Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
Tóm tắt
Từ khóa
Tài liệu tham khảo
Adenso-Diaz, 2008, A path-relinking approach for a bi-criteria disassembly sequencing problem, Computers & Operations Research, 35, 3989, 10.1016/j.cor.2007.06.002
Agrawal, 2006, A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem, International Journal of Production Research, 46, 1405, 10.1080/00207540600943985
Akcali, 2008, Analyzing the effects of inventory cost setting rules in a disassembly and recovery environment, International Journal of Production Research, 46, 267, 10.1080/00207540600710962
Akcali, 2009, Network design for reverse and closed-loop supply chains: an annotated bibliography of models and solution approaches, Networks, 53, 231, 10.1002/net.20267
Aksen, 2009, Design and analysis of government subsidized collection systems for incentive-dependent returns, International Journal of Production Economics, 119, 308, 10.1016/j.ijpe.2009.02.012
Aksoy, 2005, Buffer allocation plan for a remanufacturing cell, Computers & Industrial Engineering, 48, 657, 10.1016/j.cie.2003.03.007
Alshamrani, 2007, Reverse logistics: simultaneous design of delivery routes and returns strategies, Computers & Operations Research, 34, 595, 10.1016/j.cor.2005.03.015
Altekin, 2008, Profit-oriented disassembly-line balancing, International Journal of Production Research, 46, 2675, 10.1080/00207540601137207
Amini, 2005, Designing a reverse logistics operation for short cycle time repair services, International Journal of Production Economics, 96, 367, 10.1016/j.ijpe.2004.05.010
Aras, 2008, Locating collection centers for distance- and incentive-dependent returns, International Journal of Production Economics, 111, 316, 10.1016/j.ijpe.2007.01.015
Aras, 2004, The effect of categorizing returned products in remanufacturing, IIE Transactions, 36, 319, 10.1080/07408170490279561
Aras, 2006, Coordination and priority decisions in hybrid manufacturing/remanufacturing systems, Production & Operations Management, 15, 528, 10.1111/j.1937-5956.2006.tb00161.x
Aras, 2008, Locating collection centers for incentive-dependent returns under a pick-up policy with capacitated vehicles, European Journal of Operational Research, 191, 1223, 10.1016/j.ejor.2007.08.002
Ardente, 2003, Eco-sustainable energy and environmental strategies in design for recycling: the software “ENDLESS”, Ecological Modelling, 163, 101, 10.1016/S0304-3800(02)00418-0
Arena, 2003, The environmental performance of alternative solid waste management options: a life cycle assessment study, Chemical Engineering Journal, 96, 207, 10.1016/j.cej.2003.08.019
Atasu, 2006, Lot sizing for optimal collection and use of remanufacturable returns over a finite life-cycle, Production & Operations Management, 15, 473, 10.1111/j.1937-5956.2006.tb00157.x
Bakal, 2006, Effects of random yield in remanufacturing with price-sensitive supply and demand, Production & Operations Management, 15, 407, 10.1111/j.1937-5956.2006.tb00254.x
Bakar, 2007, Computer-aided recycling process planning for end-of-life electrical and electronic equipment, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 221, 1369, 10.1243/09544054JEM801SC
Banda, 2006, To disassemble or not: a computational methodology for decision making, Journal of Intelligent Manufacturing, 17, 621, 10.1007/s10845-006-0022-4
Bandivadekar, 2004, A model for material flows and economic exchanges within the U.S. automotive life cycle chain, Journal of Manufacturing Systems, 23, 22, 10.1016/S0278-6125(04)80004-9
Bao, 2008, Applying the minimum relative entropy method for bimodal distribution in a remanufacturing system, International Journal of Production Economics, 113, 969, 10.1016/j.ijpe.2007.11.010
Barba-Gutierrez, 2008, Lot sizing in reverse MRP for scheduling disassembly, International Journal of Production Economics, 111, 741, 10.1016/j.ijpe.2007.03.017
Barros, 1998, A two-level network for recycling sand: a case study, European Journal of Operational Research, 110, 199, 10.1016/S0377-2217(98)00093-9
Bautista, 2006, Modeling the problem of locating collection areas for urban waste management. An application to the metropolitan area of Barcelona, Omega, 34, 617, 10.1016/j.omega.2005.01.013
Bayindir, 2003, A model to evaluate inventory costs in a remanufacturing environment, International Journal of Production Economics, 81, 597, 10.1016/S0925-5273(02)00271-2
Bayindir, 2005, Assessing the benefits of remanufacturing option under one-way substitution, Journal of the Operational Research Society, 56, 286, 10.1057/palgrave.jors.2601799
Bayindir, 2007, Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint, Computers & Operations Research, 34, 487, 10.1016/j.cor.2005.03.010
Beamon, 2004, Supply-chain network configuration for product recovery, Production Planning & Control, 15, 270, 10.1080/09537280410001697701
Behret, 2009, Performance analysis of a hybrid system under quality impact of returns, Computers & Industrial Engineering, 56, 507, 10.1016/j.cie.2007.11.001
Beltran, 2002, Dynamic lot sizing with returning items and disposals, IIE Transactions, 34, 437, 10.1080/07408170208928881
Bera, 2008, Production- remanufacturing control problem for defective item under possibility constrains, International Journal of Operational Research, 3, 515, 10.1504/IJOR.2008.019166
Bevilacqua, 2007, Development of a sustainable product lifecycle in manufacturing firms: a case study, International Journal of Production Research, 45, 4073, 10.1080/00207540701439941
Bhamra, 2004, Ecodesign: the search for new strategies in product development, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 218, 557, 10.1177/095440540421800509
Bhattacharya, 2006, Optimal order quantities with remanufacturing across new product generations, Production & Operations Management, 15, 421, 10.1111/j.1937-5956.2006.tb00255.x
Bian, 2006, Location analysis of reverse logistics operations for an international electrical manufacturer in Asia Pacific region using the analytic hierarchy process, International Journal of Services Operations and Informatics, 1, 187, 10.1504/IJSOI.2006.010197
Biehl, 2007, Assessing performance and uncertainty in developing carpet reverse logistics systems, Computers & Operations Research, 34, 443, 10.1016/j.cor.2005.03.008
Billatos, 1997
Blanc, 2004, Redesign of a recycling system for LPG-tanks, OR Spectrum, 26, 283, 10.1007/s00291-003-0145-3
Blanc, 2006, Vehicle routing concepts in the closed-loop container network of ARN – a case study, OR Spectrum, 28, 52, 10.1007/s00291-005-0003-6
Bley, 2004, Appropriate human involvement in assembly and disassembly, CIRP Annals – Manufacturing Technology, 53, 487, 10.1016/S0007-8506(07)60026-2
Boks, 2007, Essential perspectives for design for environment. Experiences from the electronics industry, International Journal of Production Research, 45, 4021, 10.1080/00207540701439909
Boon, 2001, Economic impact of aluminum-intensive vehicles on the U.S. automotive recycling infrastructure, Journal of Industrial Ecology, 4, 117, 10.1162/108819800569717
Boon, 2002, Economic sensitivity for end of life planning and processing of personal computers, Journal of Electronics Manufacturing, 11, 81, 10.1142/S0960313102000254
Boon, 2003, End-of-life infrastructure economics for “clean vehicles” in the United States, Journal of Industrial Ecology, 7, 25, 10.1162/108819803766729186
Borchers, 2006, Undergraduate course in environmental design and manufacturing, Journal of Manufacturing Systems, 24, 203, 10.1016/S0278-6125(06)80009-9
Bovea, 2003, Identifying environmental improvement options by combining life cycle assessment and fuzzy set theory, International Journal of Production Research, 41, 593, 10.1080/0020754021000033878
Bovea, 2007, Redesign methodology for developing environmentally conscious products, International Journal of Production Research, 45, 4057, 10.1080/00207540701472678
Brander, 2005, Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes, International Journal of Production Research, 43, 295, 10.1080/0020754042000270403
Bras, 1999, Product, process, and organizational design for remanufacture: an overview of research, Robotics and Computer-Integrated Manufacturing, 15, 167, 10.1016/S0736-5845(99)00021-6
Bufardi, 2004, Multicriteria decision-aid approach for product end-of-life alternative selection, International Journal of Production Research, 42, 3139, 10.1080/00207540410001699192
Carter, 1998, Reverse logistics: a review of the literature and framework for future investigation, Journal of Business Logistics, 19, 85
Chan, 2007, A pro-active and collaborative approach to reverse logistics – a case study, Production Planning & Control, 18, 350, 10.1080/09537280701318736
Chan, 2008, Product end-of-life options selection: grey relational analysis approach, International Journal of Production Research, 46, 2889, 10.1080/00207540601043124
Chan, 2007, Multi-criteria material selections and end-of-life product strategy: grey relational analysis approach, Materials & Design, 28, 1539, 10.1016/j.matdes.2006.02.016
Chanintrakul, 2009, Reverse logistics network design: a state-of-the-art literature review, International Journal of Business Performance and Supply Chain Modelling, 1, 61, 10.1504/IJBPSCM.2009.026266
Chen, 2001, Development of integrated design for disassembly and recycling in concurrent engineering, Integrated Manufacturing Systems, 12, 67, 10.1108/09576060110361555
Ching, 2003, An inventory model with returns and lateral transshipments, Journal of the Operational Research Society, 54, 636, 10.1057/palgrave.jors.2601521
Chouinard, 2008, A stochastic programming approach for designing supply loops, International Journal of Production Economics, 113, 657, 10.1016/j.ijpe.2007.10.023
Chu, 2009, Economical green product design based on simplified computer-aided product structure variation, Computers in Industry, 60, 485, 10.1016/j.compind.2009.02.003
Chung, 2006, Evolutionary sequence planning for selective disassembly in de-manufacturing, International Journal of Computer Integrated Manufacturing, 19, 278, 10.1080/09511920500324647
Chung, 2008, Optimal policy for a closed-loop supply chain inventory system with remanufacturing, Mathematical and Computer Modelling, 48, 867, 10.1016/j.mcm.2007.11.014
Corbacioglu, 2007, Setting the holding cost rates in a two-product system with remanufacturing, International Journal of Production Economics, 109, 185, 10.1016/j.ijpe.2006.12.049
Coulter, 1998, Designing for material separation: lessons from automotive recycling, Journal of Mechanical Design, 120, 501, 10.1115/1.2829179
Cristofari, M., Deshmukh, A., Wang, B., 1996. Green quality function deployment. In: Proceedings of the Fourth International Conference on Environmentally Conscious Design and Manufacturing, Cleveland, Ohio, July 23–25, pp. 297–304.
Cruz-Rivera, 2009, Reverse logistics network design for the collection of end-of-life vehicles in Mexico, European Journal of Operational Research, 196, 930, 10.1016/j.ejor.2008.04.041
Das, S., Yedlarajiah, D., 2002. An integer programming model for prescribing material recovery strategies. In: Proceedings of the IEEE International Symposium on Electronics and the Environment, San Francisco, CA, pp. 118–122.
Das, 2000, An approach for estimating the end-of-life product disassembly effort and cost, International Journal of Production Research, 38, 657, 10.1080/002075400189356
Daugherty, 2005, Reverse logistics: superior performance through focused resource commitments to information technology, Transportation Research Part E, 41, 77, 10.1016/j.tre.2004.04.002
de Brito, 2009, Inventory control with product returns: the impact of imperfect information, European Journal of Operational Research, 194, 85, 10.1016/j.ejor.2007.11.063
de Figueiredo, 2008, Designing minimum-cost recycling collection networks with required throughput, Transportation Research Part E, 44, 731, 10.1016/j.tre.2007.04.002
Debo, 2005, Market segmentation and product technology selection for remanufacturable products, Management Science, 51, 1193, 10.1287/mnsc.1050.0369
DeCroix, 2006, Optimal policy for a multiechelon inventory system with remanufacturing, Operations Research, 54, 532, 10.1287/opre.1060.0290
DeCroix, 2005, Inventory management for an assembly system with product or component returns, Management Science, 51, 1250, 10.1287/mnsc.1050.0394
DeCroix, 2005, A series system with returns: stationary analysis, Operations Research, 53, 350, 10.1287/opre.1040.0184
Dehghanian, 2009, Designing sustainable recovery network of end-of-life products using genetic algorithm, Resources, Conservation and Recycling, 53, 559, 10.1016/j.resconrec.2009.04.007
Demirel, 2008, A mixed integer programming model for remanufacturing in reverse logistics environment, International Journal of Advanced Manufacturing Technology, 39, 1197, 10.1007/s00170-007-1290-7
DePuy, 2007, Production planning for remanufactured products, Production Planning & Control, 18, 573, 10.1080/09537280701542210
Desai, 2003, Evaluation of disassemblability to enable design for disassembly in mass production, International Journal of Industrial Ergonomics, 32, 265, 10.1016/S0169-8141(03)00067-2
Desai, 2003, Review of literature on disassembly algorithms and design for disassembly guidelines for product design, International Journal of Industrial Engineering, 10, 244
Desai, 2005, Incorporating work factors in design for disassembly in product design, Journal of Manufacturing Technology Management, 16, 712, 10.1108/17410380510619932
Dethloff, 2001, Vehicle routing and reverse logistics: the vehicle routing problem with simultaneous delivery and pick-up, OR Spectrum, 23, 79, 10.1007/PL00013346
Dethloff, 2002, Relation between vehicle routing problems: an insertion heuristic for the vehicle routing problem with simultaneous delivery and pick-up applied to the vehicle routing problem with backhauls, Journal of the Operational Research Society, 53, 115, 10.1057/palgrave/jors/2601263
Dhanda, 2005, The role of information technology and systems in reverse logistics: a case study, International Journal of Technology Management, 31, 140, 10.1504/IJTM.2005.006628
Dobos, 2000, The integer EOQ repair and waste disposal model - further analysis, Central European Journal of Operations Research, 8, 173
Dobos, 2003, A production/recycling model with stationary demand and return rates, Central European Journal of Operations Research, 11, 35
Dobos, 2004, An extended production/recycling model with stationary demand and return rates, International Journal of Production Economics, 90, 311, 10.1016/j.ijpe.2003.09.007
Dobos, 2006, A production/recycling model with quality consideration, International Journal of Production Economics, 104, 571, 10.1016/j.ijpe.2005.09.006
Dong, 2003, A review of current research on disassembly sequence generation and computer aided design for disassembly, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 217, 299, 10.1243/095440503321590479
Dong, Y., Kaku, I., Tang, J., 2005. Inventory management in reverse logistics: a survey. In: Proceedings of the International Conference on Services Systems and Services Management. Chongqing, China, June 13–15, pp. 352–356.
Dong, 2006, A hierarchical approach to disassembly sequence planning for mechanical product, International Journal of Advanced Manufacturing Technology, 30, 507, 10.1007/s00170-005-0036-7
Du, 2008, A bi-objective reverse logistics network analysis for post-sale service, Computers & Operations Research, 35, 2617, 10.1016/j.cor.2006.12.020
Duta, 2008, Control and decision-making process in disassembling used electronic products, Studies in Informatics and Control, 17, 17
Duta, 2008, Evolutionary programming in disassembly decision making, International Journal of Computers, Communications & Control, 3, 282
Duta, L., Filip, F.G., Caciula, I., 2008b. Real time balancing of complex disassembly lines. In: Proceedings of the 17th IFAC World Congress on Automatic Control (IFAC 2008).
Efendigil, 2008, A holistic approach for selecting a third-party reverse logistics provider in the presence of vagueness, Computers & Industrial Engineering, 54, 269, 10.1016/j.cie.2007.07.009
El Saadany, 2008, The EOQ repair and waste disposal model with switching costs, Computers & Industrial Engineering, 55, 219, 10.1016/j.cie.2008.01.016
El Saadany, A.M.A., Jaber, M.Y. A production/remanufacturing inventory model with price and quality dependant return rate. Computers & Industrial Engineering, in press, doi:10.1016/j.cie.2009.01.017.
Erdos, 2001, Modelling and evaluating product end-of-life options, International Journal of Production Research, 39, 1203, 10.1080/713845985
Feldmann, 1999, The “green design advisor”: a tool for design for environment, Journal of Electronics Manufacturing, 9, 17, 10.1142/S0960313199000258
Ferguson, 2006, The effect of competition on recovery strategies, Production & Operations Management, 15, 351, 10.1111/j.1937-5956.2006.tb00250.x
Ferguson, 2001, Issues in end-of-life product recovery and reverse logistics, Production Planning & Control, 12, 534, 10.1080/09537280110042882
Fernandez, 2005, The influence of modularity and industry clockspeed on reverse logistics strategy: implications for the purchasing function, Journal of Purchasing and Supply Management, 11, 193, 10.1016/j.pursup.2006.01.005
Fernandez, 2008, A decision-making support system on a products recovery management framework: a fuzzy approach, Concurrent Engineering, 16, 129, 10.1177/1063293X08092486
Ferrao, 2006, Design for recycling in the automobile industry: new approaches and new tools, Journal of Engineering Design, 17, 447, 10.1080/09544820600648039
Ferrer, 2001, On the widget remanufacturing operation, European Journal of Operational Research, 135, 373, 10.1016/S0377-2217(00)00318-0
Ferrer, 2003, Yield information and supplier responsiveness in remanufacturing operations, European Journal of Operational Research, 149, 540, 10.1016/S0377-2217(02)00454-X
Ferrer, 2001, Material planning for a remanufacturing facility, Production & Operations Management, 10, 112, 10.1111/j.1937-5956.2001.tb00073.x
Ferrer, 2004, Value of information in remanufacturing complex products, IIE Transactions, 36, 265, 10.1080/07408170490274223
Ferrer, 2006, Managing new and remanufactured products, Management Science, 52, 15, 10.1287/mnsc.1050.0465
Ferrer, G., Swaminathan, J.M. Managing new and differentiated remanufactured products. European Journal of Operational Research, in press, doi:10.1016/j.ejor.2009.08.007.
Fiksel, 1996
Fleischmann, 2003, On optimal inventory control with independent stochastic item returns, European Journal of Operational Research, 151, 25, 10.1016/S0377-2217(02)00592-1
Fleischmann, 1997, Quantitative models for reverse logistics: a review, European Journal of Operational Research, 103, 1, 10.1016/S0377-2217(97)00230-0
Fleischmann, 2000, A characterisation of logistics networks for product recovery, Omega, 28, 653, 10.1016/S0305-0483(00)00022-0
Fleischmann, 2001, The impact of product recovery on logistics network design, Production & Operations Management, 10, 156, 10.1111/j.1937-5956.2001.tb00076.x
Fleischmann, 2002, Controlling inventories with stochastic item returns: a basic model, European Journal of Operational Research, 138, 63, 10.1016/S0377-2217(01)00100-X
Fleischmann, 2003, Integrating closed-loop supply chains and spare-parts management at IBM, Interfaces, 33, 44, 10.1287/inte.33.6.44.25189
Franke, 2006, Remanufacturing of mobile phones–capacity, program and facility adaptation planning, Omega, 34, 562, 10.1016/j.omega.2005.01.016
Galbreth, 2006, Optimal acquisition and sorting policies for remanufacturing, Production & Operations Management, 15, 384, 10.1111/j.1937-5956.2006.tb00252.x
Gao, 2004, Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets, IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics, 34, 2029, 10.1109/TSMCB.2004.833331
Gehin, 2008, A tool to implement sustainable end-of-life strategies in the product development phase, Journal of Cleaner Production, 16, 566, 10.1016/j.jclepro.2007.02.012
Georgiadis, 2004, The effect of environmental parameters on product recovery, European Journal of Operational Research, 157, 449, 10.1016/S0377-2217(03)00203-0
Georgiadis, 2008, Sustainability in electrical and electronic equipment closed-loop supply chains: a system dynamics approach, Journal of Cleaner Production, 16, 1665, 10.1016/j.jclepro.2008.04.019
Georgiadis, P., Athanasiou, E. The impact of two-product joint lifecycles on capacity planning of remanufacturing networks. European Journal of Operational Research, in press, doi:10.1016/j.ejor.2009.05.022.
Georgiadis, 2006, The impact of product lifecycle on capacity planning of closed-loop supply chains with remanufacturing, Production & Operations Management, 15, 514, 10.1111/j.1937-5956.2006.tb00160.x
Geyer, 2007, The economics of remanufacturing under limited component durability and finite product life cycles, Management Science, 53, 88, 10.1287/mnsc.1060.0600
Giudice, 2007, Disassembly planning of mechanical systems for service and recovery: a genetic algorithms based approach, Journal of Intelligent Manufacturing, 18, 313, 10.1007/s10845-007-0025-9
Giudice, 2009, End-of-life impact reduction through analysis and redistribution of disassembly depth: a case study in electronic device redesign, Computers and Industrial Engineering, 57, 677, 10.1016/j.cie.2009.01.007
Giudice, 2005, Materials selection in the life-cycle design process: a method to integrate mechanical and environmental performances in optimal choice, Materials & Design, 26, 9, 10.1016/j.matdes.2004.04.006
Giudice, 2006
Golany, 2001, Economic lot-sizing with remanufacturing options, IIE Transactions, 33, 995, 10.1080/07408170108936890
Gonzalez, 2005, A bill of materials-based approach for end-of-life decision making in design for the environment, International Journal of Production Research, 43, 2071, 10.1080/00207540412331333423
Gonzalez, 2006, A scatter search approach to the optimum disassembly sequence problem, Computers & Operations Research, 33, 1776, 10.1016/j.cor.2004.11.018
Gribkovskaia, 2007, General solutions to the single vehicle routing problem with pickups and deliveries, European Journal of Operational Research, 180, 568, 10.1016/j.ejor.2006.05.009
Grochowski, 2009, A machine learning approach for optimal disassembly planning, International Journal of Computer Integrated Manufacturing, 22, 374, 10.1080/09511920802024176
Grote, 2007, An approach to the EuP Directive and the application of the economic eco-design for complex products, International Journal of Production Research, 45, 4099, 10.1080/00207540701450088
Guide, 1996, Scheduling using drum-buffer-rope in a remanufacturing environment, International Journal of Production Research, 34, 1081, 10.1080/00207549608904951
Guide, 1997, Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system, International Journal of Production Economics, 53, 101, 10.1016/S0925-5273(97)00097-2
Guide, 2000, Production planning and control for remanufacturing: industry practice and research needs, Journal of Operations Management, 18, 467, 10.1016/S0272-6963(00)00034-6
Guide, 1997, Rough-cut capacity planning for remanufacturing firms, Production Planning & Control, 8, 237, 10.1080/095372897235299
Guide, 1997, An evaluation of order release strategies in a remanufacturing environment, Computers & Operations Research, 24, 37, 10.1016/S0305-0548(96)00023-8
Guide, 1997, Buffering from material recovery uncertainty in a recoverable manufacturing environment, Journal of the Operational Research Society, 48, 519, 10.1057/palgrave.jors.2600402
Guide, 1998, Inventory buffers in recoverable manufacturing, Journal of Operations Management, 16, 551, 10.1016/S0272-6963(97)00024-7
Guide, 2000, Product acquisition management: current industry practice and a proposed framework, International Journal of Production Research, 38, 3779, 10.1080/00207540050176003
Guide, 2001, Managing product returns for remanufacturing, Production & Operations Management, 10, 142, 10.1111/j.1937-5956.2001.tb00075.x
Guide, 2003, A hierarchical decision model for re-manufacturing and re-use, International Journal of Logistics: Research & Applications, 6, 29, 10.1080/1367556031000063040
Guide, 1997, Scheduling policies for remanufacturing, International Journal of Production Economics, 48, 187, 10.1016/S0925-5273(96)00091-6
Guide, 1997, Product structure complexity and scheduling of operations in recoverable manufacturing, International Journal of Production Research, 35, 3179, 10.1080/002075497194345
Guide, 1997, An evaluation of capacity planning techniques in a remanufacturing environment, International Journal of Production Research, 35, 67, 10.1080/002075497195984
Guide, 1998, Proactive expediting policies for recoverable manufacturing, Journal of the Operational Research Society, 49, 479, 10.1057/palgrave.jors.2600527
Guide, 1999, Production planning and control for remanufacturing: a state-of-the-art survey, Robotics and Computer-Integrated Manufacturing, 15, 221, 10.1016/S0736-5845(99)00020-4
Guide, 1999, The effect of lead time variation on the performance of disassembly release mechanisms, Computers & Industrial Engineering, 36, 759, 10.1016/S0360-8352(99)00164-3
Guide, 2000, Priority scheduling policies for repair shops, International Journal of Production Research, 38, 929, 10.1080/002075400189220
Guide, 2003, Matching demand and supply to maximize profits from remanufacturing, Manufacturing & Service Operations Management, 5, 303, 10.1287/msom.5.4.303.24883
Guide, 2005, Hewlett-Packard company unlocks the value potential from time-sensitive returns, Interfaces, 35, 281, 10.1287/inte.1050.0145
Guide, 2005, Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly, European Journal of Operational Research, 164, 341, 10.1016/j.ejor.2003.12.015
Guide, 2006, Time value of commercial product returns, Management Science, 52, 1200, 10.1287/mnsc.1060.0522
Gungor, 2006, Evaluation of connection types in design for disassembly (DFD) using analytic network process, Computers & Industrial Engineering, 50, 35, 10.1016/j.cie.2005.12.002
Gungor, 1997, An evaluation methodology for disassembly processes, Computers & Industrial Engineering, 33, 329, 10.1016/S0360-8352(97)00104-6
Gungor, 1998, Disassembly sequence planning for products with defective parts in product recovery, Computers & Industrial Engineering, 35, 161, 10.1016/S0360-8352(98)00047-3
Gungor, 1999, Issues in environmentally conscious manufacturing and product recovery: a survey, Computers & Industrial Engineering, 36, 811, 10.1016/S0360-8352(99)00167-9
Gungor, 2001, A solution approach to the disassembly line balancing problem in the presence of task failures, International Journal of Production Research, 39, 1427, 10.1080/00207540110052157
Gungor, 2001, Disassembly sequence plan generation using a branch-and-bound algorithm, International Journal of Production Research, 39, 481, 10.1080/00207540010002838
Gungor, 2002, Disassembly line in product recovery, International Journal of Production Research, 40, 2569, 10.1080/00207540210135622
Gupta, 1994, Scheduling disassembly, International Journal of Production Research, 32, 1857, 10.1080/00207549408957046
Gupta, 2001, Aggregate planning for end-of-life products, 205
Gupta, 2008
Gupta, S.M., Imtanavanich, P., Nakashima, K. Using neural networks to solve a disassembly-to-order problem. International Journal of Biomedical Soft Computing and Human Sciences, in press.
Heese, 2005, Competitive advantage through take-back of used products, European Journal of Operational Research, 164, 143, 10.1016/j.ejor.2003.11.008
Heisig, 2001, Planning stability in a product recovery system, OR Spectrum, 23, 25, 10.1007/PL00013343
Helber, 1998, Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times, European Journal of Operational Research, 109, 24, 10.1016/S0377-2217(97)00166-5
Hervani, 2005, Performance measurement for green supply chain management, Benchmarking: An International Journal, 12, 330, 10.1108/14635770510609015
Heyman, 1977, Optimal disposal policies for a single-item inventory system with returns, Naval Research Logistics, 24, 385, 10.1002/nav.3800240302
Holloway, 1998, Materials selection for optimal environmental impact in mechanical design, Materials and Design, 19, 133, 10.1016/S0261-3069(98)00031-4
Hong, 2008, Centralized versus decentralized decision-making for recycled material flows, Environmental Science & Technology, 42, 1172, 10.1021/es062177k
Hong, 2006, Planning the e-scrap reverse production system under uncertainty in the state of Georgia: a case study, IEEE Transactions on Electronics Packaging Manufacturing, 29, 150, 10.1109/TEPM.2006.881769
Hopkinson, 2006, Design for environment analyses applied to rapid manufacturing, Proceedings of the Institution of Mechanical Engineers, Part D: Automobile Engineering, 220, 1363, 10.1243/09544070JAUTO309
Horvath, 2005, Liquidity implications of reverse logistics for retailers: a Markov chain approach, Journal of Retailing, 81, 191, 10.1016/j.jretai.2005.07.003
Houe, 2007, Knowledge modeling for eco-design, Concurrent Engineering, 15, 7, 10.1177/1063293X07076272
Hsin-Hao, 2000, Disassembly sequence generation using a neural network approach, Journal of Manufacturing Systems, 19, 73, 10.1016/S0278-6125(00)80001-1
Hu, 2002, A reverse logistics cost minimization model for the treatment of hazardous wastes, Transportation Research Part E, 38, 457, 10.1016/S1366-5545(02)00020-0
Huang, 1996
Huang, 2009, Materials selection for environmentally conscious design via a proposed life cycle environmental performance index, International Journal of Advanced Manufacturing Technology, 44, 1073, 10.1007/s00170-009-1935-9
Huang, 2009, Dynamic models of closed-loop supply chain and robust H∞ control strategies, International Journal of Production Research, 47, 2279, 10.1080/00207540701636355
Hui, 2008, A genetic algorithm for product disassembly sequence planning, Neurocomputing, 71, 2720, 10.1016/j.neucom.2007.11.042
Hula, 2003, Multi-criteria decision-making for optimization of product disassembly under multiple situations, Environmental Science & Technology, 37, 5303, 10.1021/es0345423
Hundal, 2001
Iakovou, 2009, A methodological framework for end-of-life management of electronic products, Resources, Conservation and Recycling, 53, 329, 10.1016/j.resconrec.2009.02.001
Ilgin, M.A., Gupta, S.M., 2008a. Using simulation optimization for parts recovery and spare parts inventory management in post product life cycle. In: Proceedings of the 2008 Northeast Decision Sciences Institute Conference, Brooklyn, New York, March 28–30, pp. 543–545.
Ilgin, M.A., Gupta, S.M., 2008b. Joint optimization of transportation and spare parts inventory policies in a reverse logistics network using optquest. In: Proceedings of the 2008 ASME International Mechanical Engineering Congress and Exposition, Boston, MA, November 2–6, pp. 877–885.
Imtanavanich, 2006, Calculating disassembly yields in a multi-criteria decision-making environment for a disassembly to order system, 109
Inderfurth, 1997, Simple optimal replenishment and disposal policies for a product recovery system with leadtimes, OR Spectrum, 19, 111, 10.1007/BF01545510
Inderfurth, 2004, Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution, International Journal of Production Economics, 90, 325, 10.1016/S0925-5273(02)00470-X
Inderfurth, 2005, Impact of uncertainties on recovery behavior in a remanufacturing environment, International Journal of Physical Distribution & Logistics Management, 35, 318, 10.1108/09600030510607328
Inderfurth, 2001, Leadtime effects and policy improvement for stochastic inventory control with remanufacturing, International Journal of Production Economics, 71, 381, 10.1016/S0925-5273(00)00135-3
Inderfurth, 2006, Heuristics for solving disassemble-to-order problems with stochastic yields, OR Spectrum, 28, 73, 10.1007/s00291-005-0007-2
Inderfurth, 2008, Decision support for spare parts acquisition in post product life cycle, Central European Journal of Operations Research, 16, 17, 10.1007/s10100-007-0041-z
Inderfurth, 2001, Product recovery in stochastic remanufacturing systems with multiple reuse options, European Journal of Operational Research, 133, 130, 10.1016/S0377-2217(00)00188-0
Isaacs, 1997, Economic consequences of increasing polymer content for the U.S. automobile recycling infrastructure, Journal of Industrial Ecology, 1, 19, 10.1162/jiec.1997.1.4.19
Jaber, 2008, The economic order quantity repair and waste disposal model with entropy cost, European Journal of Operational Research, 188, 109, 10.1016/j.ejor.2007.03.016
Jaber, M.Y., El Saadany, A.M.A. An economic production and remanufacturing model with learning effects. International Journal of Production Economics, in press, doi:10.1016/j.ijpe.2009.04.019.
Jaber, 2009, The production, remanufacture and waste disposal model with lost sales, International Journal of Production Economics, 120, 115, 10.1016/j.ijpe.2008.07.016
Jayaraman, 2006, Production planning for closed-loop supply chains with product recovery and reuse: an analytical approach, International Journal of Production Research, 44, 981, 10.1080/00207540500250507
Jayaraman, 1999, Closed-loop logistics model for remanufacturing, Journal of the Operational Research Society, 50, 497, 10.1057/palgrave.jors.2600716
Jayaraman, 2003, The design of reverse distribution networks: models and solution procedures, European Journal of Operational Research, 150, 128, 10.1016/S0377-2217(02)00497-6
Johansson, 2007, Managing the design/environment interface: studies of integration mechanisms, International Journal of Production Research, 45, 4041, 10.1080/00207540701474823
Jorjani, 2004, Model for the allocation of electronics components to reuse options, International Journal of Production Research, 42, 1131, 10.1080/00207540310001632466
Jun, 2007, A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study, International Journal of Production Research, 45, 4573, 10.1080/00207540701440071
Kaebernick, 2000, A method for sequencing the disassembly of products, CIRP Annals – Manufacturing Technology, 49, 13, 10.1016/S0007-8506(07)62886-8
Kainuma, 2006, A multiple attribute utility theory approach to lean and green supply chain management, International Journal of Production Economics, 101, 99, 10.1016/j.ijpe.2005.05.010
Kalisvaart, 1995, Implementing ecological product design, World Class Design to Manufacture, 2, 21, 10.1108/09642369310104264
Kang, 2003, Disassembly sequencing with imprecise data: a case study, International Journal of Industrial Engineering, 10, 407
Kannan, 2009, Fuzzy approach for the selection of third party reverse logistics provider, Asia Pacific Journal of Marketing and Logistics, 21, 397, 10.1108/13555850910973865
Kannan, 2008, An application of the analytical hierarchy process and fuzzy analytical hierarchy process in the selection of collecting centre location for the reverse logistics multicriteria decision-making supply chain model, International Journal of Management and Decision Making, 9, 350, 10.1504/IJMDM.2008.019360
Kannan, 2009, Analysis of closed loop supply chain using genetic algorithm and particle swarm optimisation, International Journal of Production Research, 47, 1175, 10.1080/00207540701543585
Kannan, 2009, A hybrid approach using ISM and fuzzy TOPSIS for the selection of reverse logistics provider. Resources, Conservation and Recycling, 54, 28, 10.1016/j.resconrec.2009.06.004
Kannan, G., Sasikumar, P., Devika, K. A genetic algorithm approach for solving a closed loop supply chain model: a case of battery recycling. Applied Mathematical Modelling, in press, doi:10.1016/j.apm.2009.06.021.
Kara, 2007, Simulation modelling of reverse logistics networks, International Journal of Production Economics, 106, 61, 10.1016/j.ijpe.2006.04.009
Karakayali, 2007, An analysis of decentralized collection and processing of end-of-life products, Journal of Operations Management, 25, 1161, 10.1016/j.jom.2007.01.017
Kaya, 2010, Incentive and production decisions for remanufacturing operations, European Journal of Operational Research, 201, 442, 10.1016/j.ejor.2009.03.007
Kazmierczak, 2004, Car disassembly and ergonomics in Sweden: current situation and future perspectives in light of new environmental legislation, International Journal of Production Research, 42, 1305, 10.1080/00207540310001624393
Kazmierczak, 2005, An integrated analysis of ergonomics and time consumption in Swedish ‘craft-type’ car disassembly, Applied Ergonomics, 36, 263, 10.1016/j.apergo.2005.01.010
Kazmierczak, 2007, A case study of serial-flow car disassembly: ergonomics, productivity and potential system performance, Human Factors and Ergonomics in Manufacturing, 17, 331, 10.1002/hfm.20078
Kelle, 1989, Forecasting the returns of reusable containers, Journal of Operations Management, 8, 17, 10.1016/S0272-6963(89)80003-8
Ketzenberg, 2009, The value of information in a capacitated closed loop supply chain, European Journal of Operational Research, 198, 491, 10.1016/j.ejor.2008.09.028
Ketzenberg, 2003, Mixed assembly and disassembly operations for remanufacturing, Production & Operations Management, 12, 320, 10.1111/j.1937-5956.2003.tb00206.x
Ketzenberg, 2006, Value of information in closed loop supply chains, Production & Operations Management, 15, 393, 10.1111/j.1937-5956.2006.tb00253.x
Kiesmüller, 2003, Optimal control of a one product recovery system with leadtimes, International Journal of Production Economics, 81, 333, 10.1016/S0925-5273(02)00329-8
Kiesmüller, 2003, A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes, European Journal of Operational Research, 147, 62, 10.1016/S0377-2217(02)00351-X
Kiesmüller, 2003, Computational issues in a stochastic finite horizon one product recovery inventory model, European Journal of Operational Research, 146, 553, 10.1016/S0377-2217(02)00249-7
Kiesmuller, 2003, Simple expressions for finding recovery system inventory control parameter values, Journal of the Operational Research Society, 54, 83, 10.1057/palgrave.jors.2601480
Kim, 2003, Disassembly scheduling with multiple product types, CIRP Annals – Manufacturing Technology, 52, 403, 10.1016/S0007-8506(07)60611-8
Kim, 2005, Optimization model for remanufacturing system at strategic and operational level, 566
Kim, 2006, A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints, Journal of the Operational Research Society, 57, 1231, 10.1057/palgrave.jors.2602094
Kim, 2006, Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality, International Journal of Production Research, 44, 195, 10.1080/00207540500244443
Kim, 2006, Disassembly scheduling with capacity constraints: minimizing the number of products disassembled, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 220, 1473, 10.1243/09544054JEM349
Kim, 2006, Supply planning model for remanufacturing system in reverse logistics environment, Computers & Industrial Engineering, 51, 279, 10.1016/j.cie.2006.02.008
Kim, 2007, Automatic control sequence generation for a hybrid disassembly system, IEEE Transactions on Automation Science and Engineering, 4, 194, 10.1109/TASE.2006.880538
Kim, 2007, Disassembly scheduling: literature review and future research directions, International Journal of Production Research, 45, 4465, 10.1080/00207540701440097
Kim, 2009, Vehicle routing in reverse logistics for recycling end-of-life consumer electronic goods in South Korea, Transportation Research Part D, 14, 291, 10.1016/j.trd.2009.03.001
Kim, 2009, Emulation-based control of a disassembly system for LCD monitors, International Journal of Advanced Manufacturing Technology, 40, 383, 10.1007/s00170-007-1334-z
Kim, 2009, Dynamic process planning control of hybrid disassembly systems, International Journal of Advanced Manufacturing Technology, 40, 1016, 10.1007/s00170-008-1407-7
Kim, 2009, A branch and bound algorithm for disassembly scheduling with assembly product structure, Journal of the Operational Research Society, 60, 419, 10.1057/palgrave.jors.2602568
Klausner, 2000, Reverse-logistics strategy for product take-back, Interfaces, 30, 156, 10.1287/inte.30.3.156.11657
Kleber, 2006, The integral decision on production/remanufacturing technology and investment time in product recovery, OR Spectrum, 28, 21, 10.1007/s00291-005-0011-6
Kleber, 2002, A continuous time inventory model for a product recovery system with multiple options, International Journal of Production Economics, 79, 121, 10.1016/S0925-5273(02)00256-6
Knight, 2000, Design for bulk recycling: analysis of materials separation, CIRP Annals – Manufacturing Technology, 49, 83, 10.1016/S0007-8506(07)62901-1
Ko, 2007, A genetic algorithm-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs, Computers & Operations Research, 34, 346, 10.1016/j.cor.2005.03.004
Koc, 2009, Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph, IIE Transactions, 41, 866, 10.1080/07408170802510390
Koh, 2002, An optimal ordering and recovery policy for reusable items, Computers & Industrial Engineering, 43, 59, 10.1016/S0360-8352(02)00062-1
Kongar, 2002, A multi-criteria decision making approach for disassembly-to-order systems, Journal of Electronics Manufacturing, 11, 171, 10.1142/S0960313102000345
Kongar, 2006, Disassembly to order system under uncertainty, Omega, 34, 550, 10.1016/j.omega.2005.01.006
Kongar, 2006, Disassembly sequencing using genetic algorithm, International Journal of Advanced Manufacturing Technology, 30, 497, 10.1007/s00170-005-0041-x
Kongar, E., Gupta, S.M. A multiple objective tabu search approach for end-of-life product disassembly. International Journal of Advanced Operations Management, in press.
Kongar, 2009, Solving the disassembly-to-order problem using linear physical programming, International Journal of Mathematics in Operational Research, 1, 504, 10.1504/IJMOR.2009.026279
Konstantaras, 2006, Lot-sizing for a single-product recovery system with backordering, International Journal of Production Research, 44, 2031, 10.1080/00207540500380924
Konstantaras, 2007, Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options, European Journal of Operational Research, 178, 433, 10.1016/j.ejor.2006.02.008
Kopacek, 2006, Intelligent, flexible disassembly, International Journal of Advanced Manufacturing Technology, 30, 554, 10.1007/s00170-005-0042-9
Korugan, 1998, A multi-echelon inventory system with returns, Computers & Industrial Engineering, 35, 145, 10.1016/S0360-8352(98)00041-2
Krikke, 1998, On a medium term product recovery and disposal strategy for durable assembly products, International Journal of Production Research, 36, 111, 10.1080/002075498193967
Krikke, 1999, Business case Roteb: recovery strategies for monitors, Computers & Industrial Engineering, 36, 739, 10.1016/S0360-8352(99)00163-1
Krikke, 1999, Business case Océ: reverse logistic network re-design for copiers, OR Spectrum, 21, 381, 10.1007/s002910050095
Krikke, 2003, Concurrent product and closed-loop supply chain design with an application to refrigerators, International Journal of Production Research, 41, 3689, 10.1080/0020754031000120087
Krikke, 2004, Product modularity and the design of closed-loop supply chains, California Management Review, 46, 23, 10.2307/41166208
Krikke, 2008, Low-frequency collection of materials disassembled from end-of-life vehicles: on the value of on-line monitoring in optimizing route planning, International Journal of Production Economics, 111, 209, 10.1016/j.ijpe.2006.10.015
Kroll, 1996, Application of work-measurement analysis to product disassembly for recycling, Concurrent Engineering, 4, 149, 10.1177/1063293X9600400205
Kroll, 1998, Quantitative evaluation of product disassembly for recycling, Research in Engineering Design, 10, 1, 10.1007/BF01580266
Kroll, 1999, Disassembly analysis through time estimation and other metrics, Robotics and Computer-Integrated Manufacturing, 15, 191, 10.1016/S0736-5845(99)00026-5
Krumwiede, 2002, A model for reverse logistics entry by third-party providers, Omega, 30, 325, 10.1016/S0305-0483(02)00049-X
Kumar, 2008, Sustainability of the automotive recycling infrastructure: review of current research and identification of future challenges, International Journal of Sustainable Manufacturing, 1, 145, 10.1504/IJSM.2008.019231
Kumar, 2003, Expert enhanced coloured stochastic Petri net and its application in assembly/disassembly, International Journal of Production Research, 41, 2727, 10.1080/0020754021000042373
Kumar, 2005, Infusing sustainability principles into manufacturing/mechanical engineering curricula, Journal of Manufacturing Systems, 24, 215, 10.1016/S0278-6125(06)80011-7
Kumar, 2007, Value flow characterization during product lifecycle to assist in recovery decisions, International Journal of Production Research, 45, 4555, 10.1080/00207540701474633
Kuo, 2000, Disassembly sequence and cost analysis for electromechanical products, Robotics and Computer-Integrated Manufacturing, 16, 43, 10.1016/S0736-5845(99)00048-4
Kuo, 2006, Enhancing disassembly and recycling planning using life-cycle analysis, Robotics and Computer-Integrated Manufacturing, 22, 420, 10.1016/j.rcim.2005.11.014
Kuo, 2003, Green products development by applying grey relational analysis and green quality function deployment, International Journal of Fuzzy Systems, 5, 229
Kuo, 2001, Design for manufacture and design for ‘X’: concepts, applications, and perspectives, Computers & Industrial Engineering, 41, 241, 10.1016/S0360-8352(01)00045-6
Kuo, 2006, Environmentally conscious design by using fuzzy multi-attribute decision-making, International Journal of Advanced Manufacturing Technology, 29, 209, 10.1007/s00170-005-2504-5
Kwak, 2009, Eco-architecture analysis for end-of-life decision making, International Journal of Production Research, 47, 6233, 10.1080/00207540802175329
Lambert, 1997, Optimal disassembly of complex products, International Journal of Production Research, 35, 2509, 10.1080/002075497194633
Lambert, 1999, Linear programming in disassembly/clustering sequence generation, Computers & Industrial Engineering, 36, 723, 10.1016/S0360-8352(99)00162-X
Lambert, 2003, Disassembly sequencing: a survey, International Journal of Production Research, 41, 3721, 10.1080/0020754031000120078
Lambert, 2006, Exact methods in optimum disassembly sequence search for problems subject to sequence dependent costs, Omega, 34, 538, 10.1016/j.omega.2005.01.005
Lambert, 2007, Optimizing disassembly processes subjected to sequence-dependent cost, Computers & Operations Research, 34, 536, 10.1016/j.cor.2005.03.012
Lambert, 2002, Demand-driven disassembly optimization for electronic products, Journal of Electronics Manufacturing, 11, 121, 10.1142/S0960313102000436
Lambert, 2005
Lambert, 2008, Methods for optimum and near optimum disassembly sequencing, International Journal of Production Research, 46, 2845, 10.1080/00207540601120484
Langella, 2007, Heuristics for demand-driven disassembly planning, Computers & Operations Research, 34, 552, 10.1016/j.cor.2005.03.013
Lee, 2008, A heuristic approach to logistics network design for end-of-lease computer products recovery, Transportation Research Part E, 44, 455, 10.1016/j.tre.2006.11.003
Lee, 2009, Dynamic network design for reverse logistics operations under uncertainty, Transportation Research Part E, 45, 61, 10.1016/j.tre.2008.08.002
Lee, 2004, A two-stage heuristic for disassembly scheduling with assembly product structure, Journal of the Operational Research Society, 55, 287, 10.1057/palgrave.jors.2601690
Lee, 2001, Disassembly planning and scheduling: review and further research, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 215, 695, 10.1243/0954405011518629
Lee, 2001, A multi-objective methodology for evaluating product end-of-life options and disassembly, The International Journal of Advanced Manufacturing Technology, 18, 148, 10.1007/s001700170086
Lee, 2002, Disassembly scheduling with capacity constraints, CIRP Annals – Manufacturing Technology, 51, 387, 10.1016/S0007-8506(07)61543-1
Lee, 2004, Disassembly scheduling: integer programming models, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 218, 1357, 10.1243/0954405042323586
Lee, 2007, Multiobjective model and solution method for integrated forward and reverse logistics network design for third-party logistics providers, Transportation Research Record: Journal of the Transportation Research Board, 2032, 43, 10.3141/2032-06
Lee, 2007, Multiproduct distribution network design of third-party logistics providers with reverse logistics operations, Transportation Research Record: Journal of the Transportation Research Board, 2008, 26, 10.3141/2008-04
Lee, 2007, Design of product recovery networks under uncertainty, Transportation Research Record: Journal of the Transportation Research Board, 2008, 19, 10.3141/2008-03
Lee, 2009, Network model and optimization of reverse logistics by hybrid genetic algorithm, Computers & Industrial Engineering, 56, 951, 10.1016/j.cie.2008.09.021
Li, 2005, An object-oriented intelligent disassembly sequence planner for maintenance, Computers in Industry, 56, 699, 10.1016/j.compind.2005.03.005
Li, 2006, Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph, International Journal of Production Economics, 102, 51, 10.1016/j.ijpe.2005.01.012
Li, 2008, Application of neural network on environmental impact assessment tools, International Journal of Sustainable Manufacturing, 1, 100, 10.1504/IJSM.2008.019229
Li, 2008, A multi-objective fuzzy graph approach for modular formulation considering end-of-life issues, International Journal of Production Research, 46, 4011, 10.1080/00207540601050376
Li, 2009, A hybrid simulation optimization method for production planning of dedicated remanufacturing, International Journal of Production Economics, 117, 286, 10.1016/j.ijpe.2008.11.005
Liang, 2009, Pricing used products for remanufacturing, European Journal of Operational Research, 193, 390, 10.1016/j.ejor.2007.11.029
Lieckens, 2007, Reverse logistics network design with stochastic lead times, Computers & Operations Research, 34, 395, 10.1016/j.cor.2005.03.006
Linton, 2003, The role of forecasting in sustainability, Technological Forecasting and Social Change, 70, 21, 10.1016/S0040-1625(02)00181-6
Linton, 2002, Supply planning for industrial ecology and remanufacturing under uncertainty: a numerical study of leaded-waste recovery from television disposal, Journal of the Operational Research Society, 53, 1185, 10.1057/palgrave.jors.2601418
Linton, 2005, Recovery and reclamation of durable goods: a study of television CRTs, Resources, Conservation and Recycling, 43, 337, 10.1016/j.resconrec.2004.06.008
Listes, 2007, A generic stochastic model for supply-and-return network design, Computers & Operations Research, 34, 417, 10.1016/j.cor.2005.03.007
Listes, 2005, A stochastic approach to a case study for product recovery network design, European Journal of Operational Research, 160, 268, 10.1016/j.ejor.2001.12.001
Liu, 2002, Recycling strategy and a recyclability assessment model based on an artificial neural network, Journal of Materials Processing Technology, 129, 500, 10.1016/S0924-0136(02)00625-8
Louwers, 1999, A facility location allocation model for reusing carpet materials, Computers & Industrial Engineering, 36, 855, 10.1016/S0360-8352(99)00168-0
Lu, 2007, Environmental principles applicable to green supplier evaluation by using multi-objective decision analysis, International Journal of Production Research, 45, 4317, 10.1080/00207540701472694
Lu, 2006, Model-based analysis of capacity and service fees for electronics recyclers, Journal of Manufacturing Systems, 25, 45, 10.1016/S0278-6125(06)80032-4
Lu, 2007, A facility location model for logistics systems including reverse flows: the case of remanufacturing activities, Computers & Operations Research, 34, 299, 10.1016/j.cor.2005.03.002
Lye, 2002, ECoDE – an environmental component design evaluation tool, Engineering with Computers, 18, 14, 10.1007/s003660200001
Mabini, 1992, EOQ type formulations for controlling repairable inventories, International Journal of Production Economics, 28, 21, 10.1016/0925-5273(92)90110-S
Madu, 2002, A hierarchic metric approach for integration of green issues in manufacturing: a paper recycling application, Journal of Environmental Management, 64, 261, 10.1006/jema.2001.0498
Mahadevan, 2003, Periodic review, push inventory policies for remanufacturing, European Journal of Operational Research, 151, 536, 10.1016/S0377-2217(02)00627-6
Majumder, 2001, Competition in remanufacturing, Production & Operations Management, 10, 125, 10.1111/j.1937-5956.2001.tb00074.x
Mangun, 2002, Incorporating component reuse, remanufacture, and recycle into product portfolio design, IEEE Transactions on Engineering Management, 49, 479, 10.1109/TEM.2002.807292
Marx-Gomez, 2002, Neuro-fuzzy approach to forecast returns of scrapped products to recycling and remanufacturing, Knowledge-Based Systems, 15, 119, 10.1016/S0950-7051(01)00128-9
Masanet, 2007, Assessing the benefits of design for recycling for plastics in electronics: a case study of computer enclosures, Materials and Design, 28, 1801, 10.1016/j.matdes.2006.04.022
Mascle, 2003, Algorithmic selection of a disassembly sequence of a component by a wave propagation method, Robotics and Computer Integrated Manufacturing, 19, 439, 10.1016/S0736-5845(03)00032-2
Mascle, 2008, Integrating environmental consciousness in product/process development based on life-cycle thinking, International Journal of Production Economics, 112, 5, 10.1016/j.ijpe.2006.08.016
Masui, 2003, Applying quality function deployment to environmentally conscious design, International Journal of Quality and Reliability Management, 20, 90, 10.1108/02656710310453836
Mathieux, 2008, ReSICLED: a new recovery-conscious design method for complex products based on a multicriteria assessment of the recoverability, Journal of Cleaner Production, 16, 277, 10.1016/j.jclepro.2006.07.026
McGovern, 2006, Ant colony optimization for disassembly sequencing with multiple objectives, International Journal of Advanced Manufacturing Technology, 30, 481, 10.1007/s00170-005-0037-6
McGovern, 2007, Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem, International Journal of Production Research, 45, 4485, 10.1080/00207540701476281
McGovern, 2007, A balancing method and genetic algorithm for disassembly line balancing, European Journal of Operational Research, 179, 692, 10.1016/j.ejor.2005.03.055
Meacham, 1999, Optimal disassembly configurations for single and multiple products, Journal of Manufacturing Systems, 18, 311, 10.1016/S0278-6125(00)87634-7
Meade, 2002, A conceptual model for selecting and evaluating third-party reverse logistics providers, Supply Chain Management: An International Journal, 7, 283, 10.1108/13598540210447728
Meerkamm, 1994, Design for X – a core area of design methodology, Journal of Engineering Design, 5, 145, 10.1080/09544829408907881
Mehta, 2001, Green quality function deployment III: a methodology for developing environmentally conscious products, Journal of Design and Manufacturing Automation, 1, 1, 10.1080/15320370108500198
Min, 2008, The dynamic design of a reverse logistics network from the perspective of third-party logistics service providers, International Journal of Production Economics, 113, 176, 10.1016/j.ijpe.2007.01.017
Min, 2006, A genetic algorithm approach to developing the multi-echelon reverse logistics network for product returns, Omega, 34, 56, 10.1016/j.omega.2004.07.025
Min, 2006, The spatial and temporal consolidation of returned products in a closed-loop supply chain network, Computers & Industrial Engineering, 51, 309, 10.1016/j.cie.2006.02.010
Minner, 2001, Strategic safety stocks in reverse logistics supply chains, International Journal of Production Economics, 71, 417, 10.1016/S0925-5273(00)00138-9
Minner, 2001, Optimal control of production and remanufacturing in a simple recovery model with linear cost functions, OR Spectrum, 23, 3, 10.1007/PL00013344
Mital, 2007, A structured approach to new product design, development and manufacture part II: putting the product together (assembly) and disposal (disassembly), International Journal of Industrial Engineering, 14, 23
Mitra, 2007, Revenue management for remanufactured products, Omega, 35, 553, 10.1016/j.omega.2005.10.003
Mitra, 2008, Competition in remanufacturing and the effects of government subsidies, International Journal of Production Economics, 111, 287, 10.1016/j.ijpe.2007.02.042
Moore, 1998, A Petri net approach to disassembly process planning, Computers & Industrial Engineering, 35, 165, 10.1016/S0360-8352(98)00051-5
Moore, 2001, Petri net approach to disassembly process planning for products with complex AND/OR precedence relationships, European Journal of Operational Research, 135, 428, 10.1016/S0377-2217(00)00321-0
Mostard, 2006, The newsboy problem with resalable returns: a single period model and case study, European Journal of Operational Research, 169, 81, 10.1016/j.ejor.2004.04.048
Mourao, 2000, Lower-bounding and heuristic methods for a refuse collection vehicle routing problem, European Journal of Operational Research, 121, 420, 10.1016/S0377-2217(99)00045-4
Mourao, 2005, Heuristic method for a mixed capacitated arc routing problem: a refuse collection application, European Journal of Operational Research, 160, 139, 10.1016/j.ejor.2004.01.023
Moyer, 1997, Environmental concerns and recycling/disassembly efforts in the electronics industry, Journal of Electronics Manufacturing, 7, 1, 10.1142/S0960313197000026
Muckstadt, 1981, An analysis of single item inventory systems with returns, Naval Research Logistics, 28, 237, 10.1002/nav.3800280207
Mukhopadhyay, 2004, Reverse logistics in e-business, International Journal of Physical Distribution and Logistics Management, 34, 70, 10.1108/09600030410515691
Mukhopadhyay, 2005, Optimal return policy and modular design for build-to-order products, Journal of Operations Management, 23, 496, 10.1016/j.jom.2004.10.012
Mukhopadhyay, 2006, The role of 4PL as the reverse logistics integrator: optimal pricing and return policies, International Journal of Physical Distribution & Logistics Management, 36, 716, 10.1108/09600030610710872
Mutha, 2009, Strategic network design for reverse logistics and remanufacturing using new and old product modules, Computers & Industrial Engineering, 56, 334, 10.1016/j.cie.2008.06.006
Nahmias, 1979, A deterministic model for a repairable item inventory system with a finite repair rate, International Journal of Production Research, 17, 215, 10.1080/00207547908919609
Nakamura, 2002, Input–output analysis of waste management, Journal of Industrial Ecology, 6, 39, 10.1162/108819802320971632
Nakamura, 2006, A waste input–output life-cycle cost analysis of the recycling of end-of-life electrical home appliances, Ecological Economics, 57, 494, 10.1016/j.ecolecon.2005.05.002
Nakashima, 2002, Analysis of a product recovery system, International Journal of Production Research, 40, 3849, 10.1080/00207540210132706
Nakashima, 2004, Optimal control of a remanufacturing system, International Journal of Production Research, 42, 3619, 10.1080/00207840410001721772
O'Shea, 1998, State of the art literature survey on disassembly planning, Concurrent Engineering, 6, 345, 10.1177/1063293X9800600407
Oh, 2006, Deterministic inventory model for recycling system, Journal of Intelligent Manufacturing, 17, 423, 10.1007/s10845-005-0015-8
Ostlin, 2008, Importance of closed-loop supply chain relationships for product remanufacturing, International Journal of Production Economics, 115, 336, 10.1016/j.ijpe.2008.02.020
Pan, 2001, A knowledge base for indexing and retrieving disassembly plans, Journal of Intelligent Manufacturing, 12, 77, 10.1023/A:1008907714950
Park, 2008, Quantifying producer and consumer-based eco-efficiencies for the identification of key ecodesign issues, Journal of Cleaner Production, 16, 95, 10.1016/j.jclepro.2006.11.003
Pati, 2008, A goal programming model for paper recycling system, Omega, 36, 405, 10.1016/j.omega.2006.04.014
Pento, 1999, Design for recyclability and the avoidance of waste: the case of printed paper in Germany, Waste Management and Research, 17, 93, 10.1177/0734242X9901700205
Pishvaee, M., Kianfar, K., Karimi, B. Reverse logistics network design using simulated annealing. The International Journal of Advanced Manufacturing Technology, in press, doi:10.1007/s00170-009-2194-5.
Platcheck, 2008, Methodology of ecodesign for the development of more sustainable electro-electronic equipments, Journal of Cleaner Production, 16, 75, 10.1016/j.jclepro.2006.10.006
Pochampally, 2005, Strategic planning of a reverse supply chain network, International Journal of Integrated Supply Management, 1, 421, 10.1504/IJISM.2005.006304
Pochampally, 2008, A multiphase fuzzy logic approach to strategic planning of a reverse supply chain network, IEEE Transactions on Electronics Packaging Manufacturing, 31, 72, 10.1109/TEPM.2007.914229
Pochampally, 2009, Reverse supply chain design: a neural network approach, 283
Pochampally, 2009, Metrics for performance measurement of a reverse/closed-loop supply chain, International Journal of Business Performance and Supply Chain Modelling, 1, 8, 10.1504/IJBPSCM.2009.026263
Pochampally, 2009, Eco-procurement strategies for environmentally conscious manufacturers, International Journal of Logistics Systems and Management, 5, 106, 10.1504/IJLSM.2009.021647
Pochampally, 2009
Pokharel, 2009, Perspectives in reverse logistics: a review, Resources, Conservation and Recycling, 53, 175, 10.1016/j.resconrec.2008.11.006
Prahinski, 2006, Empirical research opportunities in reverse supply chains, Omega, 34, 519, 10.1016/j.omega.2005.01.003
Presley, 2007, A strategic sustainability justification methodology for organizational decisions: a reverse logistics illustration, International Journal of Production Research, 45, 4595, 10.1080/00207540701440220
Qian, 2009, Design for environment: an environmentally conscious analysis model for modular design, IEEE Transactions on Electronics Packaging Manufacturing, 32, 164, 10.1109/TEPM.2009.2022544
Qiaolun, 2008, Pricing management for a closed-loop supply chain, Journal of Revenue and Pricing Management, 7, 45, 10.1057/palgrave.rpm.5160122
Qin, Z., Ji, X. Logistics network design for product recovery in fuzzy environment. European Journal of Operational Research, in press, doi:10.1016/j.ejor.2009.05.036.
Qu, 2008, An analytical model for reverse automotive production planning and pricing, European Journal of Operational Research, 190, 756, 10.1016/j.ejor.2007.06.041
Rahimifard, 2004, A web-based information system to support end-of-life product recovery, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 218, 1047, 10.1243/0954405041897004
Rai, 2002, Disassembly sequence generation: a Petri net based heuristic approach, International Journal of Production Research, 40, 3183, 10.1080/00207540210146116
Rao, 2005, Do green supply chains lead to competitiveness and economic performance?, International Journal of Operations & Production Management, 25, 898, 10.1108/01443570510613956
Rao, 2007
Rao, 2009, An improved compromise ranking method for evaluation of environmentally conscious manufacturing programs, International Journal of Production Research, 47, 4399, 10.1080/00207540701871077
Ravi, 2005, Analysis of interactions among the barriers of reverse logistics, Technological Forecasting and Social Change, 72, 1011, 10.1016/j.techfore.2004.07.002
Ravi, 2005, Analyzing alternatives in reverse logistics for end-of-life computers: ANP and balanced scorecard approach, Computers & Industrial Engineering, 48, 327, 10.1016/j.cie.2005.01.017
Ravi, 2008, Selection of a reverse logistics project for end-of-life computers: ANP and goal programing approach, International Journal of Production Research, 46, 4849, 10.1080/00207540601115989
Realff, 1999, Carpet recycling: determining the reverse production system design, Polymer-Plastics Technology and Engineering, 38, 547, 10.1080/03602559909351599
Realff, 2000, Modeling and decision-making for reverse production system design for carpet recycling, Journal of the Textile Institute, 91, 168, 10.1080/00405000008659550
Realff, 2000, Strategic design of reverse production systems, Computers & Chemical Engineering, 24, 991, 10.1016/S0098-1354(00)00418-X
Realff, 2004, Robust reverse production system design for carpet recycling, IIE Transactions, 36, 767, 10.1080/07408170490458580
Reveliotis, 2007, Uncertainty management in optimal disassembly planning through learning-based strategies, IIE Transactions, 39, 645, 10.1080/07408170600897536
Richter, 1996, The EOQ repair and waste disposal model with variable setup numbers, European Journal of Operational Research, 95, 313, 10.1016/0377-2217(95)00276-6
Richter, 1996, The extended EOQ repair and waste disposal model, International Journal of Production Economics, 45, 443, 10.1016/0925-5273(95)00143-3
Richter, 1997, Pure and mixed strategies for the EOQ repair and waste disposal problem, OR Spectrum, 19, 123, 10.1007/BF01545511
Richter, 1999, Analysis of the EOQ repair and waste disposal problem with integer setup numbers, International Journal of Production Economics, 59, 463, 10.1016/S0925-5273(98)00110-8
Richter, 2000, Remanufacturing planning for the reverse Wagner/Whitin models, European Journal of Operational Research, 121, 304, 10.1016/S0377-2217(99)00219-2
Richter, 2001, The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost, International Journal of Production Economics, 71, 447, 10.1016/S0925-5273(00)00142-0
Richter, 2003, The market-oriented dynamic product recovery model in the just-in-time framework, International Journal of Production Economics, 81, 369, 10.1016/S0925-5273(02)00293-1
Rios, 2004, Scheduling selective disassembly for plastics recovery in an electronics recycling center, IEEE Transactions on Electronics Packaging Manufacturing, 27, 187, 10.1109/TEPM.2004.843128
Ritchey, 2005, A framework to assess the economic viability of remanufacturing, International Journal of Industrial Engineering, 12, 89
Robotis, 2005, The effect of remanufacturing on procurement decisions for resellers in secondary markets, European Journal of Operational Research, 163, 688, 10.1016/j.ejor.2004.01.013
Rose, 1999, Product end-of-life strategy categorization design tool, Journal of Electronics Manufacturing, 9, 41, 10.1142/S0960313199000271
Roy, 2009, A production-inventory model with remanufacturing for defective and usable items in fuzzy-environment, Computers & Industrial Engineering, 56, 87, 10.1016/j.cie.2008.04.004
Rubio, 2008, Optimal manufacturing-remanufacturing policies in a lean production environment, Computers & Industrial Engineering, 55, 234, 10.1016/j.cie.2007.12.009
Rubio, 2008, Characteristics of the research on reverse logistics (1995–2005), International Journal of Production Research, 46, 1099, 10.1080/00207540600943977
Saen, R.F. A new model for selecting third-party reverse logistics providers in the presence of multiple dual-role factors. The International Journal of Advanced Manufacturing Technology, in press, doi:10.1007/s00170-009-2092-x.
Sakao, 2007, A QFD-centred design methodology for environmentally conscious product design, International Journal of Production Research, 45, 4143, 10.1080/00207540701450179
Salema, 2005, A warehouse-based design model for reverse logistics, Journal of the Operational Research Society, 57, 615, 10.1057/palgrave.jors.2602035
Salema, 2007, An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty, European Journal of Operational Research, 179, 1063, 10.1016/j.ejor.2005.05.032
Salema, M.I.G., Barbosa-Povoa, A.P., Novais, A.Q. Simultaneous design and planning of supply chains with reverse flows: a generic modelling framework. European Journal of Operational Research, in press, doi:10.1016/j.ejor.2009.08.002.
Santochi, 2002, Computer aided disassembly planning: state of the art and perspectives, CIRP Annals – Manufacturing Technology, 51, 507, 10.1016/S0007-8506(07)61698-9
Santos-Reyes, 2001, A design for the environment methodology to support an environmental management system, Integrated Manufacturing Systems, 12, 323, 10.1108/EUM0000000005710
Sarin, 2006, A precedence-constrained asymmetric traveling salesman model for disassembly optimization, IIE Transactions, 38, 223, 10.1080/07408170500436740
Sarkis, 1998, Evaluating environmentally conscious business practices, European Journal of Operational Research, 107, 159, 10.1016/S0377-2217(97)00160-4
Sarkis, 1999, A methodological framework for evaluating environmentally conscious manufacturing programs, Computers & Industrial Engineering, 36, 793, 10.1016/S0360-8352(99)00166-7
Sarkis, 2001, An empirical evaluation of environmental efficiencies and firm performance: pollution prevention versus end-of-pipe practice, European Journal of Operational Research, 135, 102, 10.1016/S0377-2217(00)00306-4
Sarkis, 2004, Ecoefficiency measurement using data envelopment analysis: research and practitioner issues, Journal of Environmental Assessment Policy & Management, 6, 91, 10.1142/S1464333204001602
Sasikumar, 2008, Issues in reverse supply chains, part II: reverse distribution issues - an overview, International Journal of Sustainable Engineering, 1, 234, 10.1080/19397030802509974
Sasikumar, 2008, Issues in reverse supply chains, part I: end-of-life product recovery and inventory management – an overview, International Journal of Sustainable Engineering, 1, 154, 10.1080/19397030802433860
Sasikumar, 2009, Issues in reverse supply chain, part III: classification and simple analysis, International Journal of Sustainable Engineering, 2, 2, 10.1080/19397030802673374
Savaskan, 2006, Reverse channel design: the case of competing retailers, Management Science, 52, 1, 10.1287/mnsc.1050.0454
Savaskan, 2004, Closed-loop supply chain models with product remanufacturing, Management Science, 50, 239, 10.1287/mnsc.1030.0186
Sbihi, 2007, Combinatorial optimization and green logistics, 4OR: A Quarterly Journal of Operations Research, 5, 99, 10.1007/s10288-007-0047-3
Schrady, 1967, A deterministic inventory model for repairable items, Naval Research Logistics Quarterly, 14, 391, 10.1002/nav.3800140310
Schroter, 2004, Designing control management systems for parts recovery and spare parts management in the final phase within closed-loop supply chains, International Journal of Integrated Supply Management, 1, 158, 10.1504/IJISM.2004.004863
Schultmann, 2003, Closed-loop supply chains for spent batteries, Interfaces, 33, 57, 10.1287/inte.33.6.57.25183
Schultmann, 2006, Modeling reverse logistic tasks within closed-loop supply chains: an example from the automotive industry, European Journal of Operational Research, 171, 1033, 10.1016/j.ejor.2005.01.016
Seliger, 2002, Innovative processes and tools for disassembly, CIRP Annals – Manufacturing Technology, 51, 37, 10.1016/S0007-8506(07)61460-7
Seo, 2001, Optimal disassembly sequence using genetic algorithms considering economic and environmental aspects, The International Journal of Advanced Manufacturing Technology, 18, 371, 10.1007/s001700170061
Serrato, 2007, A Markov decision model to evaluate outsourcing in reverse logistics, International Journal of Production Research, 45, 4289, 10.1080/00207540701450161
Sharma, 2007, Asset management with reverse product flows and environmental considerations, Computers & Operations Research, 34, 464, 10.1016/j.cor.2005.03.009
Sheu, 2005, An integrated logistics operational model for green-supply chain management, Transportation Research Part E, 41, 287, 10.1016/j.tre.2004.07.001
Shih, 2001, Reverse logistics system planning for recycling electrical appliances and computers in Taiwan, Resources, Conservation and Recycling, 32, 55, 10.1016/S0921-3449(00)00098-7
Shih, 2006, Intelligent evaluation approach for electronic product recycling via case-based reasoning, Advanced Engineering Informatics, 20, 137, 10.1016/j.aei.2005.11.003
Shimizu, 2007, Optimal disassembly sequence generation using a genetic programming, International Journal of Production Research, 45, 4537, 10.1080/00207540701440261
Sim, 2004, A generic network design for a closed-loop supply chain using genetic algorithm, 1214
Simpson, 1978, Optimum solution structure for a repairable inventory problem, Operations Research, 26, 270, 10.1287/opre.26.2.270
Singh, 2003, Modelling and planning of the disassembly processes using an enhanced expert Petri net, International Journal of Production Research, 41, 3761, 10.1080/0020754031000109125
Sodhi, 1999, Modelling material separation processes in bulk recycling, International Journal of Production Research, 37, 2239, 10.1080/002075499190743
Souza, 2002, Two-stage make-to-order remanufacturing with service-level constraints, International Journal of Production Research, 40, 477, 10.1080/00207540110090920
Souza, 2002, Capacitated remanufacturing with service level constraints, Production and Operations Management, 11, 231, 10.1111/j.1937-5956.2002.tb00493.x
Spengler, 2003, Strategic management of spare parts in closed-loop supply chains – a system dynamics approach, Interfaces, 33, 7, 10.1287/inte.33.6.7.25179
Srivastava, 2007, Green supply-chain management: a state-of-the-art literature review, International Journal of Management Reviews, 9, 53, 10.1111/j.1468-2370.2007.00202.x
Srivastava, 2008, Value recovery network design for product returns, International Journal of Physical Distribution & Logistics Management, 38, 311, 10.1108/09600030810875409
Staikos, 2007, A decision-making model for waste management in the footwear industry, International Journal of Production Research, 45, 4403, 10.1080/00207540701450187
Staikos, 2007, An end-of-life decision support tool for product recovery considerations in the footwear industry, International Journal of Computer Integrated Manufacturing, 20, 602, 10.1080/09511920701416549
Stuart, 2003, New metrics and scheduling rules for disassembly and bulk recycling, IEEE Transactions on Electronics Packaging Manufacturing, 26, 133, 10.1109/TEPM.2003.817723
Subramoniam, 2009, Remanufacturing for the automotive aftermarket-strategic factors: literature review and future research needs, Journal of Cleaner Production, 17, 1163, 10.1016/j.jclepro.2009.03.004
Tagaras, 2008, Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites, International Journal of Production Economics, 115, 424, 10.1016/j.ijpe.2007.10.026
Takahashi, 2007, Inventory control for a MARKOVIAN remanufacturing system with stochastic decomposition process, International Journal of Production Economics, 108, 416, 10.1016/j.ijpe.2006.12.023
Takata, 2001, Disassembly operation support system with motion monitoring of a human operator, CIRP Annals – Manufacturing Technology, 50, 305, 10.1016/S0007-8506(07)62127-1
Taleb, 1997, Disassembly of multiple product structures, Computers & Industrial Engineering, 32, 949, 10.1016/S0360-8352(97)00023-5
Taleb, 1997, Disassembly of complex product structures with parts and materials commonality, Production Planning & Control, 8, 255, 10.1080/095372897235316
Tan, 2008, A decision making model to maximise the value of reverse logistics in the computer industry, International Journal of Logistics Systems and Management, 4, 297, 10.1504/IJLSM.2008.017478
Tang, 2004, The impact of information transparency on the dynamic behaviour of a hybrid manufacturing/remanufacturing system, International Journal of Production Research, 42, 4135, 10.1080/00207540410001716499
Tang, 2005, Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns, International Journal of Production Economics, 93, 285, 10.1016/j.ijpe.2004.06.027
Tang, 2006, Economic lot scheduling problem with returns, Production & Operations Management, 15, 488, 10.1111/j.1937-5956.2006.tb00158.x
Tang, 2006, A systematic approach to design and operation of disassembly lines, IEEE Transactions on Automation Science and Engineering, 3, 324, 10.1109/TASE.2005.860989
Tang, 2008, Human-in-the-loop disassembly modeling and planning
Tang, 2001, An integrated approach to disassembly planning and demanufacturing operation, IEEE Transactions on Robotics and Automation, 17, 773, 10.1109/70.975899
Tang, 2002, Disassembly modeling, planning, and application, Journal of Manufacturing Systems, 21, 200, 10.1016/S0278-6125(02)80162-5
Tang, 2004, Economic evaluation of disassembly processes in remanufacturing systems, International Journal of Production Research, 42, 3603, 10.1080/00207540410001699435
Tang, 2006, Fuzzy-Petri-net based disassembly planning considering human factors, IEEE Transactions on Systems, Man and Cybernetics, 36, 718, 10.1109/TSMCA.2005.853508
Tang, 2007, Planned lead time determination in a make-to-order remanufacturing system, International Journal of Production Economics, 108, 426, 10.1016/j.ijpe.2006.12.034
Teunter, 2001, Economic ordering quantities for recoverable item inventory systems, Naval Research Logistics, 48, 484, 10.1002/nav.1030
Teunter, 2004, Lot-sizing for inventory systems with product recovery, Computers & Industrial Engineering, 46, 431, 10.1016/j.cie.2004.01.006
Teunter, 2006, Determining optimal disassembly and recovery strategies, Omega, 34, 533, 10.1016/j.omega.2005.01.014
Teunter, 2002, On the non-optimality of the average cost approach for inventory models with remanufacturing, International Journal of Production Economics, 79, 67, 10.1016/S0925-5273(00)00085-2
Teunter, 2000, How to set the holding cost rates in average cost inventory models with reverse logistics?, Omega, 28, 409, 10.1016/S0305-0483(99)00070-5
Teunter, 2004, Inventory strategies for systems with fast remanufacturing, Journal of the Operational Research Society, 55, 475, 10.1057/palgrave.jors.2601687
Teunter, 2006, Dynamic lot sizing with product returns and remanufacturing, International Journal of Production Research, 44, 4377, 10.1080/00207540600693564
Teunter, 2008, Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing, European Journal of Operational Research, 191, 1241, 10.1016/j.ejor.2007.08.003
Tiwari, 2001, A Petri net based approach to determine the disassembly strategy of a product, International Journal of Production Research, 40, 1113, 10.1080/00207540110097176
Toktay, 2000, Inventory management of remanufacturable products, Management Science, 46, 1412, 10.1287/mnsc.46.11.1412.12082
Toktay, 2004, Managing product returns: the role of forecasting, 45
Torres, 2003, Disassembly planning based on precedence relations among assemblies, International Journal of Advanced Manufacturing Technology, 21, 317, 10.1007/s001700300037
Torres, 2004, Automatic PC disassembly for component recovery, International Journal of Advanced Manufacturing Technology, 23, 39, 10.1007/s00170-003-1590-5
Tripathi, 2009, Real world disassembly modeling and sequencing problem: optimization by algorithm of self-guided ants (ASGA), Robotics and Computer-Integrated Manufacturing, 25, 483, 10.1016/j.rcim.2008.02.004
Tsai, 2009, Treatment and recycling system optimisation with activity-based costing in WEEE reverse logistics management: an environmental supply chain perspective, International Journal of Production Research, 47, 5391, 10.1080/00207540801927183
Tseng, 2008, Modular design to support green life-cycle engineering, Expert Systems with Applications, 34, 2524, 10.1016/j.eswa.2007.04.018
Tuzkaya, 2008, Evaluating centralized return centers in a reverse logistics network: an integrated fuzzy multi-criteria decision approach, International Journal of Environmental Science and Technology, 5, 339, 10.1007/BF03326029
Uster, 2007, Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model, Naval Research Logistics, 54, 890, 10.1002/nav.20262
Vadde, 2007, Optimal pricing of reusable and recyclable components under alternative product acquisition mechanisms, International Journal of Production Research, 45, 4621, 10.1080/00207540701449973
van der Laan, 2003, An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing, International Journal of Production Economics, 81–82, 317, 10.1016/S0925-5273(02)00297-9
van der Laan, 1997, Production planning and inventory control with remanufacturing and disposal, European Journal of Operational Research, 102, 264, 10.1016/S0377-2217(97)00108-2
van der Laan, 1996, Product remanufacturing and disposal: a numerical comparison of alternative control strategies, International Journal of Production Economics, 45, 489, 10.1016/0925-5273(95)00137-9
van der Laan, 1996, An (s, Q) inventory model with remanufacturing and disposal, International Journal of Production Economics, 46, 339, 10.1016/0925-5273(95)00020-8
van der Laan, 1999, An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies, European Journal of Operational Research, 115, 195, 10.1016/S0377-2217(98)00108-8
van der Laan, 1999, Inventory control in hybrid systems with remanufacturing, Management Science, 45, 733, 10.1287/mnsc.45.5.733
van der Laan, 2006, Simple heuristics for push and pull remanufacturing policies, European Journal of Operational Research, 175, 1084, 10.1016/j.ejor.2005.06.030
Veerakamolmal, 1998, Optimal analysis of lot-size balancing for multiproducts selective disassembly, International Journal of Flexible Automation and Integrated Manufacturing, 6, 245
Veerakamolmal, 1999, Analysis of design efficiency for the disassembly of modular electronic products, Journal of Electronics Manufacturing, 9, 79, 10.1142/S0960313199000301
Veerakamolmal, 2000, Design for disassembly, reuse and recycling, 69
Veerakamolmal, 2002, A case-based reasoning approach for automating disassembly process planning, Journal of Intelligent Manufacturing, 13, 47, 10.1023/A:1013629013031
Villalba, 2004, Using the recyclability index of materials as a tool for design for disassembly, Ecological Economics, 50, 195, 10.1016/j.ecolecon.2004.03.026
Villalba, 2002, A proposal for quantifying the recyclability of materials, Resources, Conservation and Recycling, 37, 39, 10.1016/S0921-3449(02)00056-3
Viswanathan, 2001, Configuration analysis to support product redesign for end-of-life disassembly, International Journal of Production Research, 39, 1733, 10.1080/00207540110034887
Viswanathan, 2006, Product configuration optimization for disassembly planning: a differential approach, Omega, 34, 599, 10.1016/j.omega.2005.01.011
Vlachos, 2003, Return handling options and order quantities for single period products, European Journal of Operational Research, 151, 38, 10.1016/S0377-2217(02)00596-9
Vlachos, 2007, A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains, Computers & Operations Research, 34, 367, 10.1016/j.cor.2005.03.005
Vorasayan, 2006, Optimal price and quantity of refurbished products, Production & Operations Management, 15, 369, 10.1111/j.1937-5956.2006.tb00251.x
Wadhwa, 2009, Flexible decision modeling of reverse logistics system: a value adding MCDM approach for alternative selection, Robotics and Computer-Integrated Manufacturing, 25, 460, 10.1016/j.rcim.2008.01.006
Wagner, 2001, The relationship between the environmental and economic performance of firms, Greener Management International, 34, 95
Walther, 2008, Negotiation-based coordination in product recovery networks, International Journal of Production Economics, 111, 334, 10.1016/j.ijpe.2006.12.069
Wang, 2010, A closed-loop logistic model with a spanning-tree based genetic algorithm, Computers & Operations Research, 37, 376, 10.1016/j.cor.2009.06.001
Wang, 2007, Fast heuristics for designing integrated e-waste reverse logistics networks, IEEE Transactions on Electronics Packaging Manufacturing, 30, 147, 10.1109/TEPM.2007.899112
Wang, 2007, A new location-inventory policy with reverse logistics applied to B2C e-markets of China, International Journal of Production Economics, 107, 350, 10.1016/j.ijpe.2006.09.012
Webster, 2007, Competitive strategy in remanufacturing and the impact of take-back laws, Journal of Operations Management, 25, 1123, 10.1016/j.jom.2007.01.014
Wee, 2006, Optimal ordering and recovery policy for reusable items with shortages, Lecture Notes in Computer Science, 4247, 284, 10.1007/11903697_37
Weigl-Seitz, 2006, On strategies and solutions for automated disassembly of electronic devices, The International Journal of Advanced Manufacturing Technology, 30, 561, 10.1007/s00170-005-0043-8
Wiendahl, 2001, Flexible disassembly systems-layouts and modules for processing obsolete products, Proceedings of the Institution of Mechanical Engineers, Part B: Engineering Manufacture, 215, 723, 10.1243/0954405011518520
Willems, 2006, Can large-scale disassembly be profitable? A linear programming approach to quantifying the turning point to make disassembly economically viable, International Journal of Production Research, 44, 1125, 10.1080/00207540500354168
Williams, 2006, A review of electronics demanufacturing processes, Resources, Conservation and Recycling, 47, 195, 10.1016/j.resconrec.2005.11.003
Williams, 2007, A review of research towards computer integrated demanufacturing for materials recovery, International Journal of Computer Integrated Manufacturing, 20, 773, 10.1080/09511920601079322
Williams, 2007, An automotive bulk recycling planning model, European Journal of Operational Research, 177, 969, 10.1016/j.ejor.2006.01.031
Wojanowski, 2007, Retail-collection network design under deposit-refund, Computers & Operations Research, 34, 324, 10.1016/j.cor.2005.03.003
Wright, 2005, Improving recyclability by design: a case study of fibre optic cable, Resources, Conservation & Recycling, 44, 37, 10.1016/j.resconrec.2004.09.005
Xanthopoulos, 2009, On the optimal design of the disassembly and recovery processes, Waste Management, 29, 1702, 10.1016/j.wasman.2008.11.009
Yalabik, 2005, An integrated product returns model with logistics and marketing coordination, European Journal of Operational Research, 161, 162, 10.1016/j.ejor.2003.07.006
Yang, 2009, The optimization of the closed-loop supply chain network, Transportation Research Part E, 45, 16, 10.1016/j.tre.2008.02.007
Yang, 2005, A concave-cost production planning problem with remanufacturing options, Naval Research Logistics, 52, 443, 10.1002/nav.20089
Yao, 2005, Demand uncertainty and manufacturer returns policies for style-good retailing competition, Production Planning & Control, 16, 691, 10.1080/09537280500274148
Yongjian, 2006, Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution, OR Spectrum, 28, 98
Zanoni, 2006, Cost performance and bullwhip effect in a hybrid manufacturing and remanufacturing system with different control policies, International Journal of Production Research, 44, 3847, 10.1080/00207540600857375
Zeid, 1997, A case-based reasoning approach to planning for disassembly, Journal of Intelligent Manufacturing, 8, 97, 10.1023/A:1018500603358
Zha, 2000, Assembly/disassembly task planning and simulation using expert Petri nets, International Journal of Production Research, 38, 3639, 10.1080/002075400422833
Zhang, 1997, Environmentally conscious design and manufacturing: a state-of-the-art survey, Journal of Manufacturing Systems, 16, 352, 10.1016/S0278-6125(97)88465-8
Zhang, 1999, Green QFD-II: a life cycle approach for environmentally conscious manufacturing by integrating LCA and LCC into QFD matrices, International Journal of Production Research, 37, 1075, 10.1080/002075499191418
Zhou, 2009, Multi-objective optimization of material selection for sustainable products: artificial neural networks and genetic algorithm approach, Materials & Design, 30, 1209, 10.1016/j.matdes.2008.06.006
Zhou, 2005, A genetic algorithm approach on reverse logistics optimization for product return distribution network, 267
Zhou, 2006, Bullwhip and inventory variance in a closed loop supply chain, OR Spectrum, 28, 123, 10.1007/s00291-005-0009-0
Zhou, 2006, Dynamic performance of a hybrid inventory system with a kanban policy in remanufacturing process, Omega, 34, 585, 10.1016/j.omega.2005.01.007
Zhu, 2003, Application of bayesian decision networks to life cycle engineering in green design and manufacturing, Engineering Applications of Artificial Intelligence, 16, 91, 10.1016/S0952-1976(03)00057-5
Zhu, 2004, Relationships between operational practices and performance among early adopters of green supply chain management practices in Chinese manufacturing enterprises, Journal of Operations Management, 22, 265, 10.1016/j.jom.2004.01.005
Zhu, 2005, Green supply chain management in China: pressures, practices and performance, International Journal of Operations & Production Management, 25, 449, 10.1108/01443570510593148
Zhu, 2007, Initiatives and outcomes of green supply chain management implementation by Chinese manufacturers, Journal of Environmental Management, 85, 179, 10.1016/j.jenvman.2006.09.003
Zikopoulos, 2007, Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation, European Journal of Operational Research, 182, 205, 10.1016/j.ejor.2006.10.025
Zikopoulos, 2008, On the attractiveness of sorting before disassembly in remanufacturing, IIE Transactions, 40, 313, 10.1080/07408170701488078
Zuidwijk, 2008, Strategic response to EEE returns: product eco-design or new recovery processes?, European Journal of Operational Research, 191, 1206, 10.1016/j.ejor.2007.08.004
Zussman, 1999, A methodology for modeling and adaptive planning of disassembly processes, IEEE Transactions on Robotics and Automation, 15, 190, 10.1109/70.744614