Flexible management of repetitive construction processes by an intelligent support system
Tài liệu tham khảo
AbouRizk, 2010, Role of simulation in construction engineering and management, Journal of Construction Engineering and Management-Asce, 136, 1140, 10.1061/(ASCE)CO.1943-7862.0000220
AbouRizk, 2011, Research in modeling and simulation for improving construction engineering operations, Journal of Construction Engineering and Management, 137, 843, 10.1061/(ASCE)CO.1943-7862.0000288
Adeli, 1988
Al-Hussein, 2006, Integrating 3D visualization and simulation for tower crane operations on construction sites, Automation in Construction, 15, 554, 10.1016/j.autcon.2005.07.007
Al-Jibouri, 2002, A knowledge based system for linking information to support decision making in construction, Electronic Journal of Information Technology in Construction, 7, 83
Al-Tabtabai, 1998, A framework for developing an expert analysis and forecasting system for construction projects, Expert Systems with Applications, 14, 259, 10.1016/S0957-4174(97)00079-1
Arditi, 2002, Scheduling system for high rise building construction, Construction Management and Economics, 20, 353, 10.1080/01446190210131647
Behzadan, 2008, Ubiquitous location tracking for context-specific information delivery on construction sites, Automation in Construction, 17, 737, 10.1016/j.autcon.2008.02.002
Behzadan, 2011, Integrated information modeling and visual simulation of engineering operations using dynamic augmented reality scene graphs, Electronic Journal of Information Technology in Construction, 16, 259
Bertelsen, S. (2003). Construction as a complex system. In Proceedings of the 11th annual meeting of the international group for lean construction, Blacksburg, Virginia, USA.
Bragadin, M. A., Kähkönen, K. (2011). Heuristic solution for resource scheduling for repetitive construction projects. In Proceedings of the management and innovation for a sustainable built environment, 20–23 June, Amsterdam, The Netherlands.
Chau, 2005, 4D dynamic construction management and visualization software: 1. Development, Automation in Construction, 14, 512, 10.1016/j.autcon.2004.11.002
Chen, 2013, A 3D visualized expert system for maintenance and management of existing building facilities using reliability-based method, Expert Systems with Applications, 40, 287, 10.1016/j.eswa.2012.07.045
Chung, 1999, Neuro-based expert system for facility layout construction, Journal of Intelligent Manufacturing, 10, 359, 10.1023/A:1008980812648
Dym, 1991, Toward the integration of knowledge for engineering modeling and computation, Engineering with Computers, 7, 209, 10.1007/BF01206363
Gehbauer, F., Zülch, G., Ott, M., Börkircher, M. (2007). Simulation-based analysis of disturbances in construction operations. In Proceedings of the 15th annual conference, international group for lean construction (IGLC-15), July, Michigan, USA.
Golparvar-Fard, 2009, Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs, Journal of Computing in Civil Engineering, 23, 391, 10.1061/(ASCE)0887-3801(2009)23:6(391)
Hajdasz, 2008, Modelling and simulation of monolithic construction processes, Technological and Economic Development of Economy, 14, 478, 10.3846/1392-8619.2008.14.478-491
Hajdasz, M., Marlewski, A. (1999). Computer-aided searching for the optimal time of a technological process realised with production resources of fixed type. In Proceedings of the 5th international conference on the application of artificial intelligence to civil and structural engineering (AICIVIL-COMP99), 13–15 September, 1999, Oxford, England.
Hajdasz, M., Marlewski, A. (2011). A computer assisted study applied to the analysis of the production set efficiency. In Proceedings of the 25th European simulation and modelling conference – ESM’2011, 24-26 October, Guimaraes, Portugal.
Harris, 1998, Scheduling projects with repeating activities, Journal of Construction Engineering and Management-Asce, 124, 269, 10.1061/(ASCE)0733-9364(1998)124:4(269)
Hartmann, 2007, Supporting the constructability review with 3D/4D models, Building Research and Information, 35, 70, 10.1080/09613210600942218
Hong, 2002, Visual modeling and simulation for construction operations, Automation in Construction, 11, 47, 10.1016/S0926-5805(01)00049-8
Imriyas, 2009, An expert system for strategic control of accidents and insurers’ risks in building construction projects, Expert Systems with Applications, 36, 4021, 10.1016/j.eswa.2008.02.029
Kaklauskas, 2007, A multiple criteria decision support on-line system for construction, Engineering Applications of Artificial Intelligence, 20, 163, 10.1016/j.engappai.2006.06.009
Kamat, 2003, Validating complex construction simulation models using 3D visualization, Systems Analysis Modelling Simulation, 43, 455, 10.1080/02329290290028507
Kang, 2009, Three-dimensional simulation and visualization of crane assisted construction erection processes, Journal of Computing in Civil Engineering, 23, 363, 10.1061/(ASCE)0887-3801(2009)23:6(363)
Kenley, R., Seppanen, O. (2009). Location based management of construction projects: part of a new typology for project scheduling methodologies. In Proceedings of the 2009 winter simulation conference, 13–16 December, Austin, TX.
Koskela, L., 1992. Application of the new production philosophy to construction. Technical Report No. 72, Center for Integrated Facilities Engineering (CIFE), Stanford University.
Lee, 2011, An expert system for auditing quality management systems in construction, Computer-Aided Civil and Infrastructure Engineering, 26, 612, 10.1111/j.1467-8667.2011.00721.x
Lee, 2010, Integrated simulation system for construction operation and project scheduling, Journal of Computing in Civil Engineering, 24, 557, 10.1061/(ASCE)CP.1943-5487.0000061
Lu, W., & Olofsson, T. (2009). A continuous flow simulation model for probability repetitive projects. In Proceedings of the 5th Nordic conference on construction economics and organisation, 10–12 June, Reykjavík, Iceland.
Lucko, 2008, Harnessing the power of simulation in the project management/decision support aspects of the construction industry
Marlewski, 2000, A CAS aid to the elaboration of the expert system supporting the managing the monolithic construction, Mathematics and Computers in Simulation, 51, 483, 10.1016/S0378-4754(99)00138-X
Mohamed, 2002, Knowledge based-system for alternative design, cost estimating and scheduling, Knowledge-Based Systems, 15, 177, 10.1016/S0950-7051(01)00155-1
Mohan, 1990, Expert systems applications in construction management and engineering, Journal of Construction Engineering and Management-Asce, 116, 87, 10.1061/(ASCE)0733-9364(1990)116:1(87)
Moselhi, 1990, Hybrid expert system for construction planning and scheduling, Journal of Construction Engineering and Management-Asce, 116, 221, 10.1061/(ASCE)0733-9364(1990)116:2(221)
Motawa, 2013, A knowledge-based BIM system for building maintenance, Automation in Construction, 29, 173, 10.1016/j.autcon.2012.09.008
Oluwoye, J. (2012). Development PLANRIGHT: A conceptual knowledge-based expert system program as a tool for decision support for planning construction projects. In Proceedings of the world automation congress (WAC), 24–28 June, Puerto Vallarta, Mexico.
Pham, 1999, Artificial intelligence in engineering, International Journal of Machine Tools and Manufacture, 39, 937, 10.1016/S0890-6955(98)00076-5
Rojas, 2003, Modeling the construction management process to support situational simulations, Journal of Computing in Civil Engineering, 17, 273, 10.1061/(ASCE)0887-3801(2003)17:4(273)
Shaked, 1992, CONSCHED – expert system for scheduling of modular construction projects, Journal of Construction Engineering and Management-Asce, 118, 488, 10.1061/(ASCE)0733-9364(1992)118:3(488)
Tantisevi, 2009, Transformation of a 4D product and process model to generate motion of mobile cranes, Automation in Construction, 18, 458, 10.1016/j.autcon.2008.10.008
Thabet, 1997, SCaRC: Space-constrained resource-constrained scheduling system, Journal of Computing in Civil Engineering, 11, 48, 10.1061/(ASCE)0887-3801(1997)11:1(48)
Tommelein, 1997
van der Aalst, 2000, Dealing with workflow change: Identification of issues and solutions, Computer Systems Science and Engineering, 15, 267
Waly, 2003, A virtual construction environment for preconstruction planning, Automation in Construction, 12, 139, 10.1016/S0926-5805(02)00047-X
Zhang, 2002, Hybrid intelligence utilization for construction site layout, Automation in Construction, 11, 511, 10.1016/S0926-5805(01)00071-1