Integrating flexibility in open pit mine planning to survive commodity price decline

Resources Policy - Tập 81 - Trang 103428 - 2023
Lawrence Madziwa1, Mallikarjun Pillalamarry1, Snehamoy Chatterjee2
1Department of Civil, Mining and Process Engineering, Namibia University of Science and Technology, Windhoek, Namibia
2Geological and Mining Engineering and Sciences, MichiganTech, USA

Tài liệu tham khảo

Abdel Sabour, 2002, Mine size optimization using marginal analysis, Resour. Pol., 28, 145, 10.1016/j.resourpol.2004.01.001 Abdel Sabour, 2011, Incorporating geological and market uncertainties and operational flexibility into open pit mine design, J. Min. Sci., 47, 191, 10.1134/S1062739147020067 Abidin, 2012, A review on Geometric Brownian Motion in forecasting the share prices in Bursa Malaysia, World Appl. Sci. J., 17, 82 Asad, 2013, Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand, J. Oper. Res. Soc., 64, ,185, 10.1057/jors.2012.26 Barned, 2012 Beirlant, 2001, Heavy-tailed distributions and rating, ASTIN Bullet.: J. IAA, 31, 37, 10.2143/AST.31.1.993 Bhati, 2018, vol. 79, 247 Bley, 2010, A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Comput. Oper. Res., 37, 1641, 10.1016/j.cor.2009.12.008 Bloom, 2004, The effect of health on economic growth: a production function approach, World Dev., 32, 1, 10.1016/j.worlddev.2003.07.002 Caccetta, 2003, An application of branch and cut to open pit mine scheduling, J. Global Optim., 27, 349, 10.1023/A:1024835022186 Chamber of Mines of Namibia, 2016, Chamber of mines of Namibia, Annu. Rev. Chang, 2006, Determination of sample size in using central limit theorem for weibull distribution, Int. J. Inf. Manag. Sci., 17, 31 Chatterjee, 2016, Production phase and ultimate pit limit design under commodity price uncertainty, Eur. J. Oper. Res., 248, 658, 10.1016/j.ejor.2015.07.012 Chen, 2013, Method of Value-at-Risk and empirical research for Shanghai stock market, Procedia Comput. Sci., 17, 671, 10.1016/j.procs.2013.05.087 Chen, 2019, 487 Christensen, 2016, Challenges of low commodity prices for Africa, Monetary and Econ. Depart. Chuanga, 2007, Forecasting volatility in the financial markets: a comparison of alternative distribution assumptions, Appl. Financ. Economet., 17, 1051, 10.1080/09603100600771000 Deloitte, 2016, The top 10 issues the mining companies will face in the coming year, Tracki. Trends, 2016 Deutsch, 1994, Algorithmically-defined random function models, 422 Evatt, 2012, Mineral reserves under price uncertainty, Resour. Pol., 37, 340, 10.1016/j.resourpol.2012.03.004 Ferrari, 2018 Gershon, 1983, Mine scheduling optimization with mixed integer programming, Min. Eng., 35, 351 Goldberg, 1987 Goldberg, 1988, A new approach to maximum flow problem, J. Ass. Comput. Machin., 3, 921, 10.1145/48014.61051 Goodfellow, 2013, Algorithmic integration of geological uncertainty in pushback designs for complex multi-process open pit mines, Min. Technol., 122, 67, 10.1179/147490013X13639459465736 Goodwin, 2006, Receding horizon control applied to optimal mine planning, Automatica, 42, 1337, 10.1016/j.automatica.2006.01.016 Gumbel, 1941, The return period of flood flows, Ann. Math. Stat., 12, 163, 10.1214/aoms/1177731747 Guo, 2012, Estimating volatilities by the GARCH and the EWMA model of PetroChina and TCL in the stock exchange market of China, 191 Hamushek, 2020, Education production functions, 161 Henderson, 2003, Marshall's scale economies, J. Urban Econ., 53, 1, 10.1016/S0094-1190(02)00505-3 Hochbaum, 2001, A new-old algorithm for minimum cut algorithm and maximum flow in closure grapghs, Networks, 37, 171, 10.1002/net.1012 Hochbaum, 2003, Efficient algorithms for the inverse spanning-tree problem, Oper. Res., 51, 785, 10.1287/opre.51.5.785.16756 Hochbaum, 2000, Performance analysis and best implementations of old and new algorithms for the open pit mining problem, Oper. Res., 48, 894, 10.1287/opre.48.6.894.12392 Hogg, 2009, John Wiley & Sons, Loss Distribut. Hossain, 2018, Contemporary middle eastern issues, Educat. Business Soc. Hung – Chung, 2009, Forecasting China stock markets volatility via GARCH models under skewed- GED distribution, J. Money Invest. Banking, 542 Irmen, 2009, Factor substitution, income distribution and growth in a generalized neoclassical model, German Economic Eview, 10, 464, 10.1111/j.1468-0475.2009.00491.x Jenkinson, 1955, The frequency distribution of the annual maximum (or minimum) values of meteorological elements, Q. J. R. Meteorol. Soc., 81, 158, 10.1002/qj.49708134804 Karl, 2018, Annual review 2017, Explorat. Rev. Mining Eng., 70 Klugman, 2012, vol. 715 2017, Mining executives identify top risks, Insights into mining 2020, Risks and opportunities for mining, Insights into mining Lerchs, 1965, Optimum design of open pit mines, Trans. CIM, 58, 17 Madziwa, 2022, Gold price forecasting using multivariate stochastic model, Resour. Pol., 76, 102544, 10.1016/j.resourpol.2021.102544 Mallick, 2012, The role of the elasticity of substitution in economic growth: a cross-country investigation, Lab. Econ., 19, 682, 10.1016/j.labeco.2012.04.003 Mandy, 2016 McNeil, 1997, Estimating the tails of loss severity distributions using extreme value theory, ASTIN Bullet.: J. IAA, 27, 117, 10.2143/AST.27.1.563210 McNeil, 2015 Mining Nancel-Penard, 2021, Optimizing pushback design considering minimum mining width for open pit strategic planning, Eng. Optim., 1 Pana, 1965, The simulation approach to openpit design, 139 Pell, 2019, Environmental optimisation of mine scheduling through life cycle assessment integration. Resources, Conserv. Recycl., 142, 267, 10.1016/j.resconrec.2018.11.022 Pesaran, 2001, Bounds testing approaches to the analysis of level relationships, J. Appl. Econom., 16, 289, 10.1002/jae.616 Picard, 1976, Maximal closure of a graph and applications to combinatorial problems, Manag. Sci., 22, 1268, 10.1287/mnsc.22.11.1268 Rahmanpour, 2016, Determination of value at risk for long-term production planning in open pit mines in the presence of price uncertainty, J. S. Afr. Inst. Min. Metall, 116, 229, 10.17159/2411-9717/2016/v116n3a3 Ramazan, 2013, Production scheduling with uncertain supply: a new solution to the open pit mining problem, Optimize, 14, 361, 10.1007/s11081-012-9186-2 Rao, 2009 Resnick, 1997, Heavy tail modeling and teletraffic data: special invited paper, Ann. Stat., 25, 1805, 10.1214/aos/1069362376 Sato, 2009, Quantity or quality: the impact of labour saving innovation on US and Japanese growth rates, 1960-2004, Jpn. Econ. Rev., 60, 407, 10.1111/j.1468-5876.2008.00467.x Sevim, 1998, The problem of production planning in open pit mines, INFOR (Informat. Syst. Operat. Res.), 36, 1 Singer, 1998 Smith, 1997, A critical examination of the methods and factors affecting the selection of an optimum production rate, CIM bulletin, 90, 48 Subramanya, 2009 Tapia Cortez, 2018, Alternative techniques for forecasting mineral commodity prices, Int. J. Min. Sci. Technol., 28, 309, 10.1016/j.ijmst.2017.09.001 Tatman, 2001, Production-rate selection for steeply dipping tabular deposits, Min. Eng., 53, 62 Taylor, 1986, A 203 Tolwinski, 1998, Scheduling production for open pit mines, 19 Tolwinski, 1992, An algorithm to estimate the optimal evolution of an open pit mine, 399 Trück, 2020, Modelling and forecasting volatility in the gold market, Int. J. Bank. Finance, 9, 48 Whittle, 1999, A decade of open pit mine planning and optimization - the craft of turning algorithms into packages, 15 Yousef, 2020, Spill over of COVID-19: impact on stock market volatility, Int. J. Psychosoc. Rehabil., 24, 18069 Zellner, 1966, On the analysis of first order autoregressive models with incomplete data, Int. Econ. Rev., 7, 72, 10.2307/2525370 Zha, 2018, Energy-biased technical change in the Chinese industrial sector with CES production functions, Energy, 148, 896, 10.1016/j.energy.2017.11.087 Zivot, 2009, 113