Bai, 2006
Bai, 2004, Numerical simulation study of stability of narrow coal pillar of roadway driven along the goaf, Chin. J. Rock Mech. Eng., 20, 3475
Fan, 2014, Non-harmonious deformation controlling of gob-side entry in thin coal seam under dynamic pressure, J. Rock Mech. Geotech. Eng., 6, 269, 10.1016/j.jrmge.2014.05.001
Jia, 2014, Control technology and deformation law of gob-side entry driving roadway with dynamic pressure and high stress in deep mine, Electron. J. Geotech. Eng., 19, 17667
Jiang, 2017, Numerical approach for goaf-side entry layout and yield pillar design in fractured ground conditions, Rock Mech. Rock Eng., 50, 3049, 10.1007/s00603-017-1277-0
Jin, 2015, Roadway layout for recycling residual coal pillar in room-and-pillar mining of thick coal seam, Int. J. Min. Sci. Tech., 25, 729, 10.1016/j.ijmst.2015.07.005
Kang, 2009, Study on characteristics of underground in-situ stress distribution in Shanxi coal mining fields, Chin. J. Geophys., 52, 1782
Ning, 2017, An innovative support structure for gob-side entry retention in steep coal seam mining, Minerals, 7, 75, 10.3390/min7050075
Shi, 2012, Mechanism discussion on rock bursting caused by coal pillar of s-shaped overlying multi-strata spatial structure, Chin. J. Rock Mech. Eng., 31, 3508
Wang, 2014, Research on roadway layout for recycling residual coal pillar and its control technology, China Coal, 40, 62
Wang, 2017, A novel longwall mining layout approach for extraction of deep coal deposits, Minerals, 7, 60, 10.3390/min7040060
Yang, 2015, Soft roof failure mechanism and supporting method for gob-side entry retaining, Minerals, 5, 10.3390/min5040519
Zhang, 2013, Stability of coal pillar in gob-side entry driving under unstable overlying strata and its coupling support control technique, Int. J. Min. Sci. Tech., 23, 193, 10.1016/j.ijmst.2013.04.020
Zhao, 2017, An innovative longwall mining technology in tangshan coal mine, China, Minerals, 7, 14, 10.3390/min7010014
Zhou, 2014, Study on reasonable arrangement of recovery roadway in residual coal pillar, Coal Technol., 33, 130
Zhang, 2015, An innovative approach for gob-side entry retaining in highly gassy fully-mechanized longwall top-coal caving, Int. J. Rock Mech. Min. Sci., 80, 1, 10.1016/j.ijrmms.2015.09.001