1987, Transportation Research Record, 1126, 110
Huang R., Proceedings of Equipment Resource Management into the 21st Century, ASCE, Nashville, T N , (ed. S.L. Weber), 148
Johnston D.W., 1981, Journal of the Construction Division, ASCE, 107 (CO2), 247, 10.1061/JCCEAZ.0000960
Khisty C.J., 1970, Indian Concrete Journal
Levine H.A., Proceedings of the Fifth Internet Congress, Project Implementation and Management: Bridging the Gap, N C C Publications, 251
Lumsden P., 1968, The Line-of Balance Method
Lutz, J.D. (1990) Planning of linear construction projects using simulation and line of balance. Ph.D. Thesis,Purdue University, West Lafayette, IA.
Miller R.W., 1963, Schedule, Cost, and Profit Control with PERT
O'Brien J.J., 1969, Scheduling Handbook
O'Brien J.J., 1975, Journal of the Construction Division, ASCE, 101 (CO4), 895, 10.1061/JCCEAZ.0000569
Office, 1961, Navy Management Review, VI (2), P-910.
Office, 1962, NAVEXOS P1853, Department of the Navy
Peer S., 1974, Journal of the Construction Division, ASCE, 100 (CO3), 2, 3
Russell A.D., Proceedings of the Building Economics and Construction Management Conference, Conseil Internation du Batiment, 405
Russell A., Proceedings, Second Congress, Computing in Civil Engineering, ASCE, ASCE, Nashville, T N , (ed. J.P. Mohsen), 1134
Schrage L., 1991, User's Manual for Linear, Integer, and Quadratic Programming with UNDO
Selinger S., 1980, Journal of the Construction Division, ASCE, 106 (CO2), 195, 10.1061/JCCEAZ.0000877
Stradal O., 1982, Journal of the Construction Division, ASCE, 108 (CO3), 445, 10.1061/JCCEAZ.0001056
Suh, K. (1993) RUSS: a scheduling system for repetitive-unit construction using line-of-balance technology. Ph.D. Thesis,Illinois Institute of Technology, Chicago, IL.
United States Army Command, 1968, United States Army Command
Vorster M ., 1992, Transportation Research Record, 1351, 32
Vorster M.C., 1990, Linear Scheduling for Highway Contractors and State DOT's