Blazewicz, J., J.K. Lenstra and A.H.G. Rinnooy Kan (1983), “Scheduling Subject to Resource Constraints: Classification and Complexity,” Discrete Applied Mathematics 5, 11-24.
Boehm, B. (1981), Software Engineering Economics, Prentice-Hall, Englewood Cliffs, NJ.
Chang, C.K. (1993), “Is existing software engineering obsolete?” IEEE Software, September, 4-5.
Chao, C. (1995), “SPMNET: A New Methodology for Software Management”, Ph.D. Thesis, The University of Illinois at Chicago.
Chang, C.K. and M. Christensen (1999), “A Net Practice for Software Project Management,” IEEE Software, November/December, 80-88.
Davis, E.W. and G.E. Heidorn (1971), “An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints,” Management Science 17, 12, B803-B817.
Forrest, S. (1993), “Genetic Algorithms: Principles of Natural Selection Applied to Computation,” Science 261, 872-878.
Gallagher, K., M. Sambridge and G. Drijkoningen (1991), “Genetic Algorithms: An Evolution from Monte Carlo Methods for Strongly Non-Linear Geophysical Optimization Problems,” Geophysical Research Letter 18, 12, 2177-2180.
Goldberg, D.E. (1989), Genetic Algorithm in Search, Optimization and Machine Learning, Addison-Wesley, Reading, MA.
Goodman, E.D. (1996). “An Introduction to GALOPPS Release 3.2 (July 31, 1996),” Technical Report No. 96-07-01, Genetic Algorithms Research and Applications Group (GARAGe), Michigan State University.
Holland, J.H. (1992), “Genetic Algorithms,” Scientific American, 66-72.
Knjazew, D. (2000), “Ordering Messy Genetic Algorithm in C++,” IlliGAL Report No. 2000034.
Ozdamar, L. and G. Ulusoy (1995), “A Survey on the Resource-Constrained Project Scheduling Problem,” IIE Transactions 27, 574-586.
Schraudolph, N.N. and J.J. Grefenstette, (1992), “A User's Guide to GAUCSD 1.4”, Technical Report CS92-249, CSE Department, UC San Diego.
Wall, B.M. (1996), “A Genetic Algorithm for Resource-Constrained Scheduling”, Ph.D. Thesis, MIT; http://lancet.mit.edu/ga.