Information inaccuracy: Implications for economic production scheduling
Tài liệu tham khảo
Lawrence, 1991, Scheduling a single machine to maximize net present value, Int. J. Prod., Res., 29, 1141, 10.1080/00207549108930124
Rohleder, 1993, An experimental comparison of time-based vs. economic-based scheduling methods in a dynamic job shop, Dec. Sci., 24, 1037, 10.1111/j.1540-5915.1993.tb00502.x
Rohleder, 1992, Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives, Int. J. Prod. Res., 30, 129, 10.1080/00207549208942882
Rohleder, 1993, Comparing Performance Measures in Dynamic Job Shops: Economics vs. Time, Int. J. Prod. Econom., 32, 169, 10.1016/0925-5273(93)90066-T
Bitran, 1988, Multiproduct queueing networks with deterministic routing: decomposition approach and the notion of interference, Management Science, 34, 75, 10.1287/mnsc.34.1.75
Scudder, 1989, Application of the net present value criterion in random and flow shop scheduling, Dec. Sci., 20, 602, 10.1111/j.1540-5915.1989.tb01570.x
Kanet, 1989, Manufacturing systems with forbidden early shipments: implications for setting manufacturing lead times, Int. J. Prod. Res., 27, 783, 10.1080/00207548908942587
Christy, 1990, Manufacturing systems with forbidden early shipments: implications for choice of scheduling rules, Int. J. Prod. Res., 28, 91, 10.1080/00207549008942686
Morton, 1988, SCHED-STAR: A price based shop scheduling module, J. Manuf. Oper. Mgmt., 1, 131
Ragatz, 1988, An evaluation of order release mechanisms in a job-shop environment, Dec. Sci., 19, 167, 10.1111/j.1540-5915.1988.tb00260.x
Carroll, 1965, Heuristic sequencing of single and multiple component jobs
Ow, 1989, The single machine early/tardy problem, Management Science, 35, 177, 10.1287/mnsc.35.2.177
Pegden, 1990
Law, 1991
Sas Institute, 1988, Sas/Stat User's Guide