Feedback on a shared big dataset for intelligent TBM Part II: Application and forward look

Underground Space (China) - Tập 11 - Trang 26-45 - 2023
Jian-Bin Li1, Zu-Yu Chen2, Xu Li3, Liu-Jie Jing4, Yun-Pei Zhang2, Hao-Han Xiao2, Shuang-Jing Wang4, Wen-Kun Yang5, Lei-Jie Wu3, Peng-Yu Li4, Hai-Bo Li3, Min Yao3, Li-Tao Fan6
1China Railway Group Co. Ltd., Beijing 100089, China
2Department of Geotechnical Engineering, China Institute of Water Resources and Hydropower Research, Beijing 100038, China
3Key Laboratory of Urban Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing 100044, China
4China Railway Engineering Equipment Group Co., Ltd., Zhengzhou, Henan 450016, China
5School of Civil Engineering, Southeast University, Nanjing, 211189, China
6Xi'an University of Technology, Xi'an 710048, China

Tài liệu tham khảo

Alber, 2000, Advance rates of hard rock TBMs and their effects on project economics, Tunnelling and underground space technology, 15, 55, 10.1016/S0886-7798(00)00029-8 Barton, 2000 Barton, 1999, TBM performance estimation in rock using QTBM, Tunnels and Tunnelling International, 31, 30 Barton, 1974, Engineering classification of rock masses for the design of tunnel support, Rock Mechanics, 6, 189, 10.1007/BF01239496 Beam, 2020, Challenges to the reproducibility of machine learning models in health care, Journal of the American Medical Association, 323, 305, 10.1001/jama.2019.20866 Bieniawski, 1973, Engineering classification of jointed rock masses, Civil Engineering= Siviele Ingenieurswese, 1973, 335 Bieniawski, 1989 Bieniawski, Z.T., Celada, B., & Galera, J.M. (2007). TBM excavability: Prediction and machine and rock interaction. In Proceedings of Rapid Excavation and Tunnelling Conferences (RETC). June 2007, Toronto, Canada, 1118–1130. Bruland, A. (1998). Hard rock tunnel boring. [Doctoral dissertation, Norwegian University of Science and Technology, Norway]. Büchi, E. (1984). Einfluss Geologischer Parameter auf die Vortriebsleistung einer Tunnelbohrmaschine. [Doctoral dissertation, University of Bern, Switzerland]. (in German). Chen, 2019, Prediction of maximum surface settlement caused by earth pressure balance (EPB) shield tunneling with ANN methods, Soils and Foundations, 59, 284, 10.1016/j.sandf.2018.11.005 Chen, 2021, Diagnosing tunnel collapse sections based on TBM tunneling big data and deep learning: A case study on the Yinsong Project, China. Tunnelling and Underground Space Technology, 108 Delisio, A. (2014). Field and numerical studies on the causes and effects of blocky rock conditions on TBM tunnelling. [Doctoral dissertation, École Polytechnique Fédérale de Lausanne, Switzerland]. Delisio, A., & Zhao, J. (2011). Qualitative evaluation of the influence of blocky grounds on TBMs performances in deep Alpine tunnels. In Proceedings of the 12th ISRM International Congress on Rock Mechanics. 18–21 Oct, Beijing, China. Delisio, 2014, A new model for TBM performance prediction in blocky rock conditions, Tunnelling and Underground Space Technology, 43, 440, 10.1016/j.tust.2014.06.004 Delisio, 2013, Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel, Tunnelling and Underground Space Technology, 33, 131, 10.1016/j.tust.2012.06.015 Farmer, 1980, Mechanics of disc cutter penetration, Tunnels and Tunnelling International, 12, 22 Farrokh, 2020, A study of various models used in the estimation of advance rates for hard rock TBMs, Tunnelling and Underground Space Technology, 97, 10.1016/j.tust.2019.103219 Farrokh, 2011, Analysis of unit supporting time and support installation time for open TBMs, Rock mechanics and rock engineering, 44, 431, 10.1007/s00603-011-0135-8 Farrokh, 2012, Study of various models for estimation of penetration rate of hard rock TBMs, Tunnelling and Underground Space Technology, 30, 110, 10.1016/j.tust.2012.02.012 Feng, 2021, Tunnel boring machines (TBM) performance prediction: A case study using big data and deep learning, Tunnelling and Underground Space Technology, 110, 10.1016/j.tust.2020.103636 Frenzel, C. (2011). Disc cutter wear phenomenology and their implications on disc cutter consumption for TBM. In 45th U.S. Rock Mechanics/Geomechanics Symposium. 26–29 June, San Francisco, California, USA. Gao, 2021, TBM penetration rate prediction based on the long short-term memory neural network, Underground Space, 6, 718, 10.1016/j.undsp.2020.01.003 Gong, Q. M. (2006). Development of a rock mass characteristics model for TBM penetration rate prediction. [Doctoral dissertation, Nanyang Technological University]. Singapore. Gong, 2021, A modified rock mass classification system for TBM tunnels and tunneling based on the HC method of China, International Journal of Rock Mechanics and Mining Sciences, 137, 10.1016/j.ijrmms.2020.104551 Gong, 2021, Preliminary classification of fault zone based on fault zone influence on TBM tunnel construction, Journal of the China Railway Society, 43, 153 Gong, 2009, Development of a rock mass characteristics model for TBM penetration rate prediction, International journal of Rock mechanics and mining sciences, 46, 8, 10.1016/j.ijrmms.2008.03.003 Graham, 1976, Rock exploration for machine manufacturers, 173 Guo, 2022, Intelligent assistant driving method for tunnel boring machine based on big data, Acta Geotechnica, 17, 1019, 10.1007/s11440-021-01327-1 Guo, 2022, Advance prediction of collapse for TBM tunneling using deep learning method, Engineering Geology, 299, 10.1016/j.enggeo.2022.106556 Hamidi, 2010, Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system, Tunnelling and Underground Space Technology, 25, 333, 10.1016/j.tust.2010.01.008 Hassanpour, 2011, A new hard rock TBM performance prediction model for project planning, Tunnelling and Underground Space Technology, 26, 595, 10.1016/j.tust.2011.04.004 Hassanpour, 2010, TBM performance analysis in pyroclastic rocks: A case history of Karaj water conveyance tunnel, Rock mechanics and rock engineering, 43, 427, 10.1007/s00603-009-0060-2 Hoek, 1995 Hou, 2022, Early warning of tunnel collapse based on Adam-optimised long short-term memory network and TBM operation parameters, Engineering Applications of Artificial Intelligence, 112, 10.1016/j.engappai.2022.104842 Hou, 2020, Dynamic prediction of rock mass classification in the tunnel construction process based on random forest algorithm and TBM in situ operation parameters, 570, 052056 Hou, 2022, Real-time prediction of rock mass classification based on TBM operation big data and stacking technique of ensemble learning, Journal of Rock Mechanics and Geotechnical Engineering, 14, 123, 10.1016/j.jrmge.2021.05.004 Huo, 2010, Optimal disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on a multi-objective genetic algorithm, Journal of Mechanical Science and Technology, 24, 521, 10.1007/s12206-009-1220-8 Innaurato, N., Mancini, A., Rondena, E., & Zaninetti, A. (1991). Forecasting and effective TBM performances in a rapid excavation of a tunnel in Italy. In Proceedings of 7th ISRM International Congress on Rock Mechanics. 16–20 September, Aachen, Germany. Jing, 2021, A TBM advance rate prediction method considering the effects of operating factors, Tunnelling and Underground Space Technology, 107, 10.1016/j.tust.2020.103620 Karami, 2021, Introducing an empirical model for prediction of disc cutter life for TBM application in jointed rocks: Case study, Kerman water conveyance tunnel, Bulletin of Engineering Geology and the Environment, 80, 3853, 10.1007/s10064-021-02166-w Kim, 2001, Neural network based prediction of ground surface settlements due to tunnelling, Computers and Geotechnics, 28, 517, 10.1016/S0266-352X(01)00011-8 Kohestani, 2017, Prediction of maximum surface settlement caused by earth pressure balance shield tunneling using random forest, Journal of Artificial Intelligence and Data Mining, 5, 127 Laughton, C. (1998). Evaluation and prediction of tunnel boring machine performance in variable rock masses. [Doctoral dissertation, University of Texas at Austin, USA]. Li, 2020, Research on prediction of TBM driving parameters based on deep learning, Modern Tunnelling Technology, 57, 154 Li, 2021, TBM tunneling parameters prediction based on Locally Linear Embedding and Support Vector Regression, Journal of Zhejiang University (Engineering Science), 55, 1426 Li, 2021, Advanced prediction of tunnel boring machine performance based on big data, Geoscience Frontiers, 12, 331, 10.1016/j.gsf.2020.02.011 Li, 2019, Weighted voting model for advanced intelligent perception of tunnel faults based on TBM rock-machine information, Chinese Journal of Rock Mechanics and Engineering, 39, 3403 Li, 2017, Rock burst prediction based on genetic algorithms and extreme learning machine, Journal of Central South University, 24, 2105, 10.1007/s11771-017-3619-1 Liu, 2019, Improved support vector regression models for predicting rock mass parameters using tunnel boring machine driving data, Tunnelling and Underground Space Technology, 91, 10.1016/j.tust.2019.04.014 Liu, 2020, Prediction of rock mass parameters in the TBM tunnel based on BP neural network integrated simulated annealing algorithm, Tunnelling and Underground Space Technology, 95, 10.1016/j.tust.2019.103103 Liu, 2021, Intelligent decision method for main control parameters of tunnel boring machine based on multi-objective optimization of excavation efficiency and cost, Tunnelling and Underground Space Technology, 116, 10.1016/j.tust.2021.104054 Liu, 2017, A case study of TBM performance prediction using a Chinese rock mass classification system–Hydropower Classification (HC) method, Tunnelling and Underground Space Technology, 65, 140, 10.1016/j.tust.2017.03.002 Liu, 2017, A wear rule and cutter life prediction model of a 20-in. TBM cutter for granite: A case study of a water conveyance tunnel in China, Rock Mechanics and Rock Engineering, 50, 1303, 10.1007/s00603-017-1176-4 Liu, 2020, Prediction model of rock mass class using classification and regression tree integrated AdaBoost algorithm based on TBM driving data, Tunnelling and Underground Space Technology, 106, 10.1016/j.tust.2020.103595 Liu, 2021, Back analysis of the TBM collapse section based on convolutional neural networks, Chinese Journal of Solid Mechanics, 42, 287 Liu, 2021, Hard-rock tunnel lithology prediction with TBM construction big data using a global-attention-mechanism-based LSTM network, Automation in Construction, 125, 10.1016/j.autcon.2021.103647 Luo, 2018, Advance rate of TBM based on field boring data, Journal of Zhejiang University (Engineering Science), 52, 1566 Mahdevari, 2012, Prediction of tunnel convergence using artificial neural networks, Tunnelling and Underground Space Technology, 28, 218, 10.1016/j.tust.2011.11.002 Mahdevari, 2014, A support vector regression model for predicting tunnel boring machine penetration rates, International Journal of Rock Mechanics and Mining Sciences, 72, 214, 10.1016/j.ijrmms.2014.09.012 Mahdevari, 2012, Application of artificial intelligence algorithms in predicting tunnel convergence to avoid TBM jamming phenomenon, International Journal of Rock Mechanics and Mining Sciences, 55, 33, 10.1016/j.ijrmms.2012.06.005 Nelson, P. (1983). Tunnel boring machine performance in sedimentary rock. [Doctoral dissertation, Colorado School of Mines, USA]. Nelson, 1985, TBM performance prediction using rock fracture parameters, International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts, 22, 189, 10.1016/0148-9062(85)93234-6 Pineau, 2021, Improving reproducibility in machine learning research (a report from the NeurIPS 2019 reproducibility program), Journal of Machine Learning Research, 22, 7459 Ribacchi, 2005, Influence of rock mass parameters on the performance of a TBM in a gneissic formation (Varzo Tunnel), Rock mechanics and rock engineering, 38, 105, 10.1007/s00603-004-0032-5 Rostami, J. (1991). Design optimization, performance prediction, and the economic analysis of TBM application for the construction of proposed Yucca Mountain nuclear waste repository. [Master’s thesis, Colorado School of Mines, USA]. Rostami, J., & Ozdemir, L. (1993). A new model for performance prediction of hard rock TBMs. In Proceedings of the Rapid Excavation and Tunneling Conference. 13–17 June, Boston, USA. Rostami, J. (1997). Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. [Doctoral dissertation, Colorado School of Mines, USA]. Rostami, 2016, Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground, Tunnelling and Underground Space Technology, 57, 173, 10.1016/j.tust.2016.01.009 Salimi, 2017, Evaluating the suitability of existing rock mass classification systems for TBM performance prediction by using a regression tree, Procedia Engineering, 191, 299, 10.1016/j.proeng.2017.05.185 Sen, 2003, Modified rock mass classification system by continuous rating, Engineering Geology, 67, 269, 10.1016/S0013-7952(02)00185-0 Suwansawat, 2006, Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling, Tunnelling and underground space technology, 21, 133, 10.1016/j.tust.2005.06.007 Terzaghi, K. (1946). Rock defects and loads on tunnel supports. Rock tunnelling with steel supports. von Preinl, 2006, Rock mass excavability indicator: New way to selecting the optimum tunnel construction method, Tunnelling and Underground Space Technology, 21, 237, 10.1016/j.tust.2005.12.016 Wang, 2020, A TBM cutter life prediction method based on rock mass classification, KSCE Journal of Civil Engineering, 24, 2794, 10.1007/s12205-020-1511-2 Wang, 2021, An integrated parameter prediction framework for intelligent TBM excavation in hard rock, Tunnelling and Underground Space Technology, 118, 10.1016/j.tust.2021.104196 Wei, R. L (2022). Research on TBM rock mass information perception, early warning and control parameter optimization based on machine learning. [Doctoral dissertation, WuHan University]. Wuhan, China. Xiao, 2022, Significance and methodology: Preprocessing the big data for machine learning on TBM performance, Underground Space, 7, 680, 10.1016/j.undsp.2021.12.003 Xiong, 2014, Research on prediction of rating of rockburst based on BP neural network, The Open Civil Engineering Journal, 8, 463, 10.2174/1874149501408010463 Xu, 2021, Prediction of tunnel boring machine operating parameters using various machine learning algorithms, Tunnelling and Underground Space Technology, 109, 10.1016/j.tust.2020.103699 Xu, 2019, A tool breakage monitoring method for end milling based on the indirect electric data of CNC system, The International Journal of Advanced Manufacturing Technology, 101, 419, 10.1007/s00170-018-2735-x Zhang, 2019, Prediction of geological conditions for a tunnel boring machine using big operational data, Automation in Construction, 100, 73, 10.1016/j.autcon.2018.12.022 Zhang, 2023, Cross-project prediction for rock mass using shuffled TBM big dataset and knowledge-based machine learning methods, Science China Technological Sciences, 1 Zhao, 2019, A data-driven framework for tunnel geological-type prediction based on TBM operating data, IEEE Access, 7, 66703, 10.1109/ACCESS.2019.2917756 Zhou, 2020, Predicting boring parameters of TBM stable stage based on BLSTM networks combined with attention mechanism, Chinese Journal of Rock Mechanics and Engineering, 39, 3505 Zhu, 2019, Challenges and development prospects of ultra-long and ultra-deep mountain tunnels, Engineering, 5, 384, 10.1016/j.eng.2019.04.009 Zhu, 2021, Performance Evaluation Indicator (PEI): A new paradigm to evaluate the competence of machine learning classifiers in predicting rock mass conditions, Advanced Engineering Informatics, 47, 10.1016/j.aei.2020.101232 Zhu, 2020, Study on CART-based ensemble learning algorithms for predicting TBM tunneling parameters and classing surrounding rock masses, Chinese Journal of Rock Mechanics and Engineering, 39, 1860