Expansion planning of the North Sea offshore grid: Simulation of integrated governance constraints

Energy Economics - Tập 72 - Trang 376-392 - 2018
João Gorenstein Dedecca1, Sara Lumbreras2, Andrés Ramos2, Rudi A. Hakvoort1, Paulien M. Herder1
1Faculty of Technology, Policy and Management, Delft University of Technology, Jaffalaan 5, 2628BX Delft, The Netherlands
2Institute for Research in Technology, Comillas Pontifical University, Santa Cruz de Marcenado 26, 28015 Madrid, Spain

Tài liệu tham khảo

Belet, 2016 Bevir, 2011, Governance as theory, practice, and dilemma Brown, 2018, PyPSA: python for power system analysis, J. Open Res. Softw., 6, 4, 10.5334/jors.188 Bruninx, 2015 Bustos, 2017, Energy storage and transmission expansion planning: substitutes or complements?, IET Gener. Transm. Distrib. CIGRE, 2013 Conejo, 2016 De Clercq, 2015 Dedecca, 2017 Dedecca, 2016, A review of the North Seas offshore grid modeling: current and future research, Renew. Sust. Energ. Rev., 60, 129, 10.1016/j.rser.2016.01.112 Dedecca, 2017, Transmission expansion simulation for the European Northern Seas offshore grid, Energy, 125 Dedecca, 2017 Delhaute, 2016, Study on regulatory matters concerning the development of the North and Irish Sea offshore energy potential EC, European Commission, 2016 EC, European Commission EC, European Commission, North Seas Countries, 2017 e-Highway2050, 2015 ENTSO-E, European Network of Transmission System Operators for Electricity, 2016 ENTSO-E, European Network of Transmission System Operators for Electricity ENTSO-E, European Network of Transmission System Operators for Electricity ENTSO-E, European Network of Transmission System Operators for Electricity Flament, 2015 Härtel, 2017, Assessing the impact of sampling and clustering techniques on offshore grid expansion planning Härtel, 2017, Review of investment model cost parameters for VSC HVDC transmission infrastructure, Electr. Power Syst. Res., 151, 419, 10.1016/j.epsr.2017.06.008 Hermelink, 2015 Hogan, 2011 Houghton, 2016, Offshore transmission for wind: comparing the economic benefits of different offshore network configurations, Renew. Energy, 94, 268, 10.1016/j.renene.2016.03.038 IIT, Institute for Research in Technology, 2012 IRENA, International Renewable Energy Agency, 2016 Konstantelos, 2017, Integrated North Sea grids: the costs, the benefits and their distribution between countries, Energ Policy, 101, 28, 10.1016/j.enpol.2016.11.024 Kristiansen, 2017, Sensitivity analysis of sampling and clustering techniques in expansion planning models, 1 Kristiansen, 2017 Lumbreras, 2016, The new challenges to transmission expansion planning. Survey of recent practice and literature review, Electr. Power Syst. Res., 134, 19, 10.1016/j.epsr.2015.10.013 Munoz, 2013, Approximations in power transmission planning: implications for the cost and performance of renewable portfolio standards, J. Regul. Econ., 43, 305, 10.1007/s11149-013-9209-8 Nahmmacher, 2016, Carpe diem: a novel approach to select representative days for long-term power system modeling, Energy, 112, 430, 10.1016/j.energy.2016.06.081 Pozo, 2013, If you build it, he will come: anticipative power transmission planning, Energy Econ., 36, 135, 10.1016/j.eneco.2012.12.007 PROMOTioN Pudjianto, 2016, Asymmetric impacts of European transmission network development towards 2050: stakeholder assessment based on IRENE-40 scenarios, Energy Econ., 53, 261, 10.1016/j.eneco.2014.05.003 PwC, Tractebel Engineering, Ecofys, 2016 Rodrigues, 2015, Trends of offshore wind projects, Renew. Sust. Energ. Rev., 49, 1114, 10.1016/j.rser.2015.04.092 Saguan, 2014, Impact of the regulatory framework for transmission investments on the cost of renewable energy in the EU, Energy Econ., 43, 185, 10.1016/j.eneco.2014.02.016 Sargent, 2013, Verification and validation of simulation models, J. Simul., 7, 12, 10.1057/jos.2012.20 Sauma, 2009, Intertemporal planning of transmission expansions in restructured electricity markets, J. Energy Eng., 135, 73, 10.1061/(ASCE)0733-9402(2009)135:3(73) Sauma, 2006, Proactive planning and valuation of transmission investments in restructured electricity markets, J. Regul. Econ., 30, 261, 10.1007/s11149-006-9003-y Scott, 2015, Planning for the future of the electric power sector through regional collaboratives, Electr. J., 28, 83, 10.1016/j.tej.2014.12.002 Tangerås, 2012, Optimal transmission regulation of an integrated energy market, Energy Econ., 34, 1644, 10.1016/j.eneco.2012.01.007 Vafeas, 2015 Vafeas, 2014, e-Highway2050 - modular development plan of the Pan-European transmission system 2050 - D3.1 Van Hertem, 2016 WEC, World Energy Council, 2017 Weise, 2013, e-Highway2050 - modular development plan of the Pan-European transmission system 2050 - annex to D3.1 WindEurope, 2017 WindEurope, 2017 Wiser, 2016, Expert elicitation survey on future wind energy costs, Nat. Energy, 1, 16135, 10.1038/nenergy.2016.135