Improved principal component monitoring of large-scale processes
Tài liệu tham khảo
J.F. MacGregor, T.E. Marlin, J.V. Kresta, B. Skagerberg, Multivariate statistical methods in process analysis and control, in: AIChE Symposium Proceedings of the 4th International Conference on Chemical Process Control, New York, AIChE Publication, No. P-67, 1991, pp. 79–99
Wise, 1996, The process chemometrics approach to process monitoring and fault detection, Journal of Process Control, 6, 329, 10.1016/0959-1524(96)00009-1
Kruger, 2001, Extended pis approach for enhanced condition monitoring of industrial processes, AIChE Journal, 47, 2076, 10.1002/aic.690470918
Wold, 1987, Principal component analysis, Chemometrics and Intelligent Laboratory Systems, 2, 37, 10.1016/0169-7439(87)80084-9
Ku, 1995, Disturbance rejection and isolation by dynamic principal component analysis, Chemometrics and Intelligent Laboratory Systems, 30, 179, 10.1016/0169-7439(95)00076-3
Downs, 1993, A plant-wide industrial-process control problem, Computers and Chemical Engineering, 17, 245, 10.1016/0098-1354(93)80018-I
Jackson, 1980, Principal components and factor analysis: Part i: Principal components, Journal of Quality Control, 12, 201
Kresta, 1991, Multivariate statistical monitoring of process operating performance, The Canadian Journal of Chemical Engineering, 69, 35, 10.1002/cjce.5450690105
Box, 1994
Liu, 1992
Akaike, 1974, A new look at the statistical model identification, IEEE Transactions on Automatic Control, AC-19, 667, 10.1109/TAC.1974.1100707
Schwarz, 1978, Estimating the model dimension, Annals of Statistics, 6, 461, 10.1214/aos/1176344136
Rissanen, 1978, Modelling by shortest data description, Automatica, 14, 465, 10.1016/0005-1098(78)90005-5
Chow, 1972, On estimating the orders of an autoregressive moving average process with uncertain observations, IEEE Transactions on Automatic Control, 17, 707, 10.1109/TAC.1972.1100122
Cadzow, 1983, Singular-value decomposition approach to time series modeling, Proceedings of the Institution of Electrical Engineers Part F, 130, 202
Zhang, 1993, Singular value decomposition-based ma order determination of non-Gaussian arma models, IEEE Transactions on Signal Processing, 41, 2657, 10.1109/78.229896
Ribeiro, 1991, Ld2-arma identification algorithm, IEEE Transactions on Signal Processing, 39, 1822, 10.1109/78.91153
Broersen, 1998, The quality of models for arma processes, IEEE Transactions on Signal Processing, 46, 1749, 10.1109/78.678516
Hannan, 1980, The estimation of the order of an arma process, Annals of Statistics, 8, 1071, 10.1214/aos/1176345144
Pauler, 1998, The Schwarz criterion and related methods for normal linear models, Biometrika, 85, 13, 10.1093/biomet/85.1.13
Lyman, 1995, Plant-wide control of the Tennessee Eastman problem, Computers and Chemical Engineering, 19, 321, 10.1016/0098-1354(94)00057-U