Dynamic dilemma zone based on driver behavior and car-following model at highway–rail intersections
Tài liệu tham khảo
American Association of State Highway and Transportation Officials (AASHTO), 1994. A policy on geometric design of highways and streets, Washington, DC
Coleman III, F., Moon, Y.J., 1997. Design of gate delay and gate interval time for four-quadrant gate system at railroad–highway grade crossings. Transportation Research Record, no. 1553, TRB, National Research Council, Washington, DC, pp. 124–131
Coleman III, F., Moon, Y.J., 1998. Validation of a four quadrant gate simulation model-predicted vs. actual gate operating values. Transportation Research Record, no. 1648, TRB, National Research Council, Washington, DC, pp. 43–50
Crawford, 1962, Driver judgement and error during the amber period at traffic lights, Ergonomics, 5, 298, 10.1080/00140136208930654
Gazis, 1960, The problem of the amber signal light in traffic flow, Operations Research, 8, 112, 10.1287/opre.8.1.112
Herman, 1963, Problem of the amber signal light, Traffic Engineering and Control, 5, 298
Illinois Department of Transportation (IDOT), 1994. National Railroad–Highway Crossing Inventory
ITE Technical Committee 4A-16, 1985. Determining Vehicle Change Intervals. Institute of Transportation Engineers (ITE) Journal, 61–64
May, 1990
Montroll, E.W., Potts, R.B., 1964. Car following and acceleration noise. An introduction to traffic flow theory. Highway Research Board, Special Report 79, HRB, Washington, DC, pp. 37–48
Olson, 1972, Deceleration levels and clearance times associated with the amber phase of traffic signals, Traffic Engineering, 42, 16
Sheffi, 1981, A model of driver behavior at high-speed signalized intersections, Transportation Science, 15, 50, 10.1287/trsc.15.1.50
Zegeer, C., 1977. Effectiveness of green-extension systems at high-speed intersections. Kentucky Department of Transportation, Research Report 472