Fixture workspace synthesis for reconfigurable assembly using procrustes-based pairwise configuration optimization

Journal of Manufacturing Systems - Tập 25 - Trang 25-38 - 2006
Zhenyu Kong1
1School of Industrial Engineering and Management, Oklahoma State University, Stillwater, Oklahoma, USA

Tài liệu tham khảo

Apley, 1998, Diagnosis of multiple fixture faults in panel assembly, ASME Journal of Mfg. Science and Engg., v120, 793, 10.1115/1.2830222 Asada, 1985, Kinematic analysis of workpart fixturing for flexible assembly with automatically reconfigurable fixtures, IEEE Journal of Robotics and Automation, vRA-1, 86, 10.1109/JRA.1985.1087007 Cai, 1996, Deformable sheet metal fixturing: principles, algorithms, and simulations, ASME Trans., Journal of htfg. Science and Engg., v118, 318, 10.1115/1.2831031 Ceglarek, 1998, Multivariate analysis and evaluation of adaptive sheet metal assembly systems, Annals of the CIRP, v47, 17, 10.1016/S0007-8506(07)62776-0 Ceglarek, 1995, Dimensional variation reduction for automotive body assembly, Mfg. Review, v8, 139 Ceglarek, 1996, Fixture failure diagnosis for auto body assembly using pattern recognition, ASMF Trans., Journal of Engg. for Industry, v118, 55, 10.1115/1.2803648 Chou, 1989, A mathematical approach to automatic configuration of machining Fixtures: analysis and synthesis, ASME Trans., Journal of Engg. for Industry, v111, 299, 10.1115/1.3188764 Crosilla, 1999, Procrustes analysis and geodetic science De Meter, 1995, Min-max load model for optimizing machining fixture performance, ASME Trans., Journal of Engg. for Industry, v117, 186, 10.1115/1.2803293 Ding, 2002, Diagnosability analysis of multistage manufacturing processes, ASME Trans., Journal of Dynamic Systems, Measurement, and Control, v124, 1, 10.1115/1.1435645 Dryden, 1998 Gupta, 1998, Product family-based assembly sequence design methodology, IIE Trans., v30, 933, 10.1080/07408179808966547 Hu, 1997, Stream-of-variation theory for automotive body assemblies, Annals of the CIRP, v46, 1, 10.1016/S0007-8506(07)60763-X Hu, 1992, Identifying root causes of variation in automobile body assembly using principal component analysis, Transactions of NAMEI/SME, v20, 311 Kong, 2003, Rapid deployment of reconfigurable assembly fixtures using workspace synthesis and visibility analysis, Annals of the CIRP, v52, 13, 10.1016/S0007-8506(07)60519-8 Koren, 1999, Reconfigurable manufacturing systems, Annals of the CIRP, v48, 10.1016/S0007-8506(07)63232-6 Lee, 1999, Workspace synthesis for flexible fixturing of stampings, ASME Trans., Journal of Mfg. Science and Engg., v121, 478, 10.1115/1.2832706 Menassa, 1991, Optimization methods applied to selecting support positions in fixture design, ASME Trans., Journal of Engg. for Industry, v113, 412, 10.1115/1.2899715 Moon, 1992, Improved image information via Proerustes analysis, Quality Assurance, v56, 139 Park, 2002, Three-dimensional localization of thin-walled sheet metal parts for robotic assembly, Journal of Robotic Systems, v19, 207, 10.1002/rob.10035 Rekiek, 2000, Designing mixedproduct assembly lines, IEEE Trans. on Robotics and Automation, v16, 268, 10.1109/70.850645 Rong, 1996, Machining accuracy analysis for computer aided fixture design verification, ASME Trans. on Journal of Mfg. Science and Engg., v118, 289, 10.1115/1.2831028 Roy, 1994, Selection of preliminary locating and clamping positions on a workspece for an automatic fixture design system, Computer Integrated Mfg. Systems, v7, 161, 10.1016/0951-5240(94)90035-3 Sakurai, 1992, Automatic setup planning and fixture design for machining, Journal of Manufacturing Systems, v11, 30, 10.1016/0278-6125(92)90015-8 Stadzisz, 1998, An integrated approach for the design of multi-product assembly systems, Computers in Industry, v36, 21, 10.1016/S0166-3615(97)00094-8 Travaini, 2002, Methodological approach and reconfiguration tool for assembly systems, Annals of the CIRP, v51, 9, 10.1016/S0007-8506(07)61455-3