Economics of Combined Lot and Job Production with Consideration for Process Variables

CIRP Annals - Tập 29 - Trang 325-328 - 1980
G.L. Ravignani1, Q. Semeraro2
1Milan, Italy
2ITB, University of Bari/Italy

Tài liệu tham khảo

Elmaghraoy, 1973, The Economic Lot Scheduling Problem (ELSP): Review and Extensions, Management Science, 24, 587, 10.1287/mnsc.24.6.587 Ravignani, 1977, Optmurg von Abspanverfahren mit vorgegebehen Grenzen”, Werkstattstechnik, 249 G.L. Ravignani, “Some Relevant Factors in Economic Process Scheduling”. Proc. 8th. Int. CTRP Seminar on Manufacturing Systems, Ivrea 1976, 11/13. Q. Semeraro, “Interrelazione fra lotto economico di fabbricazione e variabili di processo”. Annali della Facolta de Ingegneria, Bari, Vol. III, 1973. Q. Semeraro, G.L. Ravignani, “A Contribution to Scheduling for Minimum Overall Cost in Cell Manufacture”. Proc. 20th Int. MTDR Conf., 1979, 517-523. Ravignani, 1978, A Computational Algorithm for Direct Application of Tool Life Values in Machining Economics, CIRP Annals, 27, 459 Ravignani, 1979, Multi-Tool Machining Analysis - Part 2, Economic Evaluation in View of Tool Life Scatter, Trans. ASME, J. Eng. for Ind., 101, 237, 10.1115/1.3439501