Horizontal integration management: An optimal switching model for parallel production system with multiple periods in smart supply chain environment
Tài liệu tham khảo
Benders, 2002, The origin of period batch control (PBC), Int. J. Prod. Res., 40, 1, 10.1080/00207540110069087
Deloitte, 2015
Enns, 2001, MRP performance effects due to lot size and planned lead time settings, Int. J. Prod. Res., 39, 461, 10.1080/00207540010002810
El Hafsi, 1998, Multi-period production planning with demand and cost fluctuations, J. Math. Comput. Model., 28, 103, 10.1016/S0895-7177(98)00102-2
Kong, 2013, Optimal assignment with two or three special workers in a reset limited-cycle problem with multiple periods, J. Japan Ind. Manag. Assoc., 64, 157
Kyparisis, 2006, Flexible flow shop scheduling with uniform parallel machines, Eur. J. Oper. Res., 168, 985, 10.1016/j.ejor.2004.05.017
Lee, 2017, Design and application of Internet of things-based warehouse management system for smart logistics, Int. J. Prod. Res., 1
Leonard, 2016, A cloud brokerage approach for solving the resource management problem in multi-cloud environments, Comput. Ind. Eng., 95, 16, 10.1016/j.cie.2016.02.015
Leung, 2006, A stochastic programming approach for multi-site aggregate production planning, J. Oper. Res. Soc., 57, 123, 10.1057/palgrave.jors.2601988
Li, 2010, Optimal solution structure for multi-period production planning with returned products remanufacturing, Asia Pac. J. Oper. Res., 27, 629, 10.1142/S0217595910002910
Lin, 2007, A multi-site supply network planning problem considering variable time buckets - a TFT -LCD industry case, Int. J. Adv. Manuf. Technol., 33, 1031, 10.1007/s00170-006-0537-z
Longo, 2017, Smart operators in industry 4.0: a human-centered approach to enhance operators' capabilities and competencies within the new smart factory context, Comput. Ind. Eng., 113, 144, 10.1016/j.cie.2017.09.016
Matsui, 2005, A Management cycle model: switching control under lot processing and time span, J. Japan Ind. Manag. Assoc., 56, 256
Matsui, 2008
Mirzapour Al-e-hashem, 2011, A multiobjective stochastic production-distribution planning problem in an uncertain environment considering risk and workers productivity, Math. Probl. Eng., 14
Porkka, 2003, multi-period production planning carrying over set-up time, Int. J. Prod. Res., 41, 1133, 10.1080/0020754021000042995
Safaei, 2009, Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems, Int. J. Prod. Econ., 120, 301, 10.1016/j.ijpe.2008.12.013
Shah, 2012, Integrated production planning and scheduling optimization of multisite, multiproduct process industry, Comput. Chem. Eng., 37, 214, 10.1016/j.compchemeng.2011.08.007
Nof, 2015
Strozzi, 2017, Literature review on the ‘Smart Factory’ concept using bibliometric tools, Int. J. Prod. Res., 55, 6572, 10.1080/00207543.2017.1326643
Subramanian, 2013, Integration of control theory and scheduling methods for supply chain management, Comput. Chem. Eng., 51, 4, 10.1016/j.compchemeng.2012.06.012
Sun, 2010, A study of optimal switching problem in limited-cycle with multiple periods, J. Zhejiang Univ. - Sci., 11, 933, 10.1631/jzus.A1001062
Sun, 2014, Optimal switching polity on limited-cycle problem with multiple periods, J.SOPE Japan, 95, 1
Toni, 2000, The production planning process for a network of Firms in the textile-apparel industry, Int. J. Prod. Econ., 65, 17, 10.1016/S0925-5273(99)00087-0
Tortorella, 2017, Implementation of Industry 4.0 and lean production in Brazilian manufacturing companies, Int. J. Prod. Res., 1
Verzijl, 1976, 16
Week, 1979, 177
Wu, 2008, Stochastic scheduling to minimize the expected maximum lateness, Eur. J. Oper. Res., 190, 103, 10.1016/j.ejor.2007.06.015
Xia, 2005, Hybrid particle swarm optimization approach for multiobjective flexible job-shop scheduling problems, Control Decis., 20, 137
Yamamoto, 2006, A basic study on a limited-cycle problem with multi periods and the optimal assignment problem, J. Japan Ind. Manag. Assoc., 57, 23
Yamamoto, 2010, A study on limited-cycle scheduling problem with multiple periods, Comput. Ind. Eng., 59, 675, 10.1016/j.cie.2010.07.017
Yamamoto, 2011, A study of optimal arrangement in a reset limited-cycle problem with multiple periods –with fewer special workers-, J. Japan Ind. Manag. Assoc., 62, 239