Tóm tắt
The performance of large dams is monitored and evaluated using instrumentation. The main goal of monitoring of dam during construction, the first filling of the reservoir and operation is mainly evaluation of the safety in short- and long-term periods during its life of service. The present study investigates the behavior of earth dam for deformation and stress variation under construction and first filling and compares the results with the experimental instrumentation-measured data. Also, the dam safety is investigated for hydraulic fracture in the first filling and utilization. The Sabalan Earth Dam located in Ardabil Province (Northwest of Iran) was chosen as the case study. A numerical analysis was performed using the two-dimensional finite difference method (FDM) in the FLAC software. The hydraulic fracture possibility was evaluated by the Mohr-Coulomb criterion. The instrumentation results indicated that the Sabalan Earth Dam had satisfactory performance during construction and first filling of the reservoir.
Tài liệu tham khảo
Ahmad, A., Ali, S., Khan, M., Harahap, I., Aslam, M.S. : Re-assessment of an earth-fill dam using finite element method and limit equilibrium method (case study of Latamber Dam, Pakistan), J. Adv. Res. Fluid Mech. Therm. Sci. 71 (2020)
Chrzanowski, A.S., Massiera, M.: Modeling of deformations during construction of a large earth dam in The LA Grande Complex, Canada, Technical Ciences Abbrev.: Techn. Sc., No 7, (2004)
Chrzanowski, A.S., Massièra, M., Chrzanowski, A., Hill, C.: Use of geodetic monitoring surveys in verifying design parameters of large earthen dams at the stage of filling the reservoir. In: 10th International Symposium on Deformation Measurement, CA (2001)
Chrzanowski, A.S., Massièra, M., Chrzanowski, A.: Use of deformation monitoring results in solving geomechanical problems – case studies. Eng. Geol. 79, 3–12 (2006)
Clough, R.W., Woodward, R.J.: Analysis of embankment stresses and deformations. J. Soil Mech. Found. Div. 93(SM4), 529–549 (1967)
Derakhshandi, H. R., Pourbagherian, M. H., Baziar, N., Shariatmadari, A. H. : Numerical analysis and monitoring of a rockfill dam at the end of construction (case study: Vanyar dam), Int. J. Civil Eng., Vol. 12, No. 4, Transaction B: Geotechnical Engineering,(2014)
Dong, W., Hu, L., Yu, Y.Z., Lv, H.: Comparison between duncan and chang’s eb model and the generalized plasticity model in the analysis of a high earth-rockfill dam. J. Appl. Math. 20, 1–12 (2013)
Duncan, J.M., Chang, C.Y.: Nonlinear analysis of stress and strain in soils. J. Soil Mech. Found. Div. 96, 1629–1653 (1970)
Ghanbari, A., Shams Rad, S.: Development of an empirical criterion for predicting the hydraulic fracturing in the core of earth dams. J. Acta Geotech. 1–12 (2013)
Gikas, V., Sakellariou, M.: Settlement analysis of the Mornos earth dam (Greece): evidence from numerical modeling and geodetic monitoring. Eng. Struct. 30, 3074–3081 (2008)
Hunter, G., Fell, R.: The deformation behaviour of embankment dams, University of New South Wales, School of Civil and Environmental Engineering UNICIV Report No. R-416, (2003)
ICOLD, Bulletin No. 111, Dam-break flood analysis, (1998)
Isari, M., Tarinejad, R., Taghavi Ghalesari, A., Sohrabi-Bidar, A.: A new approach to generating non-uniform support excitation at topographic sites. Soils Found. (2019). https://doi.org/10.1016/j.sandf.2019.09.006
Komak Panah, A., Yanagisawa, E.: Laboratory studies of hydraulic racturing in soil, proceedings of the 23 rd Japan National Conference on Soil Mechanics and Foundation Eng, pp 505–550 (1988)
Maleki, M., Alavifer, A.: Safety evaluation of MASJED-E-SOLEYMAN during construction and first stage impounding. 73rd Annual Meeting of ICOLD, Tehran, Iran, No.101, (2005)
Naylor, D., Maranha, J., Neves, E., Pinto, A.: A back analysis of Beliche Dam. J. Geotechnique 47, 221–233 (1997)
Niroumand, H., Mirghasemi, A., Pakzad, M.: Monitoring Karkheh Dam during construction via instrumentation, Fourth Conference of Dam Construction, (2000)
Pagano, L.: Analisi del comportamento statico di dighe in terra zonate, “tesi di dottorato, Universita di Napoli” :Federico II, Naples, Italy (1996)
Pirboudaghi, S., Tarinejad, R., Alami, M. T.: Damage detection based on system identification of concrete dams using an extended finite element–wavelet transform coupled procedure. J. Vib. Control., (2017)
Rashidi, M., Haeri, S.M.: Evaluation of behaviors of earth and rockfill dams during construction and initial impounding using instrumentation data and numerical modeling. J. Rock Mech. Geotech. Eng. 9, 709–725 (2017)
Roosta, R.M., Alizadeh, A.: Simulation of collapse settlement in rockfill material due to saturation. Int. J. Civil Eng. 10, 93–99 (2012)
Shahba, Sh., Soltani, F.: Analysis of stress and displacement of Taham Earth Dam Indian. J. Sci. Technol. 9(45) (2016)
TaghaviGhalesari, A., Isari, M., Tarinejad, R., Sohrabi-Bidar, A.: A procedure to predict the precise seismic response of arch dams in time domain using boundary element formulation. J. Rock Mech. Geotech. Eng. 11(4), 790–803 (2019)
Tarinejad, R., Isari, M., Taghavi Ghalesari, A.: A new boundary element solution to evaluate the geometric effects of the canyon site on the displacement response spectrum. Earthq. Eng. Eng. Vib. 18, 267–284 (2019)
Tarinejad, R., Isari, M., Sohrabi-Bidar, A.: A new solution to estimate the time delay on the topographic site using time domain 3D boundary element method. Earthq. Eng. Vib. 19, 611–623 (2020)
Technical reports of Vanyar dam, Ghods-Niroo consultant engineers Co, Tehran, Iran (2011)
Terzaghi, K.: Theoretical Soil Mechanics. John Wiley, New York (1943)
Toori, R.A., Pourbakhshian, S., Pouraminian, M.: Dmixing PET for the safety of earth ams. Indian J. Sci. Technol. 7(12), 1950–1955 (2014)
Yu, Y., Zhang, B., Yuan, H.: An intelligent displacement back-analysis method for earth-rockfill dams. Comput. Geotech. 34, 423–434 (2007)
Zhou, W., Hua, J., Chang, X., Zhou, C.: Settlement analysis of the Shuibuya concrete-face rockfill dam. Comput. Geotech. 38, 269–280 (2011)