Effective Iterated Greedy Algorithm for Flow-Shop Scheduling Problems with Time lags

Chinese Journal of Mechanical Engineering - Tập 30 Số 3 - Trang 652-662 - 2017
Ning Zhao1, Song Ye1, Kaidian Li1, Siyu Chen1
1School of Mechanical Engineering, University of Science and Technology Beijing, Beijing 100083, China

Tóm tắt

Từ khóa


Tài liệu tham khảo

HODSON A, MUHLEMANN A P, PRICE D H R. A microcomputer based solution to a practical scheduling problem[J]. Journal of the Operational Research Society, 1985, 36(10): 903–914.

FONDREVELLE J, OULAMARA A, PORTMANN M C. Permutation flowshop scheduling problems with maximal and minimal time lags[J]. Computers & Operations Research, 2006, 33: 1540–1556.

SOUKHAL A, OULAMARA A, MARTINEAU P. Complexity of flow shops scheduling problems with transportation constraints[J]. European Journal of Operational Research, 2005, 161(1): 32–41.

CHU C, PROTH J. Single machine scheduling with chain structured precedence constraints and separation time windows[J]. IEEE Transactions on Robotics and Automation, Dec, 1996, 12(6): 835–843.

KIM Y D, LIM H G, PARK M-W. Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process[J]. European Journal of Operational Research, 1996, 91(1): 124–143.

MANIER M A, BLOCH, C. A classification of hoist scheduling problems[J]. International Journal of Flexible Manufacturing Systems, 2003, 15(1): 37–55.

YANG D L, CHERN M S. A two-machine flowshop sequencing problem with limited waiting time constraints[J]. Computers & Industrial Engineering, 1995, 28(1): 63–70.

TANG Dunbing, DAI Min. Energy-efficient approach to minimizing the energy consumption in an extended Job-shop scheduling problem[J]. Chinese Journal of Mechanical Engineering, 2015, 28(5): 1048–1055.

NAWAZ M, ENSCORE J E E, HAM I. A heuristic algorithm for the n-job, m-machine sequencing problem[J]. Management Science 1983 16/B: 630–637.

HAMDI I, LOUKIL T. Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags[J]. Operational Research, 2015, 15(1): 95–114.

NIKBAKHSH J P, MOHAMMAD F M, MOHAMMAD K. An immune algorithm for hybrid flow shop scheduling problem with time lags and sequence-dependent setup times[J]. The International Journal of Advanced Manufacturing Technology, 2012, 63(1–4): 337–348.

DHOUIB E, TEGHEM J, LOUKIL T. Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraints[J]. International Transactions in Operational Research, 2013, 20(2): 213–232.

SHEIKH S. Multi-objective flexible flow lines with due window, time lag, and job rejection [J]. The International Journal of Advanced Manufacturing Technology, 2013, 64(9–12): 1423–1433.

WANG B L, WANG H F, LI T K. Gene exchange operators of partheno-genetic algorithm for permutation flowshop scheduling with maximum and minimum time lag constraints[C]//2015 International Conference on Material Engineering and Information Technology Applications(MEITA), Guilin, Aug 30–31, 2015: 596–600.

AMROUCHE K, BOUDHAR M. Two machines flow shop with reentrance and exact time lag[J]. RAIRO-Operations Research, 2016, 50(2): 223–232.

SANG H, GAO L, PAN Q K. Discrete artificial bee colony algorithm for lot-streaming flowshop with total flowtime minimization[J]. Chinese Journal of Mechanical Engineering, 2012, 25(5): 990-1000.

ZHAO N, CHEN S Y, DU Y H. Emergency local searching approach for Job shop scheduling[J]. Chinese Journal of Mechanical Engineering, 2013, 26(5): 918–927.

CAUMOND A, LACOMME P, TCHERNEV N. A memetic algorithm for the job-shop with time lags[J]. Computers & Operations Research, 2008, 35(7): 2331–2356.

ARTIGUES C, HUGUET M J, LOPEZ P. Generalized disjunctive constraint propagation for solving the job shop problem with time lags[J]. Engineering Applications of Artificial Intelligence, 2011, 24(2): 220–231.

GONZALEZ M A, ODDI A, RASCONI R, et al. Scatter search with path relinking for the job shop with time lags and setup times[J]. Computers & Operations Research, 2015, 60: 37–54.

AFSAR H M, LACOMME P, REN L, et al. Resolution of a Job-Shop problem with transportation constraints: a master/slave approach[J]. IFAC-PapersOnLine, 2016, 49(12): 898–903.

JOHNSON S M. Optimal two-and three-stage production schedules with setup times included[J]. Naval Research Logistics Quarterly, 1954, 1(1): 61–68.

RUIZ R, STUTZLE T. A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem[J]. European Journal of Operational Research, 2007, 177: 2033–2049.

PAN Q K, WANG L, ZHAO B H. An improved iterated greedy algorithm for the no-wait flow shop scheduling problem with makespan criterion[J]. The International Journal of Advanced Manufacturing Technology, 2008 38 (7–8): 778–786.

DING J Y, SONG S J, ZHANG R et al. Accelerated methods for total tardiness minimization in no-wait flowshops[J]. International Journal of Production Research, 2015, 53(4): 1002–1018.

YING K C. Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic[J]. The International Journal of Advanced Manufacturing Technology, 2008, 38(3-4): 348–354.

HARRISON R, VERA D, AHMAD B. Engineering the smart factory[J]. Chinese Journal of Mechanical Engineering, 2016, 29(6): 1046–1051.

CHEN D N, ZHANG R X, YAO C Y, et al. Dynamic topology multi force particle swarm optimization algorithm and its application[J]. Chinese journal of mechanical engineering, 2016, 29(1): 124–135.

WANG Y Y, MOU S D, WU Y H. Storage assignment optimization in a multi-tier shuttle warehousing system[J]. Chinese journal of mechanical engineering, 2016, 29(2): 421–429.

BUCKER P, KNUST S, CHENG T C E, et al. Complexity results for flow-shop and open-shop scheduling problems with transportation delays[J]. Annals of Operations Research, 2004, 129(1–4): 81–106.

DELL’AMICO M. Shop problems with two machines and time lags[J]. Operations Research, 1996, 44(5): 777–787.

MITTEN L G. Sequencing n jobs on two machines with arbitrary time lags[J]. Management Science, 1959, 5(3): 293–298.

OSMAN I H, POTTS C N. Simulated annealing for permutation flow-shop scheduling[J]. Omega, 1989, 17(6): 551–557.

HAMDI I, LOUKIL T. Minimizing the makespan in the permutation flowshop problem with maximal and minimal time lags[C]//2011 International Conference on Communications, Computing and Control Applications(CCCA), Hammamet, March 3–5, 2011: 1–6.