Baker, K.R. (1974) Introduction to Sequencing and Scheduling, John Wiley and Sons.
Lenstra, J.K., Rinnooy Kan, A.H.G. and Brucker, P. (1977) Complexity of machine scheduling problems. Annals of Discrete Mathematics, 1, 75–90.
Smith, W.E. (1956) Various optimizers for single-state production. Naval Research Logistics Quarterly, 3(1), 59–66.
Jackson, J.K. (1955) Scheduling a production line to minimize maximum tardiness. Research Report 43, Management Science Research Project, University of California, Los Angeles.
Bianco, L. and Ricciardelli, S. (1982) Scheduling of a single machine to minimize total weighted completion time subject to release dates. Naval Research Logistics Quarterly, 29(1), 151–167.
Chandra, R. (1979) On n/1/{ie372-01} dynamic deterministic problems. Naval Research Logistics Quarterly 26, 537–544.
Deogun, J.S. (1983) On scheduling with ready times to minimize mean flow time. Computing Journal, 26(4), 320–338.
Dessouky, M.I. and Deogun, J.S. (1981) Sequencing jobs with unequal ready times to minimize mean flow time. SIAM Journal of Computing, 10(1), 192–202.
Hariri, A.M.A. and Potts, C.N. (1983) An algorithm for single machine sequencing with release dates to minimize total weighted completion time. Discrete Applied Mathematics, 5, 99–109.
Beshara, S.B. and Magazine, M.J. (1981) Myopic heuristics for single machine scheduling problems. International Journal of Production Research, 19(1), 85–95.
Posner, M.E. (1986) A sequencing problem with release dates and clustered jobs. Management Science, 32(6), 731–738.
Conway, R.W., Maxwell, W.L. and Miller, L.W. (1967) Theory of Scheduling, Addison-Wesley, Reading, MA.
Porteus, E.L. (1985) Investing in reduced setups in the EOQ model. Management Science, 31(8), 998–1010.
Porteus, E.L. (1986) Optimal lot sizing: process quality improvement and setup cost reduction. Operations Research, 34(1), 137–144.
Du, J. and Leung, J.Y.-T. (1990) Minimizing total tardiness on one machine is NP-hard Mathematics of Operations Research, 15, 483–495.