Factors influencing immigrants’ satisfaction in Danjiangkou Reservoir based on logistic regression model

Water Policy - Tập 18 Số 6 - Trang 1384-1398 - 2016
Yuanfeng Qiu1, Ge Meng2, Yongping Wei3
1School of Water Resources and Hydropower Engineering, Wuhan University, Wuhan, 430072, China
2School of Resource and Civil Engineering, Wuhan Institute of Technology, Wuhan 430073, China
3University of Queensland, Queensland 4072, Australia

Tóm tắt

Findings from a prospective study of project-induced migration along the middle route of the South-to-North Water Diversion Project in China are reported. The study seeks to identify the key factors influencing differences in immigrants’ satisfaction, from their own characteristics, family income, production conditions, living conditions, social conditions, resource conditions, and environment, using Danjiangkou Reservoir as the case study area. A questionnaire survey data with a large sample (1,031 immigrant households in the Danjiangkou Reservoir) was used for the logistic model. Analysis indicated that variables such as immigrants’ family income, as in ‘per capita net income’; immigrants’ production conditions, such as ‘quality of cultivated land’; immigrants’ living conditions, such as ‘infrastructure’; and immigrants’ social conditions, such as ‘the implementation of immigration policy’ in the case reservoir model are the most important factors that affect the immigrants’ satisfaction. The degree of importance of ‘per capita net income’, ‘quality of cultivated land’, ‘infrastructure’, and ‘the implementation of immigration policy’ was 14.8%, 16.0%, 9.2%, and 8.1%, respectively. Considering the practical implications of this research, identifying factors affecting immigrants’ satisfaction with the reservoir resettlement relocation experience could be useful for policymakers designing immigration programs.

Từ khóa


Tài liệu tham khảo

Amit, 2010, Determinants of life satisfaction among immigrants from Western countries and from the FSU in Israel, Social Indicators Research, 96, 515, 10.1007/s11205-009-9490-1

Cernea, 2000, Risk and Reconstruction: Experiences of Resettlers and Refuges, 10.1596/0-8213-4444-7

Chen, 2015, Perspectives of officials in land acquisition for hydropower projects and their influence on migrant satisfaction, Journal of Tsinghua University (Science and Technology), 55, 46

Fan, 2010, Water resources utilization based on sustainable ecosystems, Practice of Jingsha River Hydropower Development. Journal of Hydroelectric Engineering, 29, 1

Fuggle R. Smith W. T. (2000). Large Dams in Water and Energy Resource Development in the People's Republic of China (PRC). WCD country review paper. Hydrosult Canada Inc., Cape Town.

Grenier, 2011, Canadian immigrants’ access to a first job in their intended occupation, International Migration & Integration, 12, 275

Houle R. Schellenberg G. (2010). New Immigrants’ Assessments of their Life in Canada. Statistics Canada Analytical Branch Studies. Working Paper No. 322.

Karimi, 2005, Post-project review on a resettlement programme of the Kotapanjang dam project in Indonesia, International Journal of Water Resources Development, 21, 371, 10.1080/07900620500038147

Lin, 2011, Think about the group event from migrants living in reservoir area under the rule of law, Journal of Chinese People's Public Security University (Social Science Edition), 3, 127

Liu, 2009, Use the scientific development outlook to guide immigration and accelerate the construction of socialist and harmonic society, Journal of Hydroelectric Engineering, 28, 192

Liu, 2012, A new assessment method for comprehensive impact of hydropower development on runoff and sediment changes, Journal of Geographical Sciences, 22, 1034, 10.1007/s11442-012-0981-7

Obucina, 2013, The patterns of satisfaction among immigrants in Germany, Social Indicators Research, 113, 1105, 10.1007/s11205-012-0130-9

Sapeha, 2015, Explaining variations in immigrants’ satisfaction with their settlement experience, Journal of International Migration & Integration, 16, 891, 10.1007/s12134-014-0371-3

Scudder, 2005, The Future of Large Dams

Shi, 2013, Study on ecological migration willingness and its influencing factors: a case of Ankang, Shanxi, Journal of China Agricultural University, 18, 218

Swainson, 2008, Compensating for development: Oorang Asli experiences of Malaysia's Sungai Selangor dam, Asia Pacific Viewpoint, 49, 155, 10.1111/j.1467-8373.2008.00367.x

Takesada, 2009, Japanese experience of involuntary resettlement: long-term consequences of resettlement for the construction of the Ikawa Dam, International Journal of Water Resources Development, 25, 419, 10.1080/07900620902965459

Tang, 2012, Ecological migration effects on the Tianchi scenic area in Xinjiang: from the perspective of migrant farmer families, Journal of Arid Land, 4, 95, 10.3724/SP.J.1227.2012.00095

Valipour, 2014, Drainage, waterlogging, and salinity, Archives of Agronomy and Soil Science, 60, 1625, 10.1080/03650340.2014.905676

Valipour, 2014, Future of the area equipped for irrigation, Archives of Agronomy and Soil Science, 60, 1641, 10.1080/03650340.2014.905675

Valipour, 2015, A comprehensive study on irrigation management in Asia and Oceania, Archives of Agronomy and Soil Science, 61, 1247, 10.1080/03650340.2014.986471

Valipour, 2015, Future of agricultural water management in Africa, Archives of Agronomy and Soil Science, 61, 907, 10.1080/03650340.2014.961433

Wang, 2014, Investigation on reservoir resettlement’ satisfaction, Journal of Hydroelectric Engineering, 33, 261

Wilmsen, 2011, Progress, problems, and prospects of dam-induce displacement and resettlement in China, China Information, 25, 149, 10.1177/0920203X11407544

World Commission on Dams (WCD), 2000, Dam and Development

Xu, 2010, College students to participate in resident's medical treatment insurance: analysis on the logit model, Journal of the Graduate School of Zhongnan University of Economics and Law, 5, 20

Xue, 2010, Statistical Analysis and Application

Yoshida, 2013, A long-term evaluation of families affected by the Bili-Bili Dam development resettlement project in South Sulawesi, Indonesia, International Journal of Water Resources Development, 29, 50, 10.1080/07900627.2012.738495

Zhang, 2013, The influence of large dams building on resettlement in the Upper Mekong River, Journal of Geographical Sciences, 23, 947, 10.1007/s11442-013-1054-2

Zhang, 2014, FA-based evaluation on post-stage support satisfaction degree of reservoir resettlement, Water Power, 40, 9

Zheng, 2013, Satisfaction evaluation and influencing factors analysis of the implementation of large and medium-sized reservoir resettlement later stage support policy, Water Power, 39, 1

Zuberi, 2012, In search of a better life: the experiences of working poor immigrants in Vancouver, Canada, International Migration, 50, 60, 10.1111/j.1468-2435.2010.00659.x