Information integration framework for a public–private partnership system of an urban railway transit project (Part A: System architecture)
Tài liệu tham khảo
Yehoue, 2006, Determinants of public-private partnerships in infrastructure, IMF Work. Pap., 06, 1, 10.5089/9781451863598.001
NDRC, National key special planning - “13th five-year plan” modern integrated transportation system development plan, (2017). http://ghs.ndrc.gov.cn/ghwb/gjjgh/201705/t20170509_846922.html.
NDRC, Review on the development of urban rail transit industry during the 12th Five-Year Plan period, (2016). http://gjss.ndrc.gov.cn/zttp/xyqzlxxhg/201712/t20171221_871242.html.
Osei-Kyei, 2015, Review of studies on the critical success factors for public-private partnership (PPP) projects from 1990 to 2013, Int. J. Proj. Manag., 33, 1335, 10.1016/j.ijproman.2015.02.008
Chang, 2013, Public-private partnerships in China: a case of the Beijing No.4 Metro line, Transport Pol., 30, 153, 10.1016/j.tranpol.2013.09.011
de Jong, 2010, Introducing public–private partnerships for metropolitan subways in China: what is the evidence?, J. Transport Geogr., 18, 301, 10.1016/j.jtrangeo.2009.06.013
Zhao, 2016, A decision model of risk allocation for urban rail transit projects under Public-Private-Partnership model: a research framework, 397
Zhao, 2018, Evaluation of consolidation center cargo capacity and loctions for China railway express, Transport Res. Part E, 117, 58, 10.1016/j.tre.2017.09.007
Ling, 2014, Drivers and barriers to adopting relational contracting practices in public projects: comparative study of Beijing and Sydney, Int. J. Proj. Manag., 32, 275, 10.1016/j.ijproman.2013.04.008
Wang, 2014, Real option in urban rapid rail transit PPP project, Appl. Mech. Mater., 505–506, 437
Zhang, 2016, Approximating actual flows in physical infrastructure networks: the case of the Yangtze River Delta high-speed railway network, Bull. Geogr. Socio-Econ. Ser., 31, 145
Shalaby, 2014
Wang, 2000, Evaluation of political risks, J. Constr. Eng. Manag., 126, 242, 10.1061/(ASCE)0733-9364(2000)126:3(242)
Xu, 2010, Developing a risk assessment model for PPP projects in China-a fuzzy synthetic evaluation approach, Autom. Constr., 19, 929, 10.1016/j.autcon.2010.06.006
Han, 2011, Risk evaluation of public-private partnership projects of urban rail transit based on fuzzy comprehensive evaluation method, 1
Sachs, 2007, Analysis of political risks and opportunities in public private partnerships (PPP) in China and selected Asian countries: survey results, Chin. Manag. Stud., 1, 126, 10.1108/17506140710758026
Ke, 2010, Preferred risk allocation in China's public-private partnership (PPP) projects, Int. J. Proj. Manag., 28, 482, 10.1016/j.ijproman.2009.08.007
Chou, 2012, Critical factors and risk allocation for PPP policy: comparison between HSR and general infrastructure projects, Transport Pol., 22, 36, 10.1016/j.tranpol.2012.05.009
Jin, 2010, Neurofuzzy decision support system for efficient risk allocation in public-private partnership infrastructure projects, J. Comput. Civ. Eng., 24, 525, 10.1061/(ASCE)CP.1943-5487.0000058
Jin, 2011, Modelling optimal risk allocation in PPP projects using artificial neural networks, Int. J. Proj. Manag., 29, 591, 10.1016/j.ijproman.2010.07.011
Chang, 2017, Urban rail transit PPPs: lessons from East Asian cities, Transp. Res. Part A Policy Pract., 105, 106, 10.1016/j.tra.2017.08.015
Liou, 2012, Modeling government subsidies and project risk for financially non-viable build-operate-transfer (BOT) projects, Eng. Manag. J., 24, 58, 10.1080/10429247.2012.11431929
Pucher, 1983, Impacts of subsidies on the costs of urban public transport, J. Transport Ecol. Pol., 17, 155
L. Xu, Enterprise integration and information architecture: a systems perspective on industrial information integration, 2015.
Cochran, 1991, An integrated multicomputer DSS design for transport planning using embedded computer simulation and database tools, Decis. Support Syst., 7, 87, 10.1016/0167-9236(91)90048-G
Shim, 2002, Past, present, and future of decision support technology, Decis. Support Syst., 33, 111, 10.1016/S0167-9236(01)00139-7
Cheng, 2018, Data and knowledge mining with big data towards smart production, J. Ind. Inf. Integr., 9, 1
Al-zubaidi, 2021, Analysis of drivers for solving facility layout problems: a literature review, J. Ind. Inf. Integr., 21
Chen, 2016, Industrial information integration—a literature review 2006–2015, J. Ind. Inf. Integr., 2, 30
Chen, 2019, A survey on industrial information integration 2016-2019, J. Ind. Integr. Manag., 05, 33, 10.1142/S2424862219500167
Xu, 2020, Industrial information integration-an emerging subject in industrialization and informatization process, J. Ind. Inf. Integr., 17
Lu, 2018, The evaluation of forestry ecological security in China: developing a decision support system, Ecol. Indic., 91, 664, 10.1016/j.ecolind.2018.03.088
Ocalir-Akunal, 2016, Decision support systems in transport planning, Procedia Eng,, 161, 1119, 10.1016/j.proeng.2016.08.518
Borne, 2003, Decision support system for urban transportation networks, IEEE Trans. Syst. Man Cybern. Part C, 33, 67, 10.1109/TSMCC.2003.809355
Farajian, 2011, A multi-objective decision support system for PPP funding decisions, 210
J. Xie, A multi-objective decision support system for determining an appropriate PPP scheme, 2010.
Xie, 2013, Multi-objective Bayesian network model for public-private partnership decision support, J. Constr. Eng. Manag., 139, 1069, 10.1061/(ASCE)CO.1943-7862.0000695
M. Farajian, Q. Cui, A multi-objective decision support system for PPP funding decisions, 2010.
MOF, Guide to the operation of public private partnership model, 2014.
Henk, 1998, Privatization and the public private partnership, J. Manag. Eng., 14, 28, 10.1061/(ASCE)0742-597X(1998)14:4(28)
Liu, 2010, Integration of decision support systems to improve decision support performance, Knowl. Inf. Syst., 22, 261, 10.1007/s10115-009-0192-4
Nemati, 2002, Knowledge warehouse: an architectural integration of knowledge management, decision support, artificial intelligence and data warehousing, Decis. Support Syst., 33, 143, 10.1016/S0167-9236(01)00141-5
Jiang, 2019, Identifying significant risks and analyzing risk relationship for construction PPP projects in China using integrated FISM-MICMAC Approach, Sustainability, 11, 10.3390/su11195206
Peckham, 1988, A computer-based system for risk management support, Decis. Support Syst., 4, 481, 10.1016/0167-9236(88)90011-5
Prabakaran, 2018, Fuzzy decision support system for improving the crop productivity and efficient use of fertilizers, Comput. Electron. Agric., 150, 88, 10.1016/j.compag.2018.03.030
Sastoque, 2016, A proposal for risk allocation in social infrastructure projects applying PPP in Colombia, Procedia Eng., 145, 1354, 10.1016/j.proeng.2016.04.174
Su, 2009, Risk evaluation of venture capital based on AHP and grey relational analysis methods, 316
