Estimating hydrological parameters based on rainfall patterns in river basins with no long-term historical observations

Journal of Hydrology - Tập 553 - Trang 651-661 - 2017
Haiyun Shi1,2,3, Tiejian Li2,3
1Department of Civil Engineering, The University of Hong Kong, Hong Kong, China
2State Key Laboratory of Hydroscience and Engineering, Tsinghua University, Beijing, China
3State Key Laboratory of Plateau Ecology and Agriculture, Qinghai University, Xining, Qinghai, China

Tài liệu tham khảo

ASTER GDEM Validation Team, 2011 Athira, 2016, Predictions in ungauged basins: an approach for regionalization of hydrological models considering the probability distribution of model parameters, Stoch. Env. Res. Risk Assess., 30, 1131, 10.1007/s00477-015-1190-6 Bai, 2015, An efficient and comprehensive method for drainage network extraction from DEM with billions of pixels using a size-balanced binary search tree, Geomorphology, 238, 56, 10.1016/j.geomorph.2015.02.028 Bai, 2015, A hierarchical method for managing massive data of drainage networks extracted from high resolution DEM for large scale river basins, Comput. Geosci., 85, 234, 10.1016/j.cageo.2015.06.019 Bardossy, 2007, Calibration of hydrological model parameters for ungauged catchments, Hydrol. Earth Syst. Sci., 11, 703, 10.5194/hess-11-703-2007 Brassel, 1979, A procedure to generate Thiessen polygons, Geog. Anal., 11, 289, 10.1111/j.1538-4632.1979.tb00695.x Bulygina, 2012, Integrating different types of information into hydrological model parameter estimation: application to ungauged catchments and land use scenario analysis, Water Resour. Res., 48, W06519, 10.1029/2011WR011207 Chen, 2015, Optimal parameters for the Green-Ampt infiltration model under rainfall conditions, J. Hydrol. Hydromech., 63, 93, 10.1515/johh-2015-0012 Chinese Academy of Sciences, 1978 Choi, 2015, Multi-site calibration using a grid-based event rainfall–runoff model: a case study of the upstream areas of the Nakdong River basin in Korea, Hydrol. Processes, 29, 2089, 10.1002/hyp.10355 Coff, B.E., Ditty, N.J., Gee, M.C., Szemis, J.M., Maier, H.R., Dandy, G.C., Gibbs, M.S., 2009. Relating catchment attributes to parameters of a salt and water balance model. In: The 18th World IMACS Congress and MODSIM09 International Congress on Modelling and Simulation: Proceedings, pp. 3365–3371. Fuentes-Andino, 2017, Event and model dependent rainfall adjustments to improve discharge predictions, Hydrol. Sci. J., 62, 232, 10.1080/02626667.2016.1183775 Gao, 2017, Assessing the potential of satellite-based precipitation estimates for flood frequency analysis in ungauged or poorly gauged tributaries of China’s Yangtze River basin, J. Hydrol., 550, 478, 10.1016/j.jhydrol.2017.05.025 Garambois, 2017, Hydraulic visibility: using satellite altimetry to parameterize a hydraulic model of an ungauged reach of a braided river, Hydrol. Processes, 31, 756, 10.1002/hyp.11033 Garcia, 2016, Parameter-estimation methods for symmetric stable distributions: application to small samples of spatial fluctuations of rainfall, Spatial Stat., 17, 50, 10.1016/j.spasta.2016.04.001 Holland, 1975 Huang, 2016, Event-based hydrological modeling for detecting dominant hydrological process and suitable model strategy for semi-arid catchments, J. Hydrol., 542, 292, 10.1016/j.jhydrol.2016.09.001 Hundecha, 2008, Regional estimation of parameters of a rainfall-runoff model at ungauged watersheds using the “spatial” structures of the parameters within a canonical physiographic-climatic space, Water Resour. Res., 44, W01427, 10.1029/2006WR005439 Li, 2010, A modified binary tree codification of drainage networks to support complex hydrological models, Comput. Geosci., 36, 1427, 10.1016/j.cageo.2010.04.009 Li, 2011, Dynamic parallelization of hydrological model simulations, Environ. Modell. Software, 26, 1736, 10.1016/j.envsoft.2011.07.015 Li, 2009, Modeling the process of hillslope soil erosion in the Loess Plateau, J. Environ. Inf., 14, 1, 10.3808/jei.200900148 Li, 2012, Suitability of the TRMM satellite rainfalls in driving a distributed hydrological model for water balance computations in Xinjiang catchment, Poyang lake basin, J. Hydrol., 426, 28, 10.1016/j.jhydrol.2012.01.013 Liu, 2010, Dynamic critical rainfall-based torrential flood early warning for medium-small rivers, J. Beijing Normal Univ., 46, 317 Maswood, 2016, Advancing river modelling in ungauged basins using satellite remote sensing: the case of the Ganges-Brahmaputra-Meghna basin, Int. J. River Basin Manage., 14, 103, 10.1080/15715124.2015.1089250 Merz, 2005, Flood frequency regionalisation—spatial proximity vs. catchment attributes, J. Hydrol., 302, 283, 10.1016/j.jhydrol.2004.07.018 Nash, 1970, River flow forecasting through conceptual models part 1 – a discussion of principles, J. Hydrol., 10, 282, 10.1016/0022-1694(70)90255-6 Pappenberger, 2008, New dimensions in early flood warning across the globe using grand-ensemble weather predictions, Geophys. Res. Lett., 35, L10404, 10.1029/2008GL033837 Reshma, 2015, Optimization of calibration parameters for an event based watershed model using genetic algorithm, Water Resour. Manage., 29, 4589, 10.1007/s11269-015-1077-9 Shi, H.Y., 2013. Computation of spatially distributed rainfall by merging raingauge measurements, satellite observations and topographic information: a case study of the 21 July 2012 rainstorm in Beijing, China. The 35th IAHR World Congress, Chengdu, China. Shi, 2011, Modeling and prediction of water loss and soil erosion for high-relief mountainous region: case study of Qamdo region, J. Basic Sci. Eng., 19, 17 Shi, 2015, A service-oriented architecture for ensemble flood forecast from numerical weather prediction, J. Hydrol., 527, 933, 10.1016/j.jhydrol.2015.05.056 Shi, 2016, Physically-based simulation of the streamflow decrease caused by sediment-trapping dams in the middle Yellow River, Hydrol. Processes, 30, 783, 10.1002/hyp.10649 Shi, 2015, Impacts of climate change and hydraulic structures on runoff and sediment discharge in the middle Yellow River, Hydrol. Processes, 29, 3236, 10.1002/hyp.10439 Skaugen, 2015, Use of a parsimonious rainfall-run-off model for predicting hydrological response in ungauged basins, Hydrol. Processes, 29, 1999, 10.1002/hyp.10315 Soulis, 2012, SCS-CN parameter determination using rainfall-runoff data in heterogeneous watersheds - the two-CN system approach, Hydrol. Earth Syst. Sci., 16, 1001, 10.5194/hess-16-1001-2012 Sun, 2012, Calibration of hydrological models in ungauged basins based on satellite radar altimetry observations of river water level, Hydrol. Processes, 26, 3524, 10.1002/hyp.8429 Tang, 2010, Transfer of satellite rainfall uncertainty from gauged to ungauged regions at regional and seasonal time scales, J. Hydrometeorol., 11, 1263, 10.1175/2010JHM1296.1 The Ministry of Water Resources of China (MWR), (2000). Standard for hydrological information and hydrological forecasting SL250-2000. Beijing, China. Thiessen, 1911, Precipitation averages for large areas, Mon. Weather Rev., 39, 1082 Tucker, 2005, An extended AVHRR 8-km NDVI dataset compatible with MODIS and SPOT vegetation NDVI data, Int. J. Remote Sens., 26, 4485, 10.1080/01431160500168686 Wagener, 2006, Parameter estimation and regionalization for continuous rainfall-runoff models including uncertainty, J. Hydrol., 320, 132, 10.1016/j.jhydrol.2005.07.015 Wang, 2015, Watershed sediment dynamics and modeling: a watershed modeling system for Yellow River, 1 Wang, 2007, Digital Yellow River model, J. Hydro-Environ. Res., 1, 1, 10.1016/j.jher.2007.03.001 Wang, 2011, A common parallel computing framework for modeling hydrological processes of river basins, Parallel Comput., 37, 302, 10.1016/j.parco.2011.05.003 Wang, 2012, Maximum speedup ratio curve (MSC) in parallel computing of the binary-tree-based drainage network, Comput. Geosci., 38, 127, 10.1016/j.cageo.2011.05.015 Woldemeskel, 2013, Merging gauge and satellite rainfall with specification of associated uncertainty across Australia, J. Hydrol., 499, 167, 10.1016/j.jhydrol.2013.06.039 Ye, 2012, Forecasting methods for flash floods in medium and small rivers in humid regions and their applications, J. Hohai Univ. (Nat. Sci.), 40, 615 Yin, X.L., 2009. Study on scheduling of main reservoir on Pearl River for estuarine fresh water providing based on digital basin model (Ph.D. dissertation). Department of Hydraulic Engineering, Tsinghua University, Beijing, China (In Chinese). Yoo, 2017, Parameter estimation of the Muskingum channel flood-routing model in ungauged channel reaches, J. Hydrol. Eng., 22, 05017005, 10.1061/(ASCE)HE.1943-5584.0001507 Yu, 2016, Improving the accuracy of flood forecasting with transpositions of ensemble NWP rainfall fields considering orographic effects, J. Hydrol., 539, 345, 10.1016/j.jhydrol.2016.05.047 Zhang, 2016, Double-layer parallelization for hydrological model calibration on HPC systems, J. Hydrol., 535, 737, 10.1016/j.jhydrol.2016.01.024