Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2

Tunnelling and Underground Space Technology - Tập 19 Số 3 - Trang 217-237 - 2004
Søren Degn Eskesen1, Per Tengborg1, Jørgen Kampmann1, Trine Holst Veicherts1
1ITA Working Group 2, Research, ITA-AITES, c/o EPFL, Bat GC, CH 1015 Lausanne, Switzerland

Tóm tắt

Từ khóa


Tài liệu tham khảo

Ang, 1984, Probability concepts in engineering planning and design, vol. II

The Engineering Council, 1993. Guidelines on Risk Issues. London, ISBN 0-9516611-7-5

Benjamin, 1970

Crystal Ball – User manual, Decisioneering Inc

Jaselskis, 1992, Risk analysis approach to selection of contractor, Evaluation Method, Journal of construction Engineering and Management, 118, 814, 10.1061/(ASCE)0733-9364(1992)118:4(814)

Lichtenberg, S., 1989. The Successive Principle – a New Decision Tool for the Conception Phase, Proceedings. Project Management Institute/INTERNET Symposium, Atlanta

Lichtenberg, 2000

Sturk, R., 1998. Engineering geological information – Its value and impact on tunnelling. Doctoral Thesis at Royal Institute of Technology, Stockholm

Bielecki, R., 1998. The safety concept for construction of the 4th tube of the Elbe Tunnel in Hamburg. In: Russian Tunnelling Society: Underground City; Geotechnology and Architecture. Conference September 8–10, 1998, St. Petersburg, pp. 82–89

Einstein, 1996, Risk and risk analysis in rock engineering, Tunnelling and Underground Space Technology, 11, 141, 10.1016/0886-7798(96)00014-4

Eskesen S.D., Kampmann J., 2000. Risk reduction strategy in urban tunnelling: experience from the Copenhagen Metro. In: ITA World Tunnel Congress, Tunnels under Pressure, Durban, 2000

Godfrey, P.S., 1996. Control of Risk – A Guide to the Systematic Management of Risk from Construction. Construction Industry Research and Information Association, CIRIA

Holst Olsen, T., Lauritzen, E.K., Holm, N., Ladefoged, L., 1997. Practical risk management in construction – experiences from the Øresund fixed link, Danish Landworks, Society for Risk Analysis – Europe Conference, New Risk Frontiers, Stockholm

Isaksson, M.T., Reilly, J.J., Anderson, J.M., 1999. Risk mitigation for tunnel projects – A structured approach. In: Alten, et al., (Eds.), Proceedings Challenges for the 21st Century. Balkema, Rotterdam

Kampmann, J., Eskesen, S.D., Summers, J.W., 1998. Risk assessment helps select the contractor for the Copenhagen Metro System. In:d ITA World Tunnel Congress, Tunnels and Metropolises, Sao Paulo, Balkema

Reilly, 2000, The management process for complex underground and tunnelling projects, Tunnelling and Underground Space Technology, 15, 31, 10.1016/S0886-7798(00)00026-2

Norwegian Tunnelling Society, 1992. ITA Recommendations of Contractual Sharing of Risks. second ed., March, 1992

Smith, D.J., 1997. Reliability Maintainability and Risk. Butterworth Heinemann, Donald Lamont, ISBN0 07506 37528

Stille, H., Sturk, R., Olsson, L., 1998. Quality systems and risk analysis – New philosophies in underground construction industry. In: Franzén, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Proc. Underground Construction in Modern Infrastructure, Stockholm, June 1998. Rotterdam, Balkema

Tengborg, P., Olsson, L., Johansson, J., Brantmark, J., 1998. System analysis of the Hvalfjördur tunnel. In: Franzén, T., Bergdahl, S.-G., Nordmark, A., (Eds.), Proc. Underground Construction in Modern Infrastructure, Stockholm, June 1998. Rotterdam, Balkema

Tonon, 2002, Multiobjective optimization under uncertainty in tunnelling: application to the design of tunnel support/reinforcement with case histories, Tunnelling and Underground Space Technology, 17, 33, 10.1016/S0886-7798(02)00002-0