Dynamic Simulation Model for Estimating In-situ Production Quantity of PC Members
Tóm tắt
Từ khóa
Tài liệu tham khảo
Wang C, Liu M, Hsiang SM, Leming ML (2011) Causes and penalties of variation: case study of a precast concrete slab production facility. J Constr Eng Manag 138(6):775–785. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000475
Sacks R, Eastman CM, Lee G (2001) Process model perspectives on management and engineering procedures in the precast/prestressed concrete industry. J Constr Eng Manag 130(2):206–215. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(206)
Badir YF, Kadir MA, Hashim AH (2002) Industrialized building systems construction in Malaysia. J Archit Eng 8(1):19–23. https://doi.org/10.1061/(ASCE)1076-0431(2002)8:1(19)
Chan WT, Hu H (2002) Constraint programming approach to precast production scheduling. J Constr Eng Manag 128(6):513–521. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(513)
Ma Z, Yang Z, Liu S, Wu S (2018) Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete components. Autom Constr 95:86–97. https://doi.org/10.1016/j.autcon.2018.08.002
Yang Z, Ma Z, Wu S (2016) Optimized flowshop scheduling of multiple production lines for precast production. Autom Constr 72:321–329. https://doi.org/10.1016/j.autcon.2016.08.021
Kim MK, Cheng JC, Sohn H, Chang CC (2015) A framework for dimensional and surface quality assessment of precast concrete elements using BIM and 3D laser scanning. Autom Constr 49:225–238. https://doi.org/10.1016/j.autcon.2014.07.010
Wang Q, Kim MK, Cheng JC, Sohn H (2016) Automated quality assessment of precast concrete elements with geometry irregularities using terrestrial laser scanning. Autom Constr 68:170–182. https://doi.org/10.1016/j.autcon.2016.03.014
Polat G (2008) Factors affecting the use of precast concrete systems in the United States. J Const Eng Manag 134(3):169–178. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:3(169)
Yee AA (2001) Structural and economic benefits of precast/prestressed concrete construction. PCI J 46(4):34–42
Lim J, Son S, Kim JT, Kim S (2017) Experimental study of in situ production of precast concrete members, In: 7th International Conference on construction engineering and project management(ICCEPM), Korea Institute of Construction Engineering and Management, Chengdu, China
Hong WK, Lee G, Lee S, Kim S (2014) Algorithms for in situ production layout of composite precast concrete members. Autom Constr 41:50–59. https://doi.org/10.1016/j.autcon.2014.02.005
Lim C(2016) Construction planning model for in situ production and installation of composite precast concrete frame, Doctoral dissertation, Kyung Hee University
Oh OJ (2017) A model for production and erection integration management of large scale PC structures using system dynamics, Doctoral dissertation, Kyung Hee University
Lim J (2018) A risk management model for in situ production of precast concrete members focused on time and cost using system dynamics, Doctoral dissertation, Kyung Hee University
Lee D, Lim C, Kim S (2016) CO2 emission reduction effects of an innovative composite precast concrete structure applied to heavy loaded and long span buildings. Energy Build 126:36–43. https://doi.org/10.1016/j.enbuild.2016.05.022
Lim J, Kim S (2020) Evaluation of co2 emission reduction effect using in situ production of precast concrete components. J Asian Archit Build Eng 19(2):176–186. https://doi.org/10.1080/13467581.2020.1726763
Moon KJ (2001) A study on the sustainability of an urban system: by the application of a system dynamics model, Doctoral dissertation, Pusan National University
Choi J, Kim H, Kim I (2015) Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage. J Comput Des and Eng 2(1):16–25. https://doi.org/10.1016/j.jcde.2014.11.002
Gransberg DD, Riemer C (2009) Impact of inaccurate engineer’s estimated quantities on unit price ontracts. J Constr Eng Manag 135(11):1138–1145. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000084
Hyari KH, Shatarat N, Khalafallah A (2017) Handling risks of quantity variations in unit-price contracts. J Constr Eng Manag 143(10):04017079. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001393
Yeh IC (1998) Quantity estimating of building with logarithm-neuron networks. J Constr Eng Manag 124(5):374–380. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:5(374)
Cheng TM, Feng CW, Hsu MY (2006) An integrated modeling mechanism for optimizing the simulation model of the construction operation. Autom Constr 15(3):327–340. https://doi.org/10.1016/j.autcon.2005.06.016
Cheng TM, Yan RZ (2009) Integrating messy genetic algorithms and simulation to optimize resource utilization. Comput-Aided Civil Infrastruct Eng 24(6):401–415. https://doi.org/10.1111/j.1467-8667.2008.00588.x
Cho GH, Kim JJ (1996) Integrated management of the production, transportation and installation of precast concrete panels. J Archit Inst Korea 12(3):185–193
Tan B, Huat DCK, Messner JI, Horman MJ (2004) Using simulation for pull-driven scheduling with buffer for precast concrete component fabrication and erection. In: 16th CIB World building congress, international council for research and innovation in building and construction
Cheng TM, Feng CW (2003) An effective simulation mechanism for construction operations. Autom Constr 12(3):227–244. https://doi.org/10.1016/S0926-5805(02)00086-9
Lee SH (2013) Dynamic scheduling model for column-beam system buildings by composite precast concrete members, Doctoral dissertation, Kyung Hee University
Lee S, Hong WK, Lim C, Kim S (2015) A dynamic erection simulation model of column-beam structures using composite precast concrete components. J Intell Rob Syst 79(3–4):537–547. https://doi.org/10.1007/s10846-014-0115-9