Fast reactive scheduling to minimize tardiness penalty and energy cost under power consumption uncertainties

Computers & Industrial Engineering - Tập 66 - Trang 406-417 - 2013
Cao Vinh Le1, Chee Khiang Pang1
1Department of Electrical and Computer Engineering, National University of Singapore, Singapore

Tài liệu tham khảo

Abazari, 2012, Optimum loading of machines in a flexible manufacturing system using a mixed-integer linear mathematical programming model and genetic algorithm, Computers & Industrial Engineering, 62, 469, 10.1016/j.cie.2011.10.013 Abdelaziz, 2011, A review on energy saving strategies in industrial sector, Renewable & Sustainable Energy Reviews, 15, 150, 10.1016/j.rser.2010.09.003 Armbruster, 2012 Bachman, 2000 Bogdan, 2006 Chan, 2008, Comparative performance analysis of a flexible manufacturing system (FMS): A review-period-based control, International Journal of Production Research, 46, 1, 10.1080/00207540500521188 Chan, 2012, A decision-information-synchronisation perspective on the performance of FMS, International Journal of Production Research, 50, 1203, 10.1080/00207543.2011.558129 Chiang, 2013, Enhancing rule-based scheduling in wafer fabrication facilities by evolutionary algorithms: Review and opportunity, Computers & Industrial Engineering, 64, 524, 10.1016/j.cie.2012.08.009 Choi, 2012, Flexible flow shop scheduling with stochastic processing times: A decomposition-based approach, Computers & Industrial Engineering, 63, 362, 10.1016/j.cie.2012.04.001 Christou, 2012 Datta, 2011 Du, 2011, Preference vector ant colony system for minimizing make-span and energy consumption in a hybrid flow shop Fang, 2013, Parallel-machine scheduling to minimize tardiness penalty and power cost, Computers & Industrial Engineering, 64, 224, 10.1016/j.cie.2012.10.002 He, 2012, Scheduling flexible job shop problem subject to machine breakdown with route changing and right-shift strategies, The International Journal of Advanced Manufacturing Technology Horng, 2012, Evolutionary algorithm for stochastic job shop scheduling with random processing time, Expert Systems with Applications, 39, 3603, 10.1016/j.eswa.2011.09.050 Huang, 2012, Scheduling FMS with alternative routings using petri nets and near admissible heuristic search, The International Journal of Advanced Manufacturing Technology, 63, 1131, 10.1007/s00170-012-3958-x Kalpakjian, 2006 Ko, 2010, Dispatching rule for non-identical parallel machines with sequence-dependent setups and quality restrictions, Computers & Industrial Engineering, 59, 448, 10.1016/j.cie.2010.05.017 Le, C. V., Pang, C. K., Lewis, F. L., Gan, O. P., Chan, H. L. (2011). Intelligent dynamic resource assignment for energy-efficiency in industrial stamping machines. In Proceedings of the 37th annual conference of the IEEE industrial electronics society (pp. 4131–4136), Melbourne, Australia (invited). Mouelhi-Chibani, 2010, Training a neural network to select dispatching rules in real time, Computers & Industrial Engineering, 58, 249, 10.1016/j.cie.2009.03.008 Ouelhadj, 2009, A survey of dynamic scheduling in manufacturing systems, Journal of Scheduling, 12, 417, 10.1007/s10951-008-0090-8 Pang, C. K., Hudas, G. R., Mikulski, D. G., Le, C. V., Lewis, F. L. (2013). Discrete event command and control of asymmetric large-scale armed forces using network centric warfare. International Journal of Intelligent Unmanned Systems (submitted for publication). Pang, 2011 Papadimitriou, 1998 Pinedo, 2005 Prakash, 2008, Modified immune algorithm for job selection and operation allocation problem in flexible manufacturing systems, Advances in Engineering Software, 39, 219, 10.1016/j.advengsoft.2007.01.024 Sule, 2007 Tay, 2008, Evolving dispatching rules using genetic programming for solving multi-objective flexible job-shop problems, Computers & Industrial Engineering, 54, 453, 10.1016/j.cie.2007.08.008 Vieira, 2003, Rescheduling manufacturing systems: A framework of strategies, policies and methods, Journal of Scheduling, 6, 36, 10.1023/A:1022235519958 Xiong, 2012, Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns, International Journal of Production Economics, 41, 112, 10.1016/j.ijpe.2012.04.015 Xu, 2011, Survey of modeling, planning, and ground verification of space robotic systems, Acta Astronautica, 68, 1629, 10.1016/j.actaastro.2010.12.004