Homogenisation Techniques for the Analysis of Production Lines with Unreliable Machines Having Different Speeds
Tài liệu tham khảo
Alvarez, 1994, A study of the continuous flow model of production lines with unreliable machines and finite buffers, Journal of Manufacturing Systems, 13, 221, 10.1016/0278-6125(94)90006-X
Alvarez R, Dallery Y, David R. Une methode analytique pour l’évaluation des performances d’une ligne de fabrication dont les machines ont des vitesses différentes. Note Interne 91/14, Laboratoire d’Automatique de Grenoble.
Bonvik AM. Performance analysis of manufacturing systems under hybrid control policies. PhD Thesis, Massachusetts Institute of Technology, Cambridge MA. June 1996.
Burman MH. New results in flow line analysis. PhD Thesis, Massachusetts Institute of Technology, Cambridge MA. June 1995.
Buzacott, 1967, Automatic transfer lines with buffer stocks, Int J Prod Res, 5, 182, 10.1080/00207546708929751
Buzacott, 1978, Models of automatic transfer lines with inventory banks: a review and comparison, AIIE Transactions, 10, 197, 10.1080/05695557808975204
Dallery, 1994, On modelling failure and repair times in stochastic models of manufacturing systems using generalized exponential distributions, Queueing Systems, 15, 199, 10.1007/BF01189237
Dallery, 1988, An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers, IIE Transactions, 20, 280, 10.1080/07408178808966181
Dallery, 1989, Approximate analysis of transfer lines with unreliable machines and finite buffers, IEEE Transactions on Automatic Control, 34, 943, 10.1109/9.35807
Dallery, 1992, Manufacturing flow line systems: a review of models and analytical results, Queueing Systems Theory and Applications, 12, 3, 10.1007/BF01158636
Dallery, 1995, An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
Di Mascolo, 1988, Méthode analytique d’évaluation des performances d’une ligne d’assemblage, Rapport de DEA, Laboratoire d’Automatique de Grenoble
Gershwin, 1987, An efficient decomposition method for the approximate evaluation of tandem queues with finite storage space and blocking, Operations Research, 35, 291, 10.1287/opre.35.2.291
Gershwin, 1987, Representation analysis of transfer lines with machines that have different processing rates, Ann Oper Res, 9, 511, 10.1007/BF02054752
Gershwin, 1980
Gershwin, 1983, Modelling and analysis of three-stage transfer lines with unreliable machines and finite buffers, Operations Research, 31, 354380, 10.1287/opre.31.2.354
Glassey, 1993, The analysis behavior of an unreliable n-state automatic transfer line with (n - 1) interstage buffer storage, International Journal of Production Research, 31, 519, 10.1080/00207549308956742
Kouvatsos, 1986, Maximum entropy and the G/Gl/N queue, Acta Informatica, 23, 545, 10.1007/BF00288469
Le Bihan, 1994, Méthodes approximatives d’études des lignes de production, Rapport de DEA de Systèmes Informatiques, Laboratoire MASI
Liu, 1990, Approximate models of assembly systems with finite banks, European Journal of Operational Research, 45, 143, 10.1016/0377-2217(90)90181-A
Pierrat, 1987, Modélisation de systèmes à évènements discrets sujets à des pannes, Thèse de doctorat de l’Institut National Polytechnique de Grenoble
Semery A. Modélisation des L.I.F.: intégration du modèle de Dubois et Forestier a l’heuristique de Gershwin, pour les lignes à temps de cycles différents. Rapport de Recherche ASj619-87, Régie Renault. Direction de la recherche 1987.
Zimmern, 1956, Etude de la propagation des arrêts aléatoires dans les chaínes de production, Revue de Statistiques Appliquées, 4, 85